SHEAR RAM USE AFFECTED BY ACCUMULATOR SIZE

Brian E. Varcoe Gulf Canada Resources Ltd. Calgary On many onshore drilling operations, once the annular blowout preventer (BOP) is closed, there may be insufficient remaining accumulator pressure to shear the drill pipe immediately. Initial function tests of several onshore accumulator systems identified significant differences between actual and calculated remaining system pressure.

In order to access this content, you must be logged-in and have an active subscription to the OGJ Premium Archive

Subscribe

More in Home