Content Dam Ogj Online Articles 2017 05 Premier Block 7 Mexico
Talos Energy LLC, Houston, has spudded the Zama-1 exploration well on Block 7 in the shallow-water Sureste basin offshore Mexico.
The well’s principal target is the Zama prospect with supportive direct hydrocarbon indicators in the Tertiary clastic reservoirs. The Zama structure is estimated to have a gross unrisked resource range of 100-500 million bbl. The firm is expected to take up to 90 days to drill both the Zama prospect and the secondary target, Zama Deep.
Content Dam Ogj Online Articles 2017 05 Premier Block 7 Mexico
Zama-1 is the first exploration well to be drilled on acreage awarded in Mexico’s first international licensing round in 2015 (OGJ Online, July 16, 2015).
Talos Energy is operator of Block 7 with 35% interest. Partners are Sierra Oil & Gas 40% and Premier Oil PLC 25%.