Gas Processing

Photo from Phillips 66 Co.
Phillips 66 adds Permian basin gas processing capacity
Configured with advanced ethane-extraction capabilities and equipped with a cryogenic gas processing capacity of 220 MMcfd, the Dos Picos II plant entered operation in late July...
Sept. 5, 2025