*Designates projects listed for the first time.
U.S. CRUDE LINES
BLOCK 873 PIPELINE Co. (Partnership). 60 miles, 16 in. line from Gulf of Mexico - Ewing Bank 873 to Ship Shoal 141 under construction. Joint venture of Marathon Oil and Texaco Inc. Completion: 1994.
CELERON Corp. 11 miles, 24 in. line from Gaviota, Calif., to Las Flores, Calif. under construction.
LAKEHEAD PIPELINE Co. *135 miles, 20 in. line from Gretna Manitoba to Viking, Minn. to Clearbrook, Minn. under construction. Completion: November 1994.
PERMIAN OPERATING Ltd. PARTNERSHIP. 13 miles, 6 in. from Dolphin field, Divide County, N.D., southeast to an Amoco pipeline in Burke County, N.D.
TRANSMOUNTAIN OIL PIPELINE. 10 miles, 22-30 in. line in Washington State.
U.S. PRODUCT LINES
CHASE TRANSPORTATION Co. (joint venture with Koch Industries - 50/50). 18 miles product line from Aurora, Colo. terminal to Denver airport. Approved.
CITGO PIPELINE Co. 112 miles, 10-12 in. line from Lake Charles, La. to Mont. Belvieu, Tex. planned. Completion: 1994.
COASTAL Corp. 40 miles, 8 in. line near Markham, Tex.
COLONIAL PIPELINE Co. *19.1 miles, 16 in. line from Ringgold, Ga. to Chattanooga, Tenn. Completion: December 1994.
*10.1 miles, 12 in. line from Powder Springs, Ga. to Vinings, Ga. Completion: July 1995.
DIAMOND SHAMROCK Inc. 400 miles, 10 in. line from McKee Refinery at Sunray, Tex. to El Paso, Tex. Completion: Mid-1995.
KOCH HYDROCARBONS Co. 583 miles, 12 in. replacement line from Medford, Okla., to Mont Belvieu, Tex.
PHILLIPS PIPELINE Co. 1 mile, 6 in. NGL line from Rocky Station to Borger Refinery, Borger, Tex. in engr. stage. Completion: December 1994.
3 miles, 8 in. NGL line from Johnson Junction to Borger Refinery, Borger, Tex. in engr. stage. Completion: December 1994.
U.S. GAS LINES
ALQONUIN GAS TRANSMISSION Co. 3.8 miles, 16 in. replacement line in Oakland and Mahwah, N.J. and 4.9 miles, 36 in. replacement line in Southeast N.Y. Before FERC. $35 MM. Completion: 1994.
ALTAMONT GAS TRANSMISSION Co. 620 miles, 36 in. line from Port of Wild Horse, Mont., to Opal, Wyo. Completion: 1994.
AMERICAN PIPELINE. 38 miles, 16 in. in East Texas to connect Union Pacific Resources Carthage gas processing plant with pipelines to the west.
47 miles line in La. connecting its system to the Tennessee Gas Pipeline Co. line.
ANR PIPELINE Co. 11.4 miles, 24 in. line, from Richmond, Mich. to Sarnia, Ont. proposed. Completion: November 1994.
CHEVRON PIPE LINE Co. 12 miles, 12 in. line from offshore Block M0861 to Chandeleur Pipeline System near Mississippi. Planned. Completion: Mid-1995,
20 miles, 16 in. line from Chandeleur Pipeline System at Pacagoula, Miss. refinery to pipeline interconnect. Planned. Completion: Mid-1995.
CNG TRANSMISSION Corp. 15.1 miles, 24 in. line from Potter County, Pa. to Steuben County, N.Y. FERC approved. Completion: 1994.
3.7 miles, 30 in. line in Albany, N.Y. Before FERC. Completion: 1994.
8.8 miles, 30 in. line in Armstrong County, Pa. Before FERC, Completion: October 1994.
COLORADO INTERSTATE GAS Co. 23 miles, 4-10 in, line in Converse County, Wyo.
CONSUMERS POWER CO. 1.5 miles, 8 in. line planned from Northville Lyon 29 well site to Lyon 34 well site. Completion: 1994.
12 miles, 36 in. line planned from Hackman Rd. valve site to Babcock Rd. valve site. Completion: 1994.
1.8 miles, 10 in. lined planned from N211 well to Northville comp. station. Completion: 1994.
CONOCO Inc. 21 miles, 10 in. Grand Isle project.
EL PASO NATURAL GAS. 89 miles, 30 in. line from Quartzsite, Ariz. to Yuma, Ariz. Completion: 1994.
ENDEVCO Inc. 44 miles, 24 in. line from Delhi, La., to Vicksburg, Miss. planned.
19 miles, 8-12 in. line in Smith and Simpson Counties, Miss.
ENRON GAS GATHERING. (joint venture with Dauphin Island Gathering Co.) 70 miles, offshore gas gathering system in Mobile Bay, Ala.
FLORIDA GAS TRANSMISSION. 10.6 miles, 16 in. line from Hillsborough County, Fla. to Polk County, Fla. under construction. Contr: Latex. Completion: December 1994.
164.6 miles, 30 in. line from Suwanee County, Fla., to Hillsborough County, Fla. under construction. Contr: H.C. Price. Completion: December 1994.
16.7 miles, 22 in. line from Polk County, Fla., to Hillsborough County, Fla. under construction. Contr: Latex. Completion: December 1994,
*2.5 miles, 6 in. line in Polk county, Fla. under construction. Completion: December 1994.
*.9 miles, 10 in. line in Volusia county, Fla. under construction. Completion: December 1994.
415.9 miles, 36 in. line from Washington Parish, La. to Suwanee County, Fla. under construction. Contr: H.C. Price/Murphy Brothers. Completion: December 1994.
114.9 miles, 30 in. line from Orange County, Fla. to Palm Beach County, Fla. under construction. Contr: Latex. Completion: December 1994.
39.4 miles, 26 in. line from Calcasieu Parish, La. to St. Landry Parish, La. under construction. Contr: H.C. Price. Completion: December 1994.
30.1 miles, 30 in. line from Tangipahoa Parish, La. to Washington Parish, La. under construction. Contr: H.C. Price. Completion: December 1994.
1.8 miles, 8 in. line in Polk County, Fla. under construction. Completion: December 1994.
*3.4 miles, 8 in. line from Pinellas county, Fla. to Hillsborough county, Fla. planned. Completion: December 1994.
2.9 miles, 12 in. line in Brevard County, Fla. planned. Completion: December 1994.
LIBERTY PIPELINE Co. 30 miles, 30 in. line offshore and 8 miles, 30 in. onshore gas line from a receipt point near South Amboy, N.J. to delivery point near Long Island. Before FERC. Completion: November 1995.
10.5 miles, 36 in. line in Lycoming/Clinton County, Pa. Before FERC. $23.1 MM. Completion: 1995.
6.7 miles, 36 in. line in Lycoming County, Pa. Before FERC. $15.6 MM. Completion: 1995.
1.1 miles, 26 in. line in South Amboy, N.J. Before FERC. $0.6 MM. Completion: 1995.
LEVIATHAN GAS PIPELINE PARTNERS LP. 1.7 miles, 10 in. offshore lateral line from South Marsh Island Blocks 192 and 193. Completion: Fall 1994.
MACKENZIE PORCUPINE PIPELINE Co. 750 miles natural gas pipeline planned from McKenzie Delta area in Canada to Kenai, Alas. Completion: Late 1997.
MAGNOLIA PIPELINE Co. (Basin Pipeline Corp. and a unit of Transco Energy Co.) 55 miles intrastate line, 40 miles of laterals from Alabama's Black Warrior basin to Transco's interstate line in Central Ala. $55 Million.
MISSOURI PIPELINE Co. 18 miles, 4 in. lateral line in Owensville, Mo. Completion: 1994-1995.
25 miles, 6 in. lateral line in Salem, Mo. Completion: 1994-1995.
8 miles, 4 in. lateral line in Waynesville, Mo. Completion: 1994.
MONTANA POWER. *70,600 miles, 8 in. line in Lewis & Clark counties, Mont. Contr: Gregory & Cook, Inc. Completion: November 1994.
MOJAVE PIPELINE Co. 300 miles gas pipeline expansion from Topock, Ariz. to Sacramento and the East Bay area of Calif. Contr: Wolder Engr. & Const. $500 MM.
600 miles, 4-30 in. line from Bakersfield, Calif. to Sacramento & East Bay area. Before FERC. Completion: May 1995.
NOARK PIPELINE SYSTEM. 258 miles gas line across Arkansas under construction. $73MM.
NORTHWEST PIPELINE Corp. 39 miles, 30 in., 6 miles, 20 in., and 15 miles, 24 in. line expansion project in Wash. and Ore. Contr: Gregory & Cook.
ONYX GATHERING Co. 13 miles, 8-12 in. natural gas lines to connect three electrical power plants.
PACIFIC GAS TRANSMISSION. *18 miles, 12 in. line from near Stanfield, Ore. to Boardman, Ore., and 86 miles, 12 in. lines from Bonanza to Klamath Falls, Ore. and from Bonanza to Medford, Ore. planned. Before FERC. Completion: November 1995.
PENINSULA PIPELINE Co. 200 miles, 20-24 in. line from northern Florida to central Florida. $230-320 MM. Completion: 1994.
PHILLIPS PETROLEUM Co. 285 miles, 4-6-8-1 0 in. San Juan Coal Seam Gas Gathering System in Farmington, N.M. Contr: Foutz & Bursom/Flint/Fourway.
PUBLIC SERVICE CO. OF COLORADO NATURAL GAS GROUP. 7 miles, 12 in. line from Longmont, Colo. to Meade, Colo. Completion: November 1994.
QUESTAR PIPELINE Co. *34 miles, 12 in. gas gathering line in southwest Wyoming under construction. Completion: November 1994.
*26 miles, 14 in. gas transmission replacement line in northwest Colorado. Planning stage. Completion: Summer 1995,
SAN DIEGO GAS & ELECTRIC. *2.7 miles, 36 in. line from La Mesa, Calif. to the city border of San Diego under construction. Contr: Hood Corp. Completion: December 1994.
*3 miles, 36 in., .6 miles, 16 in., and .4 miles, 12 in. lines from San Diego to the Sweetwater Reservoir under construction. Contr: Hood Corp. Completion: December 1994.
SEAGULL ENERGY Corp. 73 miles, four pipelines from Deer Park, Tex., to Mont Belvieu, Tex.
SHELL PIPELINE Co. 7.3 miles, 123/4 in. line in the Gulf of Mexico from Bullwinkle platform to Boxer platform.
SUNSHINE INTERSTATE TRANSMISSION Co. 145 miles of gas line near Pascagoula, Miss. to delivery points in Escambia and Okaloosa Counties, Fla. FERC preliminary approval.
SUNCOAST PIPELINE Co. (joint venture of United Gas Pipe Line Co., ANR Pipeline Co., and Florida Power Corp.) 856 miles, 30 in. gas line from Walnut Hill, Fla. to Tampa area to Fort Lauderdale. $1,000 MM. Completion: Winter 1994-1995.
TENNESSEE GAS PIPELINE Co. 15.6 mile lateral line to a proposed meter station before supplying the Conesville, Ohio power station. Completion: January 1995.
*1.1 miles, 36 in. line in Albany county, N.Y. under construction. Selkirk project. Contr: Willbros Energy Services Co. Completion: October 1994.
TEXAS EASTERN TRANSMISSION Corp.*9.3 miles, 36 in. gas line from Delmont, Pa. to Lambertville, Nev. under construction. Completion: November 1994.
*38.5 miles, 36 in., and 1 mile, 42 in. gas line from Lebanon, Ohio to Linden, N.J. under construction. Completion: November 1994.
*1 7.4 miles, 36 in., and 5.3 miles, 8 in. gas line from Lebanon, Ohio to Linden, N.J. before FERC. Completion: November 1,995.
*11.3 miles, 36 in. gas line from Holbrook, Pa. to Lambertville, N.J. before FERC. Completion: November 1995.
*14 miles, 36 in. gas line from Connellsville, Pa. to Chambersburg, Pa. before FERC. Completion: November 1995.
*3.5 miles, 30 in., 11.2 miles, 36 in., and .8 miles, 42 in. gas lines from Lebanon, Ohio to Linden, N.J. before FERC. Completion: November 1996.
*13.8 miles, 36 in. gas line from Lebanon, Ohio to Lambertville, N.J. in planning stage. Completion: November 1996.
TRANSCANADA PIPE LINES Ltd. (joint venture with Coastal Corp.) 200 miles natural gas line from the Iroquois system at Canajoharie, N.Y. through the southern corner of Vermont to near Boston. Planned. $320 MM.
200 miles to extend southeast from the end of the Pacific Gas Transmission Co. system in Oregon through California and Nevada. $130 MM. Completion: 1995.
TRANSCONTINENTAL GAS PIPELINE 1.4 miles, 42 in., 1.3 miles, 30 in. and 2.8 miles, 36 in. replacement between MLV 110-30 and MLV 110-40 in Coweta County, Ga. Completion: November 1994.
2-1.9 miles, 30 in., 1.9 miles, 36 in. replacement between MLV 175-10 and 17520 in Flurenne County, Va. Completion: December 1994.
23.7 miles, 36 in. Smart Pig from Delaware River to Station 505 in Mercer and Sommerset Counties, N.J. Completion: November 1994.
9.6 miles, 30 in. replacement between Station 120 and 130. Before FERC. Completion: October 1994.
*1.2 miles, 36 in., and 9.4 miles, 30 in. gas lines from Stockbridge, Ga. to Comer, Ga. under construction. Contr: Willbros Energy Services Co. Completion: November 1994.
*1.4 miles, 30 in., 2.8 miles, 36 in., and 1.4 miles, 42 in. gas lines near Newnan, Ga. under construction. DOT replacement. Contr: Willbros Energy Services Co. Completion: October 1994.
TRANSTEX GATHERING SYSTEM 40 miles, 12 in. from High island block A69 to block Al 09.
TUSCARORA GAS TRANSMISSION Co. 229 miles, 20 in. line from Malin, Ore. across northeastern Calif. to Reno, Nev. Completion: Fall 1995.
WILLIAMS NATURAL GAS Co. 30 miles, 6 in. line from Harper, Kan. to Wichita, Kan. Under review.
ABU DHABI
ABU DHABI NATIONAL OIL CO. 153 miles, 10-30 in. line at Habshan. Completion: December 1995.
80 miles, 42 in. Bab-Magta-Taweelah Gas Pipeline under construction. Completion: December 1994.
ALGERIA
SONATRACH. 90 miles, 8-14 in. gas line from Rhourde Chouff and Rhourde Hamra gas field development in progress. Contr: Snamprogetti. Completion: 1994.
330 miles, 48 in. gas line of the Maghreb-Europe project from Hassi R'Mel to border town of Berguent, Morocco. Phase II-IV will cross northern Morocco, under the Strait of Gibraltar to Cordoba, Spain. (Total 865 miles) Algerian portion: Engr/CS: Bechtel. Completion: 1996.
67 miles, 8-12-24 in. products line under construction. Hamra Natural Gas Process plant. Contr: Snamprogetti. Completion: 1994.
268 miles, LPG line from Alrar-Rhourde-Houss to Hassi R'Mel. (phase I of a 614 miles of line). Completion: 1996.
ANGOLA
SONANGOL. 21 miles, 30 in. crude line from Takula to Malongo terminal.
11.9 miles, 18 in. crude line from Limba to Malongo terminal.
18.1 miles 16 in. gas line from Takula to Malongo North.
11.6 miles, 18 in. crude line from Malongo West to Malongo terminal.
18.1 miles, 18 in. crude line from Kambala to Limba.
18.1 miles, 18 in. gas line from Kambala to Limba.
41.9 miles, 24 in. crude line from Kokongo to Malongo terminal.
12.5 miles, 36 in. crude line from Malongo terminal to Export Berth.
15.6 miles, 16 in. crude line from Pambi to Palanca.
12.5 miles, 36 in. crude line from Impala to Palanca.
9.1 miles, 12 in. crude line from Pacassa to Palanca.
46.9 miles, 16 in. crude line from Lombo East to Essungo.
19.4 miles, 1 0 in. crude line from Bagre to Quinfuquena terminal.
ARGENTINA
YFP. (joint venture with Chile's ENAP) 750 miles, $200 MM Trans-Andean oil pipeline project from Neuquen fields in Argentina to Santiago, Chile. Completion: End 1994.
AUSTRALIA
GAS & FUEL CORP. OF VICTORIA. 2-4 miles, 6 in., 31 miles, 6 in. natural gas line from Paarate to Colac. Approved. Completion: May 1995.
35 miles, 6 in. natural gas line from Orford to Hamilton under construction. Completion: May 1995.
ICI AUSTRALIA. 862 miles, ethane gas line from Moomba to Botany. $300 MM.
BANGLADESH
GAS TRANSMISSION Co. Ltd. *40 miles, 36 in. gas line from Asuuganj to Bakhrabad in the design stage. Contr: John Brown Engr. & Const. Completion: 1995.
BELGIUM
DISTRIGAZ. *14 miles, 16 in. transmission gas line from Ruien to Mouscron. Completion: 1995.
BOLIVIA
YACIMIENTOS PETROLIFEROS FISCALES BOLIVIANOS. *1119 miles, 28 in. gas line from Santa Cruz to San Pablo in engr. stage. Completion: 1997.
*13.3 miles, 6 in. gas line from Tarabuco to Yamparaez under construction. Contr: Bolser Ltd. Completion: October 1994.
*71 miles, 16 in. and 47 miles, 12 in. gas lines from Carrasco to Colpa under construction. Contr: Consorcio Mendes Juniors/Serco/Servipetrol. Completion: October 1994.
BRAZIL
PETROLEOS BRASILEIRO SA. 581 miles, cruder and products line under construction from Madre de Deus (Bahia) to Jequie and Itabuna (Bahia). Completion: 1996.
4,596 natural gas line from Santa Cruz, Bolivia to Sao Paulo, Brazil dividing into trunk line near Campinas south to Porto Alegre and spur to existing Rio de Janeiro-Sao Paulo line planned. Completion: 1997,
406 miles crude and products line from Repar (Parana) to Itajai and Florianopolis (Santa Catarina) under construction. Completion: 1995.
444 miles gas line from Urucu (Solimoes River, Amazonas) to Coari, Amazonas planned. Completion: 1997.
1,538 miles crude and product line from Replan (Campinas, Sao Paulo) to Brasilia under construction. Completion: 1997.
CANADA
BOW RIVER PIPELINE Ltd. 51 miles heavy oil pipeline to connect with delivery point near Coutts, Alta.
EXPRESS PIPELINE Ltd. 775 miles, 24 in. crude line from Hardisty, Alta. to U.S. border near Wild Horse, Alta. to a hub in Casper, Wyo. Total Canadian miles - 267. Before NEB. Completion: January 1995.
FOOTHILLS PIPELINES (YUKON) Ltd. 1,429 miles of gas line from the Arctic Coast near Inuvik, North West Territory to Caroline in Central Alberta to connect with existing North American pipeline systems. $4,4 billion. Before NEB. Completion: 1996.
INTERCOASTAL. 11 miles, 24 in., and 14 miles, 20 in. gas line connecting with ANR's system at St. Clair River to IPL's system at Milton, Ont. Approval pending. Completion: November 1994.
INTERPROVINCAL PIPE LINE Inc. 305 miles, 20 in. crude line from Hardisty, Alta. to Regina, Sask. Completion: Fall 1994.
NOVA CORPORATION OF ALBERTA. 227 miles, 4-12 in. gas line proposed for various locations throughout Alberta. Completion: April 1995.
378 miles, 16-48 in. gas line proposed for various locations throughout Alberta. Completion: April 1995.
PACIFIC COAST ENERGY Corp. (joint venture of Westcoast Energy and Chieftain Development) 118 miles, 103/4 in. Mainland portion of the Vancouver Island pipeline project. Contr: Majestic Contr. Ltd.
PETROLEUM RESOURCES Ltd. 21 miles, sour gas pipeline near Calgary. $14 MM. Approval received.
POLAR GAS Ltd. 1,450 miles, 36 in. from Canadian Mackenzie Delta Pipeline Project to Caroline, Alberta planned. Contr: Transcanada Pipelines Ltd./Tenneco Inc./Panarctic Oils Ltd. Completion: 2000-2005.
POUCE COUPE PIPE LINE Ltd. 16 miles of crude line connecting facilities built by Norcen Energy and Canadian Hunter in Northeast B.C. with Peace Pipe system in Northwest Alta.
TRANSCANADA PIPELINES. 19.9 miles, 42 in. natural gas transmission loops near Mattawa, Ont. and Arnprior, Ont. under construction. Contr: Premier-Murphy. Completion: November 1994.
65.2 miles, 48 in. natural gas transmission loops between Liebenthal and Cabri, and west of Grenfell, Sask. Approved. Contr: Marine Pipeline Construction. Completion: December 1994.
11.7 miles, 42 in. natural gas transmission loops near Beardmore, Kirkland Lake, Ont. under construction. Contr: Banister Majestic Inc. Completion: 1994.
*17 miles on the main line gas system in Ontario and Quebec planned. Completion: November 1995.
UNION GAS Ltd. 11.7 miles, 48 in. natural gas transmission line in southwestern Ont. from the Enniskillen valve site to the Brooke valve site. Completion: October 1994.
WESTCOAST ENERGY. *11.3 miles, 36 in. gas line at Ft. Nelson Mainline looping at two northern locations under construction. Contr: Wachuk Pipeline Contractor. Completion: November 1994.
*16.6 miles and 9.3 miles, 24 in. gas lines at Grizzly/Sukunka looping in Central B.C. under construction. Contr: SPIE Pipeline Construction. Completion: November 1994,
*21.16 miles, 16 in. gas line at Wolf Pipeline in Northeastern B.C. under construction. Contr: Surerus. Completion: November 1994.
*1 7.2 miles, 12 in. gas line at Murray River Pipeline in Central B.C. under construction. Completion: November 1994.
CHINA
ARCO CHINA. 438 miles, 28 in. gas submarine line from Yacheng 13-1 production platform to Pearl River Mouth. Design: J.P. Kenny. Contr: Saipem. Completion: 1995.
44 miles, 28 in. gas submarine line from Pearl River Mouth to Black Point. Design: J.P. Kenny. Completion: 1995.
62 miles, 14 in. raw gas/gas condensate submarine line from Yacheng 13-1 production platform to Hainan Island. Design: J.P. Kenny. Completion: 1995.
CHINA NATIONAL OIL Corp. 40 miles, 12-20 in. crude and products line planned from Kwang-In to Tau-Yuan. Completion: June 1997.
190 miles, 8-24 in. gas line under construction from Yungan to Tunghsiao. Completion: June 1995.
2,187 miles crude line from Korla in Xinjiang Autonomous Region to Luoyang in Henan Province. $ 1.75 billion. Design stage. Completion: 1995.
1,332 miles products line through Guangdong, Sichuan, Hainan, Yunnan, and Guizhou provinces and Guangxi Zhuang autonomous region to Hainan Island. $724 MM. Completion: 1997.
CHINA, TAIWAN
CHINESE PETROLEUM Corp. 40 miles, 12-20 in. crude and product line planned in northern oil terminal.
COLOMBIA
ECOPETROL. 17 miles, 8 in. product line from Guacari to Yumbo.
PROMIGAS S.A. 373 miles, 20 in. and 2,459 miles, 24 in. gas line from Pajaro to Bogota under study.
7 miles, 4 in. gas line from main gas pipeline to Montelibano planned.
9.3 miles, 3 in. gas line from main gas pipeline to Corozal planned.
12.4 miles, 4 in. gas line from main gas pipeline to Arjona planned.
8.7 miles, 4 in. gas line from Barranquilla to Puerto Colombia planned.
5.4 miles, 3 in. gas line from main gas pipeline to Galapa planned.
COMMONWEALTH OF INDEPENDENT STATES
CASPIAN PIPELINE CONSORTIUM. 500 miles, 42 in. crude line from Komsolmosk to Novorossysk, Russia in preliminary engineering stage. CS Mgr: Willbros. Project Mgr: Bechtel. Completion: 1996.
GAZPROM. 50 miles, 48 in. gas line at Baydaratskaya Bay, Siberia crossing. Design stage. Engr: Zeetech/John Brown. CS: Heerema. Completion: 1996.
KAZAKHSTAN PIPELINE CO. 1,242 miles, 22 in. oil trunkline. Feasibility study completed. Engr: OTP. Completion: 1995.
CZECH REPUBLIC
MERO-IKL Ltd. (joint venture of Kaucuk Kralupy and Chemopetrol Litvinov) 211 miles, crude pipeline from Ingolstadt, Germany to Kralupy, Czec. Completion: 1995.
ECUADOR
*112 miles crude line from Villano to Baeza planned.
MAXUS ENERGY. 128 miles, 16 in. line from Lago Agrio through Shushutindi in southern part of Block 16. Completion: 111 Qtr. 1995.
91 miles, 4 in. product line for fueling Block 16. Completion: 1st Qtr. 1995.
EGYPT
EGYPTIAN GENERAL PETROLEUM Corp. 103 miles, 18 in. gas line from El Eaafrana to Kurimat under construction. Contr: Petrojet. Completion: December 1995.
50 miles, 22 in gas line from Kurimat to Tibeen under construction. Contr: Petrojet. Completion: June 1996.
FINLAND
NESTE OY. 26 mile extension of Nesty Oy's southern Finland gas line into greater Helsinki. Contr: E. M. Pekkinen Oy. Welding and fitting: Zarubezhjneftegasstroi (C.I.S). $10 MM.
FRANCE
GAZ DU SUD OUEST. 110 miles, 32 in. gas line from Toulouse to Narbonne-Argeliers under study. Completion: End 1996.
30 miles, 12 in. gas line from Toulouse-Seilh to St. Sulpice delayed. Completion: End 1995.
2 miles, 8 in. gas line from Begles to Bouliac. Awaiting approval. Completion: November 1994.
14 miles, 8 in. line from Mirepoix to Dalou under study. Completion: End 1995.
SPIE CAPAG. 300 miles, 12 in. product line in the engr. stage. Contr: John Brown. Completion: 1994.
SPMR. 93 miles, 12 in. product line under construction from La Mede to Puget sur Agens. Contr: Devin Lemarchand Environment. Engr: OTP. Completion: End 1994.
GERMANY
ERDGAS. 30 miles, 24 in. gas line from Lehringen-Kolshorn-Egenstedt planned. Contr: Preussag/Bohlen and Doyeu. Completion: December 1994.
GASVERSORGUNG SUDDEUTSCH LAND GmbH. 16 miles, 20 in. gas line from Scharenstetten to Allmendingen planned. Engr: ILF Munchen. Completion: October 1995.
MANNHEIMER VERORGUNGSUND VERKEHRSGESELLSCHAFT. 4.5 miles, 6 in. gas line from Wienheim to Morlenbach planned and under construction. Completion: December 1994.
RUHRGAS AG. 7.7 miles, 12 in. gas line near Messenkamp. Contr: Pipeline Engineering GmbH. Completion: Summer 1995.
16 miles, 16 in. gas line from Laimerstadt to Denkendorf. Contr: Pipeline Engineering GmbH. Completion: End 1995.
11 miles, 28 in. and 87 miles, 36 in. gas line from Breitbrunn-Schnaitsee-Anwalting. (joint venture with Bayerngas GmbH). Completion: End 1995.
41 miles, 48 in. gas line from Achim to Wardenburg. (joint venture with BEB Erdol und Erdgas GmbH). Completion: End 1994.
10.6 miles, 30 in. gas line from Quarnstedt to Klein Offsenseth. (joint venture with BEB Erdol, Erdgas GmbH & Schleswag AG). Completion: End 1996.
112 miles, 42 in. gas line from Salzwedel to Bernau. (joint venture with Verbundnetz Gas AG). $336 MM. Completion: End 1994.
35 miles, 48 in. gas line from Etzel to Wardenburg planned. Contr: Pipeline Engineering GmbH. Completion: End 1995.
58 miles, 48 in. gas line from Wardenburg to Drohne planned. Contr: Pipeline Engineering GmbH. Completion: End 1995.
74 miles, 44 in. gas line from Drohne to Werne planned. Contr: Pipeline Engineering GmbH. Completion: End 1995.
GREECE
DEPA. 62 miles, 36 in. and 257 miles, 30 in. gas line from Koula to Athens under construction. Contr: Machinoimport/Biokat. Completion: End 1994.
GUATEMALA
BASIC PETROLEUM INTERNATIONAL Ltd. *74.6 miles crude line from Xan oil field to La Libertad planned. $13.5 MM. Contr: Lineas de Produccion SA de CV. Completion: Mid-1995.
HUNGARY
HUNGARIAN OIL AND GAS Co. Ltd. (MOL Ltd.) 43 miles, 30 in. gas line from Gyor to Austrian border in the design stage. Completion: August 1996.
33 miles, 28-32 in. gas line from Zsana to Varosfold under construction. Completion: September 1995.
INDIA
OIL INDIA Ltd. (Indian Oil Corp.) 68 miles, 10 in., 692 miles, 22 in. and 136 miles, 14 in. petroleum products line from Kandla, Gujarat, to Bhantinda, Punjab. Detailed engr. stage. $240 MM. Contr: Skodaexport[Penspen Ltd. Consultant: Bechtel. Completion: December 1994.
OIL AND NATURAL GAS COMMISSION. 20 miles, 18-22 in. Bombay High products transmission under construction. Engr: John Brown. CS: Samsung. Completion: 1996.
10 miles, 18 in. Ratna field product transmission under construction. Engr: John Brown. CS: Mazagov. Completion: 1994.
INDONESIA
ATLANTIC RICHFIELD INDONESIA Inc. 17 miles, 18 in. three phrase production line from AVSA field to Zulu Junction. Contr: P.T. McDermott Indonesia. Completion: December 1995.
1.5 miles, 16 in. three phase production line from ZUI platform to Zulu Junction. Contr: P.T. McDermott Indonesia. Completion: December 1996.
1.5 miles, 12 in. three phase production line. Contr: P.T. McDermott Indonesia. Completion: December 1996.
1.0 mile, 12 in. three phase production line. Contr: P.T. McDermott Indonesia. Completion: December 1995.
21 miles, 24 in. produced gas line from NGL B platform to the L Compression platform. Contr: P.T. McDermott Indonesia. Completion: December 1994.
1.2 miles, 8 in. produced gas line. Contr: P.T. McDermott Indonesia. Completion: 1995.
IRAN
IGAT 2. 880 miles, 48-56 in, from Kangan gas field on the Persian Gulf to the Soviet Union. Contr: Saipem (will lay 20% of remaining pipeline).
NATIONAL IRANIAN OIL Co. 1,139.6 miles, 12 in. product line from Arak to Melayer and Mamadan.
ITALY
SNAM SpA. 865 miles, 26-48 in. gas line from Mazara del Vallo, Italy to Minerbio (Bologna) Italy for Algeria-Italy Transmediterranean Gas Pipeline Expansion. Italian section. Contr: Snamprogetti. Completion: 1994.
TRANSMEDITERRANEAN PIPELINE Co. 100 miles, 26 in. gas line from Cap Bon, Tunisia to Mazara del Vallo, Italy for Algeria-Italy natural gas submarine pipeline expansion at Sicily Channel crossing under construction. Contr: Snamprogetti. Completion: 1994.
JAPAN
2,050 miles, plans for a trans-Asian gas pipeline network from Russia and Japan to Indonesia and Australia.
LIBYA
416 miles, gas line from Al Brika to Khoms.
MACEDONIA
62.5 miles gas line from Deve Baira on the Bulgarian border to Skopja. $60 MM. Contr: Makpetrol. Completion: 1995.
MEXICO
PEMEX. 37 miles, 24 in. gas line from Venta de Carpio to Cuemanco under construction.
76 miles, 16 in. gas line from Palmillas to Toluca in engr. stage.
149 miles, 16 in. product line from Salamanca to Tula under construction.
149 miles, 12 in. LPG line under construction from Minatitlan to Salina Cruz.
144 miles, 12 in. LPG line from Ramal Jaltipan to Salina Cruz under construction.
*75 miles, 10 in. product line from Veracruz to Jalapa in engr. stage.
*126 miles, 12 in. product line from Queretaro to San Luis Potosi in engr. stage.
*68 miles, 8 in. product line from Morelia to Uruapan in engr. stage.
*438 miles, 12 in. product line from Minatitlan to Merida in engr. stage.
MOROCCO
TRANSMAGREB. 330 miles, 48 in. gas line through Morocco to Tangier to a link across the Strait of Gilbralter to Spain. Under construction. Engr: OTP. Completion: 1995.
SOCIETE CHERIFIENNE DES PETROLES. 115 miles, 14 in. oil trunkline under study. Engr: OTP. Completion: 1995.
MOZAMBIQUE
EMPRESA NACIONAL DE HYDROCARBONETOS DE MOZAMBIQUE. 562.5 miles, gas line from Pande field to near Johannesburg planned.
THE NETHERLANDS
NV NEDERLANDSE GASUNIE. 9.6 miles 48 in. natural gas line from Angerlo to Haalderen in design stage. Completion: October 1994.
15.6 miles, 36 in. natural gas line from Oudesluis to Alkmaar under construction. Contr: Nacap Ned. B.V. Completion: October 1994.
12.4 miles, 18 in. natural gas line from Zegge to Moerdyk in design stage. Completion: October 1995.
*40 miles, 48 in. gas line from Norg to Oldeboorn under study. Completion: October 1998.
*27 miles, 48 in. gas line from Grijpskerk to Tusschenklappen in design stage. Completion: October 1996.
*9.6 miles, 48 in. gas line from Angerlo to Haalderen under construction. Contr: Hak Ned. B.V. Completion: October 1994.
NEW ZEALAND
NATURAL GAS CORPORATION OF NEW ZEALAND Ltd. *4.5 miles, 8 in. products line from Motunui to Waitura Valley under construction. Completion: December 1994.
*.8 miles, 6 in. gas line from Pironiyia to Te Awamutu proposed. Completion: April 1995.
NIGERIA
NIGERIAN NATIONAL PETROLEUM Corp. 34 miles, 12 in. products line from Port Harcourt to Abe.; 97.5 miles, 12 in. product line from Aba to Enugu; 105.6 miles, 12 in. product line from Enugu to Auchi; 66.9
miles, 12 in. product line from Auchi to Benin City under construction. Contr: SOFRSID. Engr: OTP. Completion: End 1994.
64 miles gas line to supply Aluminum Smelting Co. in Ikot Etetuk. Contr: Snamprogetti. Completion: 1994.
SHELL PETROLEUM DEVELOPMENT.
3.5 miles, 12 in. crude line from Okpokonou flowstation to southern Forcados Pipeline at Ogara Manifold planned. Completion: December 1995.
NORWAY
NORSK HYDRO. 18 miles, 16 in. gas export line from the Troll Olje production platform to Troll Phase I gravity base structure. Contr: Allseas Marine Contractors. Completion: August 1995.
STATOIL. (Phase IIA) 186 miles, 40 in. to connect the Troll processing plant at Kollsnes to Sleipner. Engr. stage. Contr: European Marine Contractors. Completion: November 1995.
(Phase IIB) 119 miles, 40 in. gas line from Kollsnes to Heimdal. Pre-engr. stage. Completion: October 1997.
(Phase III) 31 miles, 42 in. onshore gas line and 380 miles, 40 in. offshore gas line from Dornumersiel to Emden for Europipe Development Project under construction. Contr: European Marine Contractors. Completion: October 1995.
157.5 miles, 16 in. gas line from Heidrun to Tjeldbergodden in engr. stage. Completion: December 1996.
400 miles, 40 in. gas line for the Europipe Development Project from Norway to Germany under construction. Engr: Zeetech/John Brown. CS: EMC. Completion: 1994.
*53 miles, 16 in. crude line from Troll field to Mongstad terminal in pre-engineering stage. Contr: European Marine Contractors. Completion: January 1996.
OMAN
PETROLEUM DEVELOPMENT OMAN. 110 mile four pipeline gas system. Contr: Saipem/Consolidated Contr. Co.
PAKISTAN
CRESCENT PETROLEUM Co. Feasibility study of 994 miles natural gas line from Doha, Qatar to Karachi.
PARCO. (Pak Arab Refinery Co. Ltd.) 217 miles, 16 in. product line extension into Lahore via Faisalabad. Engineering completed. Technical bid analysis October 1994. Engr: OTP. Completion: 1996.
PERU
PETROPERU. 364 miles, 22-26 in. gas line and 364 miles, 10-12 in. NGL line planned from Camisea to Lima. Completion: 1998.
170 miles, 12 in. gas line and 170 miles, 6 in. NGL line planned from Camisea to Cusco. Completion: 1998.
52 miles, 6 in. gas line and 52 miles, 4 in. NGL line planned from Aguaytia to Pucallpa. Completion: End 1995.
POLAND
418 miles, gas pipeline system across Poland from Bovankovo and Kharasavei gas fields on Yamal Peninsula to Western Europe. (joint venture with Gazprom of Russia). Under construction.
SPAIN
C.L.H. (formerly listed as Campsa) 90 miles, 10 in. products line from La Coruna to Vigo under construction. Contr: Tecnicas Reunidas/Heymo. Completion: 1994.
55 miles, lb in. product line from Cartagena to Alicante under construction. Completion: 1994.
EMPRESA NACIONAL DE GAS SA. 66 miles, 4-14 in. gas line from Oviedo to Tuy in the engr. stage. Distribution lines for Ferrol, Coruna and Santiago de Compostela. Contr: INITEC.
112 miles, 20 in. gas line from Oviedo to Tuy in the engineering stage. Contr: INITEC.
40 miles, 26 in. gas line from Ferrol to Villalba (Lugo) in the engineering stage. Contr: INITEC.
ENAGAS. 256 miles, gas line from Valencia to Alicante. Contr: Technicas Reunidas/Heymo Ingenieria. Completion: 1994.
107 miles, 8-12 in. gas line from Cordoba to Jaen-Granada in engr. stage. Contr: Tecnicas Reunidas/Heymo Ingenieria. Completion: December 1995.
242 miles, 20 in. and 40 miles, 26 in. gas line in Galicia in engr. stage. Contr: Initec/Intecsa. Completion: July 1997.
180 miles, 48 in. gas line from Tarifa to Cordoba in engr. stage. Contr: Heymo Ingenieria/Mannesmann. (Maghreb Pipeline project) Completion: December 1995.
50 miles, 16 in. line in Campo Gibraltar in engr. stage. Contr: Heymo Ingenieria. Completion: December 1995.
REPSOL PETROLEO SA. 435 miles, 1022 in. crude line from Cartagena to Puertollano under construction. Contr: Snamprogetti. Completion: 1994.
SURINAME
STATE OIL Co. of SURINAME. 34.4 miles, 14 in. crude line form Catherine Sophia field to Tout Lui Faut terminal. Contr: Staatsolie.
SWITZERLAND
GASVERBUND OSTCHEWUIZ AG. 29 miles, 20 in. gas line from Ohringen (Winterthur) to Bischofszell. Completion: 1995.
2 miles, 10 in. gas line from Mettlen to Weinfelden. Completion: 1995.
TANZANIA
OCELOT TANZANIA Ltd. 125 miles natural gas line from Songo Songo Island to Dares-Salaam. (joint venture with TransCanada PipeLines Ltd. and government of Tanzania).
TAZAMA PIPELINES Ltd. 1,070 miles, 812 in. crude rehabilitation work in progress from D'Salaam, Tanzania to Ndola, Zambia. Completion: November 1994.
THAILAND
PETROLEUM AUTHORITY OF THAILAND. (PTT). 265 miles, 36 in. gas pipeline parallel to the existing Erawan-Rayong line, 68 miles, 28 in. onshore pipeline from Rayong to Bang Pakong near Bangkok. $700 MM. Engr/PE/CS: Bechtel Corp. Completion: March 1996.
680 miles, 34 in. and 106 miles, 28 in. natural gas parallel pipeline. Engr/PE/CS: Bechtel. Completion: March 1996.
TUNISIA
SOCIETE TUNISIENNE de L'ELECTRICITE. 82 miles, 20 in. and 66 miles, 24 in. gas line from M'Saken to Gabes projected. Completion: 1994.
SCOGAT. 228 miles, 48 in. gas line from Algerian border to Cap Bon, Tunisia under construction for Algeria-Italy Transmediterranean gas pipeline expansion - Tunisia section. Contr: Snamprogetti. Completion: 1994.
UNITED KINGDOM
BRITISH GAS. *15 miles, 20 in. and 10 in. gas and condensate line from the Amarda Platform to the Cats Platform in the design stage. Contr: John Brown Engr. & Const. Completion: 1996.
BP EXPLORATION. 36 in. pipeline to serve Forties field in the U.K. North Sea. Contractor: ETPM Services (U.K.) Ltd.
15 mile, 12 in. natural gas liquids pipeline linking Total Oil Marine plc's St. Fergus, Scotland, gas terminal to BP's Cruden Bay terminal.
CONOCO U.K. Ltd. 7 miles, 16 in. infield pipeline to move Caister gas to Murdock platform.
112 miles, 26 in. export platform from Murdock to Theddlethorpe.
VENEZUELA
CORPOVEN. 105 miles, 36 in crude line and a 20 in. product line planned.
VIET NAM
PETROVIETNAM. 80 miles, 16 in. gas line from White Tiger oil field to Be Ria, southeast of Ho Chi Minh City under design. Engr: John Brown. CS: Hyundai. Completion: End 1994.
ZIMBABWE
COMPANAI DO PIPELINE MOZAMBIQUE. 180 miles, 10 in, products line rehabilitation from Beira, Mozambique to Feruka, Zimbabwe under construction. Contr: John Brown. Completion: December 1994.