Report projects US, Canadian infrastructure outlays through 2035

The US and Canada will require an average $26 billion/year, or $546 billion from 2015 to 2035, to build new natural gas, crude oil, and natural gas liquids infrastructure, a study commissioned by the INGAA Foundation Inc. concluded.

In order to access this content, you must be logged-in and have an active subscription to the OGJ Premium Archive

Subscribe

More in Gas Processing