Unique approach developed for installing heated export lines at Brazilian terminal

Expected operating conditions for two planned oil export pipelines at Petrobras' Capixaba North Terminal caused modifications to conventional installation and burial procedures.
Aug. 6, 2004

Click on the pdf link below to view entire article.

Expected operating conditions for two planned oil export pipelines at Petrobras' Capixaba North Terminal caused modifications to conventional installation and burial procedures.

Sign up for our eNewsletters
Get the latest news and updates