*Designates projects listed for the first time in the Journal.
UNITED STATES
AMERADA HESS. Tiogaa, N.D. expansion of treating facility under construction.
ARCO ALASKA, Inc. Prudhoe Bay, Alas. 2.4 bscfd gas handling facilities reinjection expansion in the fabrication stage. $1.1 billion. PD/Engr/DD/PE: Parsons. Contr: Fluor Daniel. Completion: 4th Qtr. 1994.
CHEVRON. Pascagoula, Miss. *300 MMscfd treating plant. Engr/PE: Parson. CS: Brown & Root.
EXXON Co. Mobile Bay, Ala. 300 MMscfd sour gas treatment plant under construction. CS: Zachry. PD/Engr/DD/PE: United Engineers & Constructors. Completion: 1993.
Santa Barbara, Calif. 20 MMscfd gas processing plant with 230,000 g/d of NGL. Completion: May 1994.
MESA, Inc. Satanta, Kan. 190 MMscfd nitrogen rejection plant in fabrication phase. $43 MM. Engr: Process System Int/ABB Randall. Design/Procurement/Const: ABB Randall, Completion: June 1993.
PANHANDLE EASTERN Corp. Liberal, Kan. $25 million upgrade to extract 800 MMcf/year of crude helium and additional propane. (joint venture with Air Products & Chemicals Inc.).
GPM GAS Corp. Kenai. Alas. (formerly listed as Phillips Petroleum) Expansion of LNG plant under construction. $20 MM. Engr/Contr: Bechtel/Becon. Completion: 2nd Qtr. 1993.
S.E. Mexico. *29 MMscfd plant to process sweet gas.
YUKON PACIFIC. Anderson Bay, Alas. 2,000 MMscfd LNG plant in the engineering stage. Engr: Bechtel. Completion: 3rd Qtr. 1997.
WARREN PETROLEUM. Mont. Belvieu, Tex. *Upgrade deethanizer under construction. Engr/DD: John Brown. Completion: 1993.
ABU DHABI
ABU DHABI GAS INDUSTRIES. Jarn Yaphour. 1.6 MM ncum/d gas gathering and conditioning plant under construction. Design/Proc. Engr/Contr: Snamprogetii. Completion: 1993.
ABU DHABI MARINE. Umm Shalf field. 600 MMscfd gas plant expansion under construction Engr/CS/Contr: Bechtel. Completion: 4th Qtr. 1993.
ALGERIA
SONATRACH. Bethioua near Arzew. 1 billion cfd revamp LNG2 natural gas liquefaction complex in the engineering stage. Engr/Contr/Lic: Kellogg. Completion: 1994.
(Joint venture with Air Products and Chemicals and L'Air Liquide) recover, purify, and liquefy 600 MMcf/year of liquid helium and 100 t/d of nitrogen from tail-gases of LNG natural gas liquefaction facility. Completion: 1993.
Hamra. 15 MM scum/d gas gathering and conditioning plant under construction. Design/Proc. Engr/Contr: Snamprogeni. Completion: 199-4.
Hassi Messaoud Sud. 832,000 mt/y LPG plant planned.
Hassi Massaoud Nord. 485,000 mt/y LPG plant planned.
Rhourde Chouff. 7 MMcum/d gas gathering and conditioning. under construction. Engr/Design: Snamprogetti. Completion: 1994.
AUSTRALIA
SAGASCO. Beharra Springs. *20 MMscfd gas plant expansion. (Phase 11). $4MM. PD: Davy John Brown. Completion: 3rd Qtr. 1993.
WOODSIDE OFFSHORE PETROLEUM ptl. Withnell Bay, Burrup Peninsula (near Karratha). 2 MM mt/y LNG train No. 3 in design stage. 6 MM mt/y LNG total capacity. Engr/Contr: Kellogg/JGC. Completion: 1993.
BANGLADESH
BAKHRABAD GAS SYSTEMS Ltd. Feni gas field. 40 MMscfd solid desicant gas dehydration plant planned.
BOLIVIA
YPFB. Viboras. 1 MMcum/d gas treating plant under construction. Contr: McKee Del Plata SA. Completion: 1993.
BRAZIL
PETROBRAS. Rio Grande Do Norte. 38.8 MMcfd gas processing plant planned. 152,100 gpd LPG, 26,900 gpd C5- In-house. Completion: January 1995.
CANADA
DOW CHEMICAL. Fort Saskatchewan. NGL fractionation plant. $120 MM. 3rd Qtr. 1994.
SHELL CANADA. Caroline, Alta. 300 MMcfd expansion under construction. $950 MM. Engr/Contr: Delta Projects Inc./Petrotech Lavalin. Completion: 1993.
TOTAL PETROLEUM CANADA Ltd. Spirit River, Alta. Lo-cat hydrogen sulfide oxidation process unit. Contr: Colt Engineering.
WESTCOAST ENERGY INC. Chetwynd, B.C. *265 MMscfd expansion of sulfinol gas treating unit in engineering stage. $230 MM. PD/Engr/DD/PE: Delta Catalytic Engr. and Construction. Completion: 1994.
CHINA
Shenzhen City, Guangdong. $150 MM processing complex. Capacities will be 86,200 mt/y LPG, 70,000 mt/y polypropylene, 100,000 mt/y gasoline.
ARCO CHINA, Inc. 400 MMscfd offshore gas processing plant to process Yacheng 13-1 production for Hong Kong and Hainan Island. 60 MMscfd gas plant and condensate facilities onshore at Hainan Island. Design: Brown & Root. Completion: 1995.
CHINA NATIONAL TECHNICAL IMPORTS Corp. Puyang. 75 MMcfd NGL recovery plant in the engineering stage. Engr: CTIP.
COMMONWEALTH OF INDEPENDENT STATES
(FORMERLY U.S.S.R.)
GAS PROM. Novy Urenval. 250 MMcd gas processing plant in the engineering stage. DD/Proc/Engr/Contr: John Brown.
MACHINOIMPORT. Tenguiz II & III. Natural gas and oil treatment plant including 2 Claus plants under construction. Inlet separation, acid gas removal, and produced water treatment. Contr: Lurgi/Partec Lavalin/Litwin. Completion: 1992/1993.
SOVIET MINISTRY OF OIL REFINING AND PETROCHEMICAL INDUSTRY. Surgut and Tobolsk. Gas processing plants, $10 billion. Feasibility study: Combustion Engineering: McDermott International, Mitsubishi, Mitsui. Completion: Late 1990's.
DENMARK
DANISH OIL NATURAL GAS. Stanillie. dehydration unit and preheater unit with 127 MMscfd each in the engineering stage. Design/Engr/Contr: John Brown.
NORSK SHELL. Sola. Expansion of TIP Kero Merox.
EGYPT
EGYPTIAN GENERAL PETROLEUM Co. Amerlya. 250 MMscfd LPG plant in engineering stage. 194 mt/d PLG, 1,037 b/d gasoline and 19 MMscfd C2/C3 mix.
Transgulf. 65 MMscfd gas gathering system in engineering stage. Completion: 1994.
GERMANY
BEB ERDGAS u. ERDOL GmbH. Soltau, Sohlingen. 16.95 MMscfd LTS unit and cold fractionator unit in the engineering stage. Engr: OSD Dillinger Stahlbau.
Friedrichseck. 4-LTS units each at 35.32 MMscfd in the engineering stage. Engr: DSD Dillinger Stahlbau.
Mansiagt Plafforin. 35.32 MMscfd dehydration unit in the engineering stage. Design/Engr/Contr: DSD Dillinger Stahlbau.
DEA MINERALOL AG. Hemsbunde, Bodersen. 16.95 MMscfd LTS unit in the engineering stage. Design/Engr/Contr: DSD Dillinger Stahlbau.
HULS AG. Marl. 1.6 MMscf/hr hydrogen plant. $21 MM. Contr: Uhde.
STATOIL. Etzel. 2-dehydration units at 508 MMscfd each in the engineering stage. Design/Engr/Contr: DSD Dillinger Stahlbau.
WINTERSHALL KASSEL. Olbernhau. 2-dehydration units at 296 MMscfd each in the engineering stage. Design/Engr/Contr: DSD Dillinger Stahlbau.
INDIA
GAS AUTHORITY OF INDIA Ltd. Auralya, Uttar Pradesh. $1.38 billion separation plant planned.
Bijaipur, Madhya Pradesh. gas processing plant to recover 8,000 b/d LPG.
Guna, Madhya Pradesh. $490 MM gas processing plant planned.
IBP Co. Ltd. Gujarat, Assam. 122,410 mt/y of LPG and other products will be produced at three plants, Gandhar and Batoda, Both in Gujarat and Lakwa, Assam.
MADRAS REFINERIES Ltd. Thanjavur district. 10,000 b/d gas processing plant to handle crude and associated gas from Cauvery basin fields.
OIL & NATURAL GAS COMMISSION. Gandhar and Mehsana, Gujarat; Lakwa, Assam; offshore Krishna-Godavari basin; Agartala basin, Tripura. five gas processing plants. 500,000 mt/y LPG.
INDONESIA
ATLANTIC RICHFIELD BALI NORTH Inc. Jakarta. 250 MMscfd gas processing plant in the construction stage. Contr: P.T. Patrosea. Completion: August 1993.
ATLANTIC RICHFIELD INDONESIA Inc. Jakarta. 114 MMscfd offshore Bravo 2 compression & CO2 removal in the engineering/construction stage. Completion: End 1993.
210 MMscfd offshore ONWJ gas handling/dehydration facilities in engineering/construction stage. Contr: P.T. McDermott. Completion: August 1993.
EXXON PRODUCTION. Natuna Is. LNG plant in the engineering stage. Engr: Bechtel. Completion: 4th Qtr. 1995.
IRAQ
TECHCORPS. Mussayyib. 27,500 b/d C3. Contr: IFP. Completion: 1993.
KOREA
KOREA GAS Corp. Inchon, South Korea. 3 MM t/y LNG receiving terminal in the engineering stage. Lic: Kellogg. Engr: Kellogg/Hyundai. Contr: Hyundai. Completion: 1995-96.
KUWAIT
KUWAIT OIL Co. *expansion of 16 GOSPs under construction. CS/Contr: Bechtel. Completion: 4th Qtr. 1993.
LIBYA
AGIP Ltd. Bu Attifel. 11 MM std cu m/d NGL recovery and 3,500 b/d of condensate under construction. Engr/Design/Contr: Snamprogetti. Completion: 1993.
MALAYSIA
PETRONAS. Bintulu. 100 MMcfd gas processing plant. $750 MM. (joint venture with Royal Dutch/Shell). Planning. Yield 12,000 b/d.
MEXICO
FMC Corp. Santa Clara. 0.75 MMscfd hydrogen plant in the engineering stage. Contr: Howe-Baker. Completion: 1993.
NETHERLANDS
AMOCO NETHERLANDS PETROLEUM Co. Offshore. 500 MMcfd gas production facility. Completion: 1993.
NEW ZEALAND
SHELL BP AND TODD OIL SERVICES Ltd. Maui, Taranaki. C6 + expansion. Products: 43,804 g/d LP mix, 21,400 g/d condensate. Completion: January 1993.
NIGERIA
NIGERIA LNG Ltd Benny Island. 4 MM tons LNG. Completion: Early 1995.
River State. LNG plant planned. Lic: Technip/Snamprogetti. Engr: Kellogg.
NIGERIAN AGIP OIL Co. Ltd. Obiafu and Obrikom. 1,600 mt/d gas processing plant under construction. $40 MM. Contr: Randall. Completion: lt Qtr. 1993.
PAKISTAN
OIL & GAS DEVELOPMENT Corp. Lashari field. 30 MMscfd gas dehydration unit. TEG process.
Pirkoh field. 100 MMscfd gas dehydration unit. TEG process.
SUI SOUTHERN GAS CO. LTD. Sul fields. Balochistan. 2-120 MMscfd gas purification and dehydration plants planned. (MEA & TEG absorption). $62 MM. Completion: June 1994-1995.
District Hyderabad. Badin Gas fields. 275 mt/d LPG recovery plant. Cryogenic expansion planned. $33 MM. Completion: December 1994.
PAPUA NEW GUINEA
CHEVRON OIL. Kutubu field. gas/oil separator in the engineering stage. Engr: Bechtel. Completion: 1993.
PHILLIPS PETROLEUM. LNG plant in the engineering stage. Engr: Bechtel. Completion: 4th Qtr. 1995.
PERU
PETROLEOS DEL PERU. Aguaytla. 30 MMcfd gas, 700 b/d LPG, 600 b/d gasoline, and 800 b/d kero-diesel plant. Bidding. Completion: 1993.
Camisea-Cuzco. 1,200 MMcfd plant. 24,100 b/d LPG, 14,400 b/d gasoline, 10,100 b/d naphtha and 5,100 b/d kerosene plant. $1,300 MM. Completion: 1995.
QATAR
NATIONAL OIL DISTRIBUTION. Umm-Said. 10,000 b/d fractionation of heavy condensate (from North Gas field) in engineering stage.
SWEDEN
NYNAS ENERGY & CHEMICA'S COMPLEX. Nynasnamn. Texaco-gasification, gas treatment facilities in the engineering stage. Design: Uhde. Completion: 1993.
TUNISIA
BG TUNISIA. Hannibal. 350 MMscfd gas in the engineering stage. PD/Engr: Bechtel. Completion: 2 nd Qtr. 1995.
UNITED KINGDOM
AMOCO U.K. EXPLORATION Co. Offshore. 2,200 MMscfd gas dehydration platforms. Completion: 1993.
BREMER VULKAN/GOLOR NOR. 80 b/d process facilities in the engineering stage. $100 MM. Engr: Lummus. Completion: 1993.
BRITISH GAS. Barrow Cumbria. 500 MMcd gas processing plant in the engineering stage. $1,000 MM. DD/Proc Engr/Contr: John Brown. Completion: August 1993.
CONOCO. Theddlethorpe. 290 MMscfd gas processing plant under construction. $110 MM. DD/Proc Engr/Contr: John Brown. Completion: August 1993.
ENRON GAS PROCESSING (U.K.) Ltd. Seal Sands on Teesside. 400 MMcfd gas processing plant. 225 MM. Contr: Costain Engr.
HAMILTON OIL Co. Ltd. N. Wales. 250 MMscfd gas processing plant in the design stage. Design/Engr: Parsons Co.
MOBIL NORTH SEA Ltd. St. Fergus, Scotland. Phase 11 of a 1.15 bcfd gas processing plant under construction. PO/Engr/DD/PE/CS: Parsons. Completion: 41 Qtr. 1994.
VENEZUELA
CORPOVEN SA. Anzoategul. 400 MMcfd expansion for gas processing capacity.
Santa Barbara, Montaga. 400 MMcfd cryogenic gas separation plant. Contr: Technip.
VIET NAM
PETROVIETNAM. Vung Tao. (joint venture with Petroleum Authority of Thailand Mitsui & Co. - 70% owned) 10.5 bcf/year new gas processing plant. $140 MM.
YEMEN
YEMEN HUNT OIL CO. 400 MMcfd gas processing plant under construction.
400 MMcfd expansion of gas processing plant in the engineering stage.
300 MMcfd gas processing plant in the engineering stage.
Copyright 1993 Oil & Gas Journal. All Rights Reserved.