Statoil, ExxonMobil test Tanzania Block 2 resource
Statoil ASA and ExxonMobil Corp. completed their first drillstem test in the Tanzania Block 2 resource. Two separate, equipment-constrained intervals flowed at a maximum of 66 MMcfd, confirming good reservoir quality and connectivity, according to Statoil.