Petrobras tests Campos basin presalt well

Petrobras completed a drill stem test (DST) on 1-BRSA-1383A-RJS wildcat well (Alto de Cabo Frio Central Noroeste) in the southern portion of Campos basin presalt, 230 km from Rio de Janeiro.
July 12, 2022

Petrobras completed a drill stem test (DST) on 1-BRSA-1383A-RJS wildcat well (Alto de Cabo Frio Central Noroeste) in the southern portion of Campos basin presalt, 230 km from Rio de Janeiro. 

The well was drilled in 1,833 m of water in the Alto de Cabo Frio Central block. The test evaluated a thick interval of presalt carbonate reservoir rocks and confirmed good productivity. During the test, oil samples were collected and will be characterized by laboratory analyses. Petrobras will continue activities in the block to assess dimensions of the new accumulation.

Petrobras is operator of the block (50%) with partner BP Energy do Brasil Ltda. (50%).

About the Author

Alex Procyk

Upstream Editor

Alex Procyk is Upstream Editor at Oil & Gas Journal. He has also served as a principal technical professional at Halliburton and as a completion engineer at ConocoPhillips. He holds a BS in chemistry (1987) from Kent State University and a PhD in chemistry (1992) from Carnegie Mellon University. He is a member of the Society of Petroleum Engineers (SPE).

Sign up for our eNewsletters
Get the latest news and updates