PIPELINING-WORLDWIDE CONSTRUCTION

Oct. 15, 1990
*Designates projects listed for the first time in the Journal. ALL AMERICAN PIPELINE. 525 miles, 30 in. from McCamey to Webster, Tex. Contr: RB Potashnick (301 miles). Completion: 1990. AMOCO PIPELINE CO. 19 miles, 8 in. trunk line replacement in Oklahoma. 8 miles, 8 in. trunk line replacement in North Dakota. 5 miles, 4 in. and 5 miles, 8 in. gathering line replacement in Texas. 3 miles, 8 in., 10 miles, 12 in. and 1.5 miles, 26 in. trunk line replacements in Texas.

*Designates projects listed for the first time in the Journal.

U.S. CRUDE LINES

ALL AMERICAN PIPELINE. 525 miles, 30 in. from McCamey to Webster, Tex. Contr: RB Potashnick (301 miles). Completion: 1990.

AMOCO PIPELINE CO. 19 miles, 8 in. trunk line replacement in Oklahoma.

8 miles, 8 in. trunk line replacement in North Dakota.

5 miles, 4 in. and 5 miles, 8 in. gathering line replacement in Texas.

3 miles, 8 in., 10 miles, 12 in. and 1.5 miles, 26 in. trunk line replacements in Texas.

ARCO ALASKA INC. 6 miles, 60 in. loop of existing gas gathering for Prudhoe Bay field (EOA). Design: C.F. Braun Inc. Completion: 1990.

*CELREON CORP. 11 miles, 24 in. line from Gaviota, CA. to Las-Flores, CA. under construction.

PERMIAN OPERATING LTD. PARTNERSHIP. 13 miles, 6 in. from Dolphin field, Divide County, N.D., southeast to an Amoco pipeline in Burke County, N.D.

SOUTHERN CALIFORNIA PIPELINE SYSTEM. (Chevron Pipeline project manager, Four Corners Pipeline, Shell, Texaco).

Los Padres Pipeline: 124 miles, 30 in. from Gaviota, Santa Barbara County, Calif., to Emidio, Kern County, Calif. $350 MM. Proposed.

Angeles Pipeline: 130 miles, 30 in. from Emidio, Kern County, Calif., to Los Angeles basin refineries. $250 MM. Planned. Completion: mid 1992.

*SUN REFINING & MARKETING. 8.4 miles, 2-3 in. line from various lease connections Oklahoma gathering system. Contr: Mid-Continent Pipe Line Co.

WEST TEXAS PIPELINE. Conoco Pipe Line Co. will construct the 180 mile, 6 in. line from its Southlake terminal near Dallas to Abilene, Tex. Completion: Late 1990.

U.S. PRODUCT LINES

AMOCO PIPELINE CO. 2 miles, 18 in. trunk line replacement in Texas.

20.6 miles, 12 in. trunk line replacement in Missouri.

ARCO PIPE LINE CO. 52.5 miles petrochemical line from Channelview, TX. to Deer Park, TX. in the design phase. Completion: Dec. 1990.

*CENEX. 246 miles, 8 in. line from Minot, N.D. to Fargo, N.D. to connect with the Williams pipe line system. Completion: Spring 1992.

COLONIAL PIPELINE CO. 45 miles, 12 in. line from Bainbridge, Ga. to Lloyd, Fl. Completion: Spring 1991.

EXPLORER PIPELINE. 28 in. mainline expansion from Gulf Coast to Dallas-Fort Worth area under study.

U.S. GAS LINES

ARKLA ENERGY RESOURCES. 8.1 miles, 4 in. and up line in various locations within Kan., Okla., La., Ark., and Tex. (rehabilitate, lower or replace transmission & gathering lines). Completion: Dec. 1990.

AMERICAN PIPELINE. 38 miles, 16 in. in East Texas to connect Union Pacific Resources Carthage gas processing plant with pipelines to the West.

AMOCO PIPELINE CO. upgrading a 16 in. line from Drumright, Okla. to Okla-Texas line. Contr: Cimarron Pipeline Const. Inc. Completion: 1990.

ANR PIPELINE. 94 miles, 30 in. loop of existing lines. (southwest mainline expansion) Planned.

CHAMPLAIN PIPELINE CO. 253 mile line from Highgate, Vt., to Medway, Mass. $354 MM. Planned.

*CMS GAS TRANSMISSION CO. 25 miles, $6.5 million gas pipeline in Otsego, Crawford, and Kalkaska counties, Mich. Filed with Michigan Public Service Comm.

*CNG Transmission Corp. 47 miles, 20 in. line from Kanawha Co., WV. to Wyoming Co., WV. Completion: 1992.

*7 miles, 24 in. line from Prince William Co., WV. to Fauquier Co., VA.. 1991.

COASTAL CORP. (joint venture with Arkla Inc.) 1000 miles, 30 in. Wyoming-California Pipeline Co. gas system. planned.

COLORADO INTERSTATE GAS CO. 13.4 miles, 2-6 in. Systemwide gathering (Colo., Kan, Okla., Tex, Utah, Wyo.). Planned. Completion: Dec. 1990.

COLUMBIA GAS TRANSMISSION CORP. 5.1 miles of 24 in. in Lancaster county, Pa. Before FERC. Completion: Nov. 1991.

7.2 miles of 24 in. in Fayette and Greene counties, Pa. Planned. Completion: Nov. 1991.

*7.2 miles, 24 in. in Lancaster Co., Pa. Completion: Nov. 1991.

*14.2 miles, 24 in. in Albemarle, Louisa, Goochland & Chesterfield Cos., Va. Before FERC. Completion: Nov. 1991.

*5.8 miles, 36 in. in Hardy Co., WV. Before FERC. Completion: Aug. 1992.

*9.5 miles, 24 in. in Rockland Co., N.J., Completion: July 1991

COLUMBIA GULF TRANSMISSION CO. 20.3 miles, 16 in. line from West Cameron 485 to East Cameron 313. planning.

CNG TRANSMISSION CORP. 24 miles, 16 in. from Armstrong county to Clarion county, Pa. Completion: 1990.

19 miles, 18 in. from Doddridge county to Lewis county, W.Va. Completion: 1990.

12 miles, 20 in. Tompkins county, N.Y. Completion: 1990.

7 miles, 24 in. from Clay county to Calhoun county, W.Va. Completion: 1990.

25 miles, 30 in. from Butler county to Allegheny county, Pa. Completion: 1990.

DELTA PIPELINE CO. 190 miles, 24 in. from Wilburton in Latimer Co., Okla., eastward through Arkoma basin in Arkansas. $82 MM. Completion: June 1990. Before FERC.

EASTERN AMERICAN STATES TRANSMISSION. (Coastal Corp.). 285 miles, 30 in. from Ohio to Pennsylvania and 76 miles, 24 in. from New York to Long Island. Before FERC.

EL PASO NATURAL GAS. 14.8 miles, 30 in. loop line from Mohave Companion Project to transmission loop in Arizona. $10.8 MM. Before FERC. Completion: Mid 1992.

26 miles, 30-34 in. from coal steam project to transmission loops in New Mexico. $23 MM. Before FERC. Completion: Mid 1991.

12.96 miles, 30 in. from Wenden to Ehrenberg to transmission loops in Arizona. Before FERC. Completion: Mid 1991.

187.6 miles, 34 in. and 50.4 miles, 36 in. from OEC Mojave project to transmission loops in Co., N.M. and Ariz. Before FERC. Completion: Mid-1992.

EMPIRE STATE PIPELINE. (Coastal Corp., Houston, and Union Enterprises Ltd., Toronto). 155 miles, from Niagara Falls to Syracuse to connect with Union Gas Ltd.'s Canadian system. $82.5 MM. Proposed. Completion: late 1990 or early 1991.

ENDEVCO INC. 240 miles, 20-24 in. from Shreveport, La. to south central Mississippi. (joint venture with Bass family interests of Fort Worth) $95 million. Completion: Winter 1991-92.

*44 miles, 24 in line from Delhi, La. to Vicksburg, Miss. Planned.

*19 miles, 12-8 in line in Smith and Simpson counties, Miss.

ENRON CORP. 191.2 miles, 4-20 in. from Louisiana to South Florida. Pending FERC.

30 miles, 24 in. north of Janesville, Wis. to sw corner of Waukesha County. Pending Wisconsin PUC.

Filed with FERC for an expansion of it's eastern leg from Ogden, Iowa to near Janesville, Wis. Expected completion: 1990 92.

FLORIDA GAS TRANSMISSION. 23 miles, 8 in. from Salt Springs, Fl. to Ocala, Fl. FERC approved. Completion: Dec. 1990.

GATEWAY PIPELINE CO. (United Gas Pipe Line). 25 miles, 30 in. line to connect existing and planned gas treatment plants in Mobile County, Ala., to United's Lirette, La., to Mobile, Ala., line. Before FERC.

*INTERCON GAS INC. 77 miles, 6 in. line from near Festus, Mo. to Rolla, Mo. Completion: Late 1991.

IROQUOIS GAS TRANSMISSION SYSTEM. 250 miles, 30 in. from Iroquois, Ont., to Wright, N.Y., and 120 miles, 24 in. from Wright to South Commack, N.Y. (Long Island) $524.7 MM. Completion: 1990.

JUBILLE PIPELINE SYSTEM. 100 miles, 8-24 in. Various offshore blocks in Mobil area Bayou La Batre. Planned. Completion: 1991.

KERN RIVER GAS TRANSMISSION. (Williams Cos. and Tenneco). 762 miles, 36 in. from Kemmerer, Wyo. to Bakersfield, Calif. $800 MM. FERC final certificate issued.

MAGNOLIA PIPELINE CO. (Basin Pipeline Corp. and a unit of Transco Energy Co.) 55 miles intrastate line, 40 miles of laterals from Alabama's Black Warrior basin to Transco's interstate line in Central Alabama. $55 Million.

MARATHON OIL CO. 16 miles, 16 in line from Granite point in south central Alaska to Beluga, Alas. Contr: Seagull Gas Co.

MEXUS INTERSTATE PIPELINE INC. (Intercon Gas Inc.) 1,625 miles along the U.S.-Mexico border from Reynosa, Tamaulipas, to Tijuana, Baja Calif. 30 miles, 30 in. laterals to U.S. border.

MICHIGAN CONSOLIDATED GAS. 25.2 miles, 10 3/4 in. and 6.8 miles, 6 5/8 in. mainline extension from Forest township, Cheboygan County to Pulawski township, Presque Isle County, Mich.

*MID-CON CORP. 107 miles, 24 in from Latimer Co., OK. to Bryan Co., OK. Planned. Completion: January 1991.

MISSOURI PIPELINE CO. 22 miles of 12-16 in. line from Curryville, Mo. to St. Charles and West Alton, Mo. $15 MM.

Converting 70 miles of existing crude line to gas line in Pike, Lincoln, and St. Charles counties, Mo.

MOJAVE PIPELINE. (Enron Corp. and El Paso Natural Gas). 383 miles, from San Ardo, Calif. to Needles station near Topock, Ariz. (Lateral to Kern County, Calif.). $250 M.M. Proposed.

NORTHERN BORDER PIPELINE. 368 miles, 30 in. mainline extension from Ventura, Iowa, to Chrisman, Ill. Before FERC. $374 MM. Completion: Nov. 1991.

NORTHERN NATURAL GAS. 13 miles, 16 in. from Matagorda Block 686 to Matagorda Block 624. Planned. July 1990.

*88 miles, 20 in. from Roger Mills Co., Okla. to Roberts Co., Tex. Planned. 1991.

NORTHWEST PIPELINE CORP. 33 miles, 30 in. line from Ignacio gas processing plant at Durango, Colo. to Blanco. Completion: Dec. 1991.

PACIFIC GAS TRANSMISSION. 430 miles, 42 in. from Kingsgate, B.C., to Malin, Ore. $945 MM. Before FERC. Project manager: Bechtel. Completion: 1993.

294 miles, 42 in. and 120 miles, 36 in. from Malin, Ore. to Kern River Station, Calif. Before CPUC. Project manager: Bechtel. Completion: 1993.

*PHILLIPS PIPELINE CO. 324 miles, 10 in. from Midland, TX. to Sweeney, Tx. Design: Gulf Interstate. Completion: Late 1991.

SAGINAW BAY PIPELINE. (Michigan Consolidated Gas) 125 miles, 10-20 in. from Ogemaw County, Mich., to Tuscola County, Mich. $65 MM. Completion: 1990.

SEAGULL ENERGY CORP. 42 miles, 24 in. from Oyster Lake Station to Old Ocean, Tex. Pending.

73 miles, four pipelines from Deer Park, Tex. to Mont Belvieu, Tex.

SOUTHERN CALIFORNIA GAS CO. 24.4 miles, 36 in. planned from Blythe station to 24.4 miles westerly. Completion: Dec. 1990.

19 miles, 36 in. planned from Moreno station to Chino. Completion: Dec. 1990.

*SOUTHERN NATURAL GAS CO. 81.3 miles, 20 in. from Winn parish, LA to Concordia parish, LA. Planning. Completion: Oct. 1991.

*55.1 miles, 24 in. and 36 in. Mobil Bay Pipeline. (Mobil Co., AL) FERC filing. Completion: Dec. 1991.

TENNECO INC. AND CITRUS CORP. (joint venture) 53 miles, 36 in. line from Mobile Bay off Alabama north to an interconnection with Florida Gas Transmission Co. Before FERC.

TENNESSEE GAS PIPELINE. 48.7 miles, 30 in. line between the Niagara River at Lewiston, N.Y., and East Aurora, N.Y. Completion: Nov. 1990.

67.1 miles of loop and laterals on Tennessee's existing system. $100 MM. Completion: 1990.

TENNESSEE RIVER INTRASTATE CO. (with Champion International Corp.) 38 mile line to Courtland, Ala.

TEXAS EASTERN TRANSMISSION (joint venture with ANR Pipeline) 204 miles, 30 in. line from existing and proposed gas processing plants in Mobile County, Ala., northwest to Texas Eastern's main line in Kosciusko, Miss. $153.3 MM. Before FERC.

(Texas Eastern only) 55 mile, 24 in. offshore line from Mobile County, Ala. and future offshore production facilities in the Norphlet trend southwest to a proposed Viosca Knoll extension of the company's Main Pass pipeline system. $72.5 MM.

TEXAS GAS TRANSMISSION CORP. 15.3 miles, 20 in. line in Breckinridge co., Ky. Completion: 1990.

62.4 miles, 36 in. line from Daviess co., Ky. to Warren co., Oh. Completion: 1991.

69 miles, 30 in. from Bolivar co., Miss. to Lincoln co., Ark. Completion: 1991.

*26.4 miles, 36 in. line from Ohio Co., Ky. to Dearborn Co., In. Completion: 1992.

*21.1 miles, 24 in. line in Claiborne Parish, La. Completion: 1991.

*5.7 miles, 30 in. line from Hopkins Co., Ky. to Muhlenberg Co., Ky. Planned. Completion: 1991.

*5.4 miles, 20 in. line in Muhlenberg Co., Ky. Planned. Completion: 1991.

TRANSCONTINENTAL GAS PIPELINE CO. 23.94 miles, 36 in. loops in Monroe and Luzerne counties, Pa. Contr: Murphy Bros.

48 miles, 12-30 in. from Edison to Riverdale, N.J.. Contr: Napp Grecco Corp.

5 miles, 36 in. in Morris and Essex counties, N.J. Contr: Otis Eastern Services Inc.

VIRGINIA NATURAL GAS. 80 miles, 24 in. and 40 miles, 10 in. from Richmond, Va. to James City County, Va. Completion: 1991.

WYCAL-Wyoming-California Pipeline Co. (Coastal Corp.). 1,000 miles, 30 in. from Rocky Mountain Overthrust Belt, sw Wyoming to near Bakersfield, Calif. FERC final certificate issued. $665 MM. Completion: Late 1991.

YUKON PACIFIC CORP. 820 miles from Prudhoe Bay to Kenai Peninsula. Proposed.

ABU DHABI

ABU DHABI NATIONAL OIL. 93 miles, 28 in. Maqta-Al-Ain gas line. Completion: Dec. 1990.

AFRICA

KENYA PIPELINE CO. Extention of Kenya's main oil products pipeline from Nairobi to western parts of the country.

ALGERIA

300 mile gas line from Hassi R'Mel gas field in Algeria to the Moroccan border. Proposed. Completion: 1995.

AUSTRALIA

GAS & FUEL CORP. 5 miles, 6 in. natural gas line from Kyabram to Tongala planned. Completion: July 1991.

QUEENSLAND GOVERNMENT. 330 miles, 12.2 in. gas line to connect Surat basin and Denison Trough gas fields, southeast Queensland. Bids out. $100 MM.

AUSTRIA

OEMV AKTIENGESELLSCHAFT. 194 miles, 42 in. gas line in progress. Austrian section of U.S.S.R.-Italy Natural Gas Pipeline expansion. Contr: Snamprogetti. Completion: 1991.

BANGLADESH

BANGLADESH OIL, GAS, AND MINERALS CORP. 117 miles, 20 in. gas line from Kailashtila to Ashanganj. Design stage. Consulting: Pencol. Completion: 1991.

*TITAS GAS. 78 miles, 24 in. and 61 miles, 12 in. line from a gas field near Ashunganj to a fertilizer plant near Tarakandi. Contr: Spie Capag. Completion: June 1991.

BELGIUM

DISTRIGAZ. 22 miles, 24 in. gas line from De Lo to Ronquieres. Completion: Dec. 1990.

91 mile gas line of undetermined width from Zeebrugge to Blaregnies. Completion: 1992-1993.

BOLIVIA

YPFB. 346 miles gas line from Santa Cruz to the Brazilian border. Planned.

CANADA

POUCE COUPE PIPE LINE LTD. 16 miles of crude line connecting facilities built by Norcen Energy and Canadian Hunter in Northeast B.C. with Peace Pipe system in nw Alberta.

ALTAMONT PROJECT. (Amoco Canada Ltd., Canadian Occidental Petroleum Ltd., Esso Resources Canada Ltd., Home Oil Ltd., Mobil Oil Canada Ltd, Petro-Canada, and Shell Canada Ltd.) $1 billion gas line from Alberta to California. Proposed.

FOOTHILLS PIPELINES (YUKON) LTD. 1,429 miles of gas line from the Arctic Coast near Inuvik, N.W.T., to Caroline in Central Alberta to connect with existing North American pipeline systems. $4.4 billion. Before NEB. Completion: 1996.

NOVA CORP. OF ALBERTA. 18 miles of 24 in. and 10 miles of 20 in. laterals in the Grande Prairie/Beaver lodge area of Alberta.

870 miles, 4-42 in. gas line in Alberta. Completion: 1990.

PACIFIC COAST ENERGY CORP. (joint venture of West coast Energy and Chieftain Development) 330 miles, 10 in. line from British Columbia to Vancouver Island. $506 MM. Contr: Intec Engin. Inc. Completion: May 1991.

118 miles, 103/4 in. Mainland portion of the Vancouver Island pipeline project. Contr: Majestic Contr. Ltd.

*186 miles, 4-10 in. gas line from Victoria, B.C. to Campbell river, B.C.. Contr: Banister Pipeline. Completion: Sept. 1991.

PACIFIC GAS TRANSMISSION CO. 724 miles, 42 in. gas line from the British Columbia-Idaho border to San Francisco Bay area. Completion: 1993.

120 miles, 36 in. gas line from the San Francisco Bay area to Fresno county. Completion: 1993.

PETROLEUM RESOURCES LTD. 21 miles, sour gas pipeline near Calgary. $14 million. Approval received.

POLAR GAS LIMITED. 1,450 miles, 36 in. from Canadian Mackenzie Delta Pipeline Project to Caroline, Alta. Filed with NEB. Contr: Transcanada Pipelines Ltd., Tenneco Inc. and Panarctic Oils Ltd. Completion: Nov. 1996.

SABLE GAS SYSTEMS (TransCanada Pipelines, Nova Scotia Resources). 490 miles, 26 in. from Sable Island through Nova Scotia and New Brunswick to Maine border. Proposed.

TRANSCANADA PIPELINES LTD. 251 miles, 48 in. gas line, Saskatchewan and Manitoba looping. Before NEB. Completion: Nov. 1991.

479 miles, 42 in. gas line, Manitoba and Northern Ontario looping. Before NEB. Completion: March 1991 to Feb. 1992.

77 miles, 42 in. gas line from North bay to Ottawa looping. Before NEB. Completion: Oct. 1991.

8 miles, 36 in. gas line, Eastern Ontario looping. Before NEB. Completion: Oct. 1991.

61 miles, 48 in. gas line, Saskatchewan and Manitoba looping. Before NEB. Completion: Oct. 1992.

13 miles, 42 in. gas line, Northern Ontario looping. Before NEB. Completion: Oct. 1992.

37 miles, 42 in. gas line from North bay to Ottawa looping. Before NEB. Completion: Oct. 1992.

*9 miles, 36 in. gas line, Dawn extension looping. Completion: Oct. 1991.

*12 miles, 24 in. gas line, Blackhorse extension before NEB. Completion: Oct. 1991.

*16 miles, 16 in. gas line, Gananoque extension before NEB. Completion: 1991.

*12 miles, 20 in. gas line, Quebec looping. Completion: Oct. 1991.

*22 miles, 12 in. gas line, Napierville extension, Quebec. Completion: April 1991.

*TRANS MOUTAIN OIL PIPE LINE CORP. 144 miles, 36 in. crude line from low point, Wa. to anacortes & ferndale, Wa. Proposed. Completion: Late 1993.

*105 miles, 24 in. crude line from burlington, Wa. to low point, Wa. Proposed. Completion: Late 1993.

*UNION GAS.

*10.2 km, 48 in. line in south western ontario. Completion: 1990.

*6.3 km, 10 in. line in south western ontario. Completion: 1990.

*65.1 km, 48 in. line in south western ontario. Completion: 1991.

*7.3 km, 26 in. line in south western ontario. Completion: 1991.

*33.4 km, 16 in. line in south western ontario. Completion: 1991.

*8.5 km, 12 in. line in south western ontario. Completion: 1991.

*11.8 km, 12 in. line in south western ontario. Completion: 1991.

CHILE

SOCIEDAD NACIONAL de OLEODUCTOS LTD. 11 miles, 4 in. jet fuel line from Maip, Chile to Pudahuel, Chile. Under study.

CHINA

CHINA NATIONAL OIL CORP. 180 mile, 426 mm crude line from Zhongyuan oil field to Luoyang, Henan, refinery.

620 miles, 24 in. gas line from Yacheng field, Hainan Island to Guangdon Province, Guangzhou, south to Hong Kong. Feasibility study: Fluor Daniel PRC Ltd.

Qiong Zhou Strait crossing (Yacheng, Hainan, Hong Kong gas line). Joint study by: China National Offshore Oil Corp. and J.P. Kenny, London.

155 mile crude line from Shengli field to Huangdao, Shandong province. Eng-construction: Novacorp International.

230 mile gas line from Zhongyaun, Henan Province to Cangzhou, Hebei Province. Contr: Novacorp International.

CHINA, TAIWAN

CHINESE PETROLEUM CORP. GAS LINES: 170 miles, 26 in. gas line from Kang-shan valve station to Hsinchu governor station under construction. Contr: BES. Completion: Dec. 1990.

COLOMBIA

ECOPETROL. CRUDE LINES PLANNED: 290 miles, 24 in. from Vasconia to Covenas (Oleoducto Colombia). Completion: 1991.

37 miles, 10 in. from El Toldado to Gualanday. Completion: Dec. 1990.

9.5 miles, 20 in. from Galan to Vizcaina. Completion: Dec. 1990.

PRODUCTS LINES PLANNED:

18 miles, 6 in. from Medellin to Rionegro.

81 miles, 6 in. from Facatativa to Villavicencio.

20 miles, 12 in. from Sebastopol to Medellin.

47 miles, 6 in. from Neiva to Natagaima. Completion: June 1990.

8 miles, 8 in. from Tulua to Tulua. Completion: Dec. 1990.

11 miles, 12 in. from Girardota to Bello. Completion: June 1990.

82 miles, 14 in. from Pozos Colorados to Ayacucho. Completion: Dec. 1990.

17 miles, 8 in. from Guacari to Yumbo.

GAS LINE PLANNED:

58 miles, 20 in. from Dibulla to Ballenas.

PROMIGAS S.A. 373 miles, 20 in. and 2,459 miles, 24 in. gas line from Pajaro to Bogota under study.

7 miles, 4 in. gas line from Main Gas Pipe Line to Montelibano planned.

9.3 miles, 3 in, gas line from Main Gas Pipe Line to Corozal planned.

12.4 miles, 4 in. gas line from Main Gas Pipe Line to Arjona planned.

8.7 miles, 4 in. gas line from Barranquilla to Puerto Colombia planned.

5.4 miles, 3 in. gas line from Main Gas Pipe Line to Galapa planned.

CUBA

116 mile crude line linking the terminal at Matanzas on the northern coast east of Havana with a refinery at Cienfuegos on the southern coast (with Soviet assistance.)

DENMARK

DANSK OLIE OG NATURGAS. 7 miles, 12 in. gas line from Lynge to Hillerod. Under study. Completion: 1991.

14 miles, 12 in. gas line from Skjddelev to Aihus. Under study.

5 miles, 12 in. gas line from Kalvebod to HCV power plant. Under study.

5 miles, 10 in. gas line to power plant in Aalborg. Under study.

ECUADOR

PETROLEOS DEL ECUADOR. 165 km., 6-8 in. gas line from La Libertad refinery to Manta, Ecuador. Contr: Techint.

FINLAND

NESTE OY. 26 mile extension of Nesty Oy's southern Finland gas line into greater Helsinki. Contr: E. M. Pekkinen Oy. Welding and fitting: Zarubezhjneftegasstroi (U.S.S.R.). $10 mm.

FRANCE

ATOCHEM. 19 miles, 4 in. product line in Gonfreville, France under construction. Completion: End 1990.

GAZ DE FRANCE. (joint venture with Gas du Sudouest and Enagas) 44 miles, 24 in. gas line from Serrablo, Spain to Lacq, France, Completion: 1991.

STE. DU PIPELINE MEDITERANEE-RHONE. 94 miles, 12 3/4 in. products line from La Mede (Bouches-du-Rhone) to Puget sur Ar gens (Var). Eng. study: OTP.

GERMANY, WEST

MIDAS GmbH. (joint venture of Wintershall AG and OMV AG) 348 miles, 32 in. gas line from Rysum (near Emden) to Ludwigshafen. Completion: 1993.

*GASVERSORGUNG SUDDEUTSCHLAND GmbH. 19 miles, 16 in. gas line from Pfullendorf to Nenzingen planned. Completion: Oct. 1993.

*GOVT. OF THE FED. REP. OF GERMANY. 44 miles, 10 in. product line from lechfeld to leipheim under construction. Completion: End 1990.

*RUHRGAS AG. 153 miles, 48 in. gas line from Werne to Schluchtern planned. Contr: Pipeline Engineering GmbH. Completion: 1994.

*40 miles, 40 in. gas line from Lauterbach to Vitzeroda planned. Contr: Pipeline Engineering GmbH. Completion: End 1992.

*106 miles, 32-40 in. gas line from Vitzeroda to Gera planned. Contr: Arge PKM/PLE. Completion: End 1992.

HUNGARY

HUNGARIAN OIL AND GAS TRUST. 22 miles, 31 in. gas line from Pilisvrsvar to Dorog planned. Contr: Olajterv, Kolajvezetek pit Vllalat. Completion: 1990.

29 miles, 6 in. product line from Komarom to Gyor under construction. Contr: Olajterv, Koolajvezetek Epito Vallalat. Completion: 1990.

INDIA

$600 MM crude and gas lines from Bombay High field to Hazira. Proposed.

OIL & NATURAL GAS COMMISSION. 15 miles, 24 in. products line for Hazira export terminal, under construction. Contr: Land & Marine (Inida) Ltd. Completion: May 1991.

OIL INDIA LTD. (Indian Oil Corp.) 826 mile petroleum products line from Kandla, Gujarat, to Bhantinda, Punjab. $240 MM. Completion: 1992.

IRAN

IGAT 2. 880 miles, 48-56 in. from Kangan gas field on the Persian Gulf to the Soviet Union. Contr: Saipem (will lay 20% of remaining pipeline).

NATIONAL IRANIAN OIL CO. 63 miles, 42 in. crude line from Gurreh to Taheri (Moharram project). Contr: Snamprogetti. Completion: 1991.

IRAQ

SCOP-STATE ORGANIZATION FOR OIL PROJECTS. 595 miles, 56 48 in. crude line from Iraq to Saudi Arabia (IPSA II project). Contr: Snamprogetti. Completion: 1990.

ITALY

ENEL. 10 miles, 16 in. products line from Brindisi Nord to Brindisi Sud in the engineering stage. Completion: Dec. 1990.

*ENICHEM ANIC SPA. 140 miles, 8-10 in. products line from Montedison Petro. complex (Ferrara) to Enichem Petro. complex (Ravenna) in progress. Contr: Snamprogetti. Completion: 1991.

SNAM SPA. 144 miles, 42 in. gas line from Malborghetto to Camisaon Vicentno in progress. Italian section of the U.S.S.R. Italy Natural Gas Pipeline Expansion. Contr: Snamprogetti. Completion: 1991.

KENYA

KENYA PIPELINES CO. LTD. 355 miles, 6-8 in. products line from Nairobi to western Kenya (extension of existing Mombasa to Nairobi pipeline) in conceptual design stage. Consulting: Pencol. Completion: 1991.

KOREA

68 miles, 20-24 in. gas line. Part of a $130 MM project for a gas feeder pipeline system to join a pipeline from LNG facilities at Pyeong Taek to Inchon.

KOREA PETROLEUM DEVELOPMENT CORP. 541 miles, refined products trunkline system from refineries at Yosu and Onsan to Seoul. Completion: 1992.

LIBYA

416 miles, gas line from Al Brika to Khoms.

MALAYSIA

PETRONAS. 485 miles, 36 in. gas line from Kerteh on Malaysia's northeast coast to Singapore with branch lines to Kuala Lumpur and other large Malaysian cities. Total cost: $310 MM. Completion: Nov. 1991.

375 miles, 24-36 in. crude line. Planned.

MEXICO

PEMEX.

CRUDE LINES

39 miles, 16 in. from Imuris to Canonea. Contr: Spie Capag.

PRODUCTS LINES

37.3 miles, 24 in. from Venta de Carpio, Edo. de Mexico to Tulsa, Hgo. Under construction.

GAS LINES

155 miles, 24 in. from Jaltipan, Ver. to Salina Cruz, Oax. Planned.

18.6 miles, 16 in. from Matapionche, Ver. to Angostura, Ver. Engineering stage.

12.4 miles, 14 in. from Angostura, Ver. to Tierra Blanca, Ver. Engineering stage.

26.7 miles, 20 in. from Matapionche, Ver. to Paso del Toro, Ver. Engineering stage.

236.2 miles, 48 in. from Veracruz, Ver. to Santa Ana, Hgo. Under construction.

MOROCCO

900 miles of gas line through Morocco to Tangier to a link across the Strait of Gilbralter to Spain. Proposed. Completion: 1995.

*SOCIETE CHERIFIENNE DES PETROLES. 115 miles, 14 in. crude line from Port of Mohammedia to Sidi Kacen Refinery, study in progress. Engr: OTP.

THE NETHERLANDS

NV NEDERLANDSE GASUNIE. 12.5 miles, 36 in. gas line from Rysbergen to Nispen planned. Completion: Dec. 1990.

19 miles, 48 in. gas line from Balgzand to Oud. tocht. planned. Completion: Oct. 1991.

12.5 miles, 12 in. gas line from Waalwyk to Kedichem planned. Completion: Oct. 1991.

34.5 miles, 24 in. gas line from Ommelw to Witteveen. Completion: Oct. 1992.

NAM. 161 miles, from F3 area of the Dutch North Sea to the Dutch Coast. (joint venture with Elf Petroland and Energie Beheer Nederland). Contr: McDermott-ETPM. Completion: 1991 92.

NIGERIA

AGIP ENERGY & NATURAL RESOURCES and NNPC. 12 in. line from Aghbara offshore field to Brass terminal, Rivers State.

NIGERIAN NATIONAL PETROLEUM CORP. 234 miles, 16 in. and 75 miles, 12 in. products lines from Port Harcourt, Enugu, Auchi to Benin City, Nigeria. Design stage. Completion: 1990.

55 km, 16 in. Mogas/Gas oil product pipeline from proposed Bonny crude oil terminal to Port Harcourt refinery. Completion: June 1993.

55 km, 16 in. high pour fuel oil pipeline from proposed Bonny crude oil terminal to Port Harcourt refinery. Completion: June 1993.

SHELL PETROLEUM DEVELOPMENT. 27 miles, 24 in. crude line from Nkpoku to Bomu. Planned. Completion: Dec. 1990.

8 miles, 12 in. gas line from Cawthorne I flowstation to Alakiri gas plant. Planned. Completion: Jan. 1991.

14 miles, 12 in. gas line from Alakiri to Bomu. Planned. Completion: Jan. 1991.

7 miles, 8 in. crude line from Belema flowstation to Nembe Creek Cawthorne Channel trunkline. Planned. Completion: Dec. 1992.

43 miles, 20-24 in. crude line from Opukushi to Forcados terminal (Trans Ramos Pipeline). Planned. Completion: Dec. 1993.

6 miles, 8 in. crude line from Okpokonou flowstation to Southern Forcados Pipeline at Ogara Manifold. Planned. Completion: Dec. 1993.

6 miles, 8 in. crude line from Kanbo flowstation to Trans Ramos Pipeline at Kanbo Manifold. Planned. Completion: Dec. 1993.

NORWAY

STATOIL. 25 miles, 36 in. gas line from Zeepipe Sleipner to Statpipe. Eng: Snamprogetti. Planned. Completion: 1993.

524 miles, 30-40 in. gas line from Zeepipe Sleipner, Norway to Zeebruge, Belgium. (Zeepipe Natural Gas Transportation System - Phase 1) Eng: Snamprogetti. Completion: late 1993.

80 miles, 36 in. gas line from Zeepipe Troll to Heimdal. Planned. Completion: 1996.

95 miles, 40 in. gas line from Zeepipe Troll to Sleipner. Planned. Completion: 1996.

150 miles, 20 in. gas pipeline from Sleipner to Karsto. Planned. Completion: 1993.

PAKISTAN

PARCO. (Pak Arak Refinery Co. Ltd.) 537 miles, 16 in. product line from Lahore to Islamabad in the engineering stage. Completion: 1991.

SUI SOUTHERN GAS CO. LTD. 182 miles, 20 in. gas loops from Sui to Karachi. Construction in progress. Completion: Dec. 1990.

PAPUA NEW GUINEA

CHEVRON NIUGINI PTY LTD. 162 miles, 20 in. crude line from Iagifu-Hedina field to export terminal seeking govt. approval. Completion: 1992.

PERU

PETROLEOS DEL PERU. 364 miles, 26 in.; 300 miles, 10 in.; 64 miles, 8 in. gas lines from Camisea-Cuzco to Callao-Lima. Bidding. Completion: mid 1993.

SAUDI ARABIA

SAUDI ARAMCO. 1,200 km, 56 in. crude line from Arabian Gulf to Yanbu (Red Sea) in the engineering stage. Contr: Mannesmann AG. Completion: End 1992.

SINGAPORE

SHELL EASTERN PETROLEUM. 5 miles, twin 10 in. lines from Pulau Bukom island to distribution terminal on the mainland. One line will be a product line and the other sulfur line. Completion: Early 1991.

12 miles, 10 in. product line. Pandan products pipeline in the design phase. Contr: Bechtel. Completion: 1991.

SPAIN

CAMPSA. 134 miles, 8-12 in. products line from Tarragona to Barcelona-Gerona in engineering stage. Contr: Heymo. Completion: 1990.

*90 miles, 10 in. products line from La Coruna to Vigo in the engineering stage. Contr: Tecnicas Reunidas S.A. Completion: 1992.

*60 miles, 10 in. products line from Cartagena to Alicante in the engineering stage. Contr: Tecnicas Reunidas S.A. Completion: 1992.

CIA. ARRENDATARIA DEL MONOPOLIO DE PETROLEOS SA. 69 miles, 8 in. products line from Valladolid to Salamanca.

500 miles, product line. $150 MM. Completion: late 1991.

159 miles, 10 in. product pipeline from Corunna to Vigo in northwest Spain. Completion: Mid 1991.

EMPRESA NACIONAL DE GAS SA. 145 miles, 26 in. gas line from Sevilla to Brazatortas in engineering stage. Contr: Heymo. Completion: 1991.

44 miles, 24 in. gas line from Serrablo, Spain to Lacq, France. (joint venture with Gas de France and Gas du Sudouest). Contr: Heymo. Completion: 1991.

SWITZERLAND

GVM GASVERBUND MITTELLAND AG. 17 miles, 12 in. natural gas line planned. Contr: Helbling Engineering. Completion: End 1991.

*7.5 miles, 12 in. gas line from Arlesheim to Pratteln in the engineering phase. Engr: Helbling and Jauslin & Stebler Engin. Completion: End 1992.

*5 miles, 8 in. gas line from Lenzbrug to Villmergen in the engineering phase. Engr: Balzari & Schudel Engin. Completion: End 1992.

*GVO GASVERBUND OSTSCHWEIZ AG. *5.5 miles, 10 in. gas line from Gossau to Bischofszell planned. Completion: End 1991.

TANZANIA

TAZAMA PIPELINES LTD. 54 km, 8-12 in. crude line. pipeline rehabilitation, Phase 2. Contr: Saipem. Completion: 1990.

THAILAND

PETROLEUM AUTHORITY OF THAILAND. (PTT).

99 miles, 28-32 in. gas line from Erawan to Khanom district to Nakhon Si Thammarat Province. Feasibility study.

106 miles, 28-32 in. gas line from PTT's B structure gas field to Unocal Thailand Ltd's Erawan field. Feasibility Study.

8 miles, 16-28 in. laterial loop gas line from Station No. 6 to Bangpakong power plant. Completion: 1990.

300 miles, 16-24 in. gas line from Nam Phong Khonkan Province to Saraburi Province. Feasibility study. Completion: 1993.

18 miles, 8 in. gas spur line from Sri Racha to Laem Chabang in Chon Buri Province. $3.5 MM. Completion: 1990.

50 miles, 14-16 in. oil products line from eastern Bangkok north to Ayutthaya Province. Feasibility study.

437.5 miles, 18-22 in. gas line from Khonkaen Province to Chon Buri Province. Planned. Completion: 1993.

121 miles, 32 in. gas line from offshore Texas Pacific field, Gulf of Thailand to Erawan field, Gulf of Thailand. Planned. Completion: 1992.

TURKEY

BOTAS. Extension of 496 mile gas line from Ankara to Izmir. Proposed.

UNITED KINGDOM

*ARCO BRITISH LTD. 41 miles, 24 in. and 5 miles, 16 in. gas line from Pickerill gas field (UK-southern north sea) to Theddlethorp (UK mainland) in the engineering stage. Completion: 1992.

BRITISH GAS CORP. 15.6 miles, 36 in. gas line from Easington to Paull. Planned. Completion: Aug. 1991.

16 miles, 36 in. gas line from Epping to Horndon. Under study. Completion: 1992.

BP and TOTAL OIL MARINE. 15 miles, 12 in. link of St. Fergus gas line to Forties system at Cruden Bay. Contr: Norwest Holst.

BP EXPLORATION. 36 in. pipeline to serve Forties field in the U.K. North Sea. Contractor: ETPM Services (U.K.) Ltd.

15 mile, 12 in. natural gas liquids pipeline linking Total Oil Marine plc's St. Fergus, Scotland, gas terminal to BP's Cruden Bay terminal.

CATS-Central Area Transmission System. (40% Gas Council Exploration Ltd., 30% Amoco UK Exploration, 18% Amerada Hess, 12% Texas Eastern North Sea Inc.). $1.8 billion central U.K. North Seas gathering system in detailed design study. Completion: 1993.

ESSO PETROLEUM CO. 31 miles, 12 in. product line into Birmingham International Airport, England. Completion: Oct. 1991.

MOBIL NORTH SEA LTD. 210 miles, 30 in. gas line from Beryl oil field in the U.K. North Sea to St. Fergus, Scotland. Contr: Brown & Root and Saipem.

MOBIL. 210 miles, 30 in. from Beryl oil and gas field to St. Fergus, Scotland. 1991.

SHELL CHEVRON U.K. LTD. 251 miles, 10 in. ethylene pipeline system linking the Stanlow and Carrington plants in northwestern England to Grangemouth in the design phase. $154 MM. Contr: Bechtel. Completion: Early 1992.

SIMON STORAGE GROUP LTD. (North Thames Pipeline) 12 miles, 10 in. products line in design stage. Consulting: Pencol. Completion: 1990.

VENEZUELA

CORPOVEN SA. 373 mile products line from Puerto la Cruz refinery to Maturin, San Tome, Ciudad Bolivar, Puerto Ordaz, Puerto Ayacucho.

MARAVEN SA. Sumandes products line from San Lorenzo, Lake Maracaibo to El Vigia and Tachira (Andes). Planned. $213 MM. Completion: 1990.

ZAMBIA

TAZAMA PIPELINES LTD. 1,070 miles, 8-12 in. from Dar Es Salaam, Tanzania to Ndola. Design complete. On hold. Completion: 1990.

30 miles, 12 in. and 15 miles, 8 in. replacement of crude pipeline from Dar-Es-Salaam, Tanzania to Ndola, Zambia. Completion: 1990.

1,068 miles, 8 in. and 480 miles, 12 in. of crude pipeline from Dar-Es-Salaam, Tanzania to Ndola, Zambia. Contr: Inhouse. Completion: 1992.

ZIMBABWE

LONRHO PLC. 135 miles, 10 in. products line from Feruka to Harare (extension of Beira to Feruka pipeline). Study and conceptual design stage. Consulting: Pencol. Completion: 1991.

Copyright 1990 Oil & Gas Journal. All Rights Reserved.