Contract let for Cilacap refinery upgrade

March 27, 2012
PT Pertamina has let a contract to Foster Wheeler AG’s Global Engineering & Construction Group for management of an upgrade of its 348,000 b/d Cilacap refinery on Java, Indonesia.

PT Pertamina has let a contract to Foster Wheeler AG’s Global Engineering & Construction Group for management of an upgrade of its 348,000 b/d Cilacap refinery on Java, Indonesia.

The project includes construction of a 62,000 b/d resid catalytic cracking complex, to include a resid fluid catalytic cracker, an LPG Merox unit, and propylene recovery and gasoline hydrotreating units.

The Foster Wheeler unit will manage the engineering, procurement, and construction contractor.

The upgrade will enable the refinery to meet Euro 4 fuel quality specifications. It will boost production of LPG by 350,000 tonnes/year and enable the refinery to produce more than 140,000 tpy of propylene.

Completion is due in 2014.

Pertamina earlier planned to perform the upgrade in a joint venture with Mitsui & Co. Ltd., but the companies ended the agreement citing disagreement over the business model (OGJ Online, Mar. 23, 2010).

About the Author

Bob Tippee | Editor

Bob Tippee has been chief editor of Oil & Gas Journal since January 1999 and a member of the Journal staff since October 1977. Before joining the magazine, he worked as a reporter at the Tulsa World and served for four years as an officer in the US Air Force. A native of St. Louis, he holds a degree in journalism from the University of Tulsa.