Costs for six selected equipment items used in refining construction operations have been surveyed for the 2012-14 period. The accompanying table shows Nelson-Farrar equipment indexes for these items of equip
April 6, 2015

Gary Farrar
Contributing Editor

Costs for six selected equipment items used in refining construction operations have been surveyed for the 2012-14 period. The accompanying table shows Nelson-Farrar equipment indexes for these items of equip

Valves and fittings showed the greatest cost increase, rising to 2,457.2 in fourth- quarter 2014 from 2,314.1 during first-quarter 2012.

Three other items experienced more modest increases. In fourth-quarter 2014, non-metallic building materials rose to1,215.7 from an index of 1,128.8 in first-quarter 2012. During the same 36-month span, tanks and pressure vessels increased to 1,187.9 from 1,143.4. Fractionating towers showed a 46-point index gain over the 3-year period, rising to 1,467.8 in late 2014 from 1,421.4 in early 2012.

Tube stills decreased 695.1 during the final quarter of 2014 from 719.0 in first-quarter 2012.

The final category, bubble trays, experienced moderate gains during 2012-14, increasing to 1839.2 in fourth-quarter 2014 from an index of 1,827.3 in first-quarter 2012.