By OGJ editors
HOUSTON, Feb. 23 -- China Petroleum & Chemical Corp. (Sinopec) subsidiary Guangzhou Petroleum Co. has awarded a $25 million contract to subsidiaries of Foster Wheeler Ltd.'s Global Power Group for the engineering and supply of two 120 Mw circulating fluidized-bed (CFB) steam generators to its 154,000 b/d Guangzhou City refinery in Guangdong Province, China.
The project is part a Sinopec refinery expansion program.
Foster Wheeler International Engineering & Consulting (Shanghai) Co. Ltd. will design the coal and coke-fired CFBs that will be manufactured by Foster Wheeler Power Machinery Co. Ltd. at Xinhui, China.
The boilers are expected to be operational in 2007.