Two-step method verifies uprating of older German gas pipeline

A two-step evaluation, using a classical deterministic method and a modern probabilistic one, verified uprating a 35-year-old German natural gas pipeline.

Th 143854
In order to access this content, you must be logged-in and have an active subscription to the OGJ Premium Archive

Subscribe

More in Pipelines & Transportation