LNG CARRIER USING MEMBRANE TANK SYSTEM DELIVERED

The world's first LNG carrier that incorporates the Technigaz Mark III membrane tank system was delivered in October to its owner, Asia LNG Transport Sdn. Bhd., a joint venture between Nippon Yusen K.K. and Perbadanan Nasional Shipping Line Berhad of Malaysia. NKK built the 18,800 cu m, fully double-hull carrier Aman Bintulu at its Tsu works. Construction was completed in September with more than 2 months of sea trials and gas tests using - 190 C. liquid nitrogen and final gas trials with

In order to access this content, you must be logged-in and have an active subscription to the OGJ Premium Archive

Subscribe

More in Home