*Designates projects listed for the first time in the Journal, ARCO ALASKA Inc. 10 miles, 24 in. line from Pt. McIntyre field (Prudhoe Bay) to Lisburne Production facilities. Design stage. Contr: Brown & Root Braun. Completion: August 1993. CAJON PIPELINE Co. 122 miles, 20 in. line from offshore Calif. and San Joaquin valley oil fields to the Los Angeles basin. Completion: Early 1993. CELREON Corp. 11 miles, 24 in. line from Gaviota, Calif., to LasFlores, Calif. under construction.

*Designates projects listed for the first time in the Journal,

U.S. CRUDE LINES

ARCO ALASKA Inc. 10 miles, 24 in. line from Pt. McIntyre field (Prudhoe Bay) to Lisburne Production facilities. Design stage. Contr: Brown & Root Braun. Completion: August 1993.

CAJON PIPELINE Co. 122 miles, 20 in. line from offshore Calif. and San Joaquin valley oil fields to the Los Angeles basin. Completion: Early 1993.

CELREON Corp. 11 miles, 24 in. line from Gaviota, Calif., to LasFlores, Calif. under construction.

CHEVRON PIPE LINE Co. *7 miles, 20 in. replacement line from Wink, Tex. to El Paso, Tex. Completion: December 1993.

PERMIAN OPERATING Ltd. PARTNERSHIP. 13 miles, 6 in. from Dolphin field, Divide County, N.D., southeast to an Amoco pipeline in Burke County, N.D.

TRANSMOUNTAIN OIL PIPE LINE. 145 miles, 36 in. crude line from Low Point, Wash., to Anacortes and Ferndale/Cherry Point, Wash. proposed. Completion: 4th Qtr. 1993.

105 miles, 24 in. crude line from Burlington, Wash., to Low Point, Wash. proposed. Completion: 4th Qtr. 1993.

10 miles, 22-30 in. crude line in Washington State.

U.S. PRODUCT LINES

ASHLAND PIPELINE. 20 miles, 8 in. line in East Sparta, Ohio to Midland, Penn. Under construction. Completion: Summer 1993.

CHASE TRANSPORTATION Co. (Joint venture with Koch Industries - 50/50). 46 miles, 10 in. replacement products line from 8 in. line. Completion: 2nd Qtr. 1993.

*18 miles product line from Aurora, Colo. terminal to Denver airport. Approved.

COASTAL Corp. 40 miles, 8 in, line near Markham, Tex.

CHEVRON PIPE LINE Co. *1 5 miles, 10 in. line from Mont. Belvieu, Tex. to Deer Park, Tex. Completion: August 1994.

EXPLORER PIPELINE. 28 in. mainline expansion from Gulf Coast to Dallas-Fort Worth area under study.

KOCH HYDROCARBONS Co. 583 miles, 12 in. replacement line from Medford, Okla., to Mont Belvieu, Tex.

SEMINOLE PIPELINE Co. 540 miles, 14 in. line under construction from Gaines, Tex. to Mt. Belvieu, Tex. Contr: Flint Contr. Completion: January 1993.

U.S. GAS LINES

ALTAMONT GAS TRANSMISSION Co. 620 miles, 36 in. line from Port of Wild Horse, Mont., to Opal, Wyo. Completion: 1994.

AMERICAN PIPELINE. 38 miles, 16 in. in East Texas to connect Union Pacific Resources Carthage gas processing plant with pipelines to the west.

47 miles line in La. connecting its system to the Tennessee Gas Pipeline Co. line.

ARKLA PIPELINE GROUP. 28 miles, 16 in. replacement of line 2 in Okla., FERC approved. Completion: December 1993.

CITY UTILITIES. *76 miles, 16 in. natural gas line to interconnect with Arkla Energy Pipeline at Jane, Mo. and extend to Springfield, Mo. $25 MM. Design Engr/PM: Trigon Engr. Completion: Late 1993.

CITGO PIPELINE Co. *112 miles, 10-12 in. line from Lake Charles, La. to Mont. Belvieu, Tex. planned. Completion: 1994.

CNG TRANSMISSION Corp. 2.8 miles, 30 in. line from Rensselaer County, N.Y., to Albany County, N.Y. Approved. Completion: September 1993.

4.3 miles, 24 in. line in Wetzel County, W.Y. FERC approved. Completion: October 1993.

COLONIAL PIPELINE Co. 64 miles, 12 in. line planned from Bainbridge, Ga. to Jefferson County, Fla. Completion: 1994.

COLORADO INTERSTATE GAS Co. 23 miles, 4-10 in. line in Converse County, Wyo.

CONSUMERS POWER CO. 1.5 miles, 8 in. line planned from Northville Lyon 29 well site to Lyon 34 well site. Completion: 1994.

1.5 miles 16 in. line planned from Haggerty Rd. to Meadowbrook Rd. Completion: 1993.

11.7 miles, 36 in. line planned from White Pigeon comp. station to Hackman Rd. valve site. Completion: August 1993.

12 miles, 36 in. line planned from Hackman Rd. valve site to Babcock Rd. valve site. Completion: 1994.

1.8 miles, 10 in. lined planned from N211 well to Northville comp. station. Completion: 1994.

CONOCO Inc. 21 miles, 10 in. Grand Isle project.

EL PASO NATURAL GAS. 3.3 miles, 30 in. line from Monument, N.M. to Eunice, N.M. Before FERC. Completion: 4th Qtr. 1993.

89 miles, 30 in. line from Quartzsite, Ariz. to Yuma, Ariz. Completion: 1994.

EMPIRE STATE PIPELINE. *155 miles, 24 in. line from a point near Buffalo, N.Y. to Syracuse, N.Y. Contr: Mustang Engr. Completion: Spring 1993.

ENDEVCO Inc. 44 miles, 24 in. line from Delhi, La., to Vicksburg, Miss. planned.

19 miles, 8-12 in. line in Smith and Simpson Counties, Miss.

ENRON GAS GATHERING. (Joint venture with Dauphin Island Gathering Co) *70 miles, offshore gas gathering system in Mobile Bay, Ala.

FLORIDA GAS TRANSMISSION. 10.6 miles, 16 in. line from Hillsborough County, Fla. to Polk County, Fla. Before FERC. Completion: 1994.

164.6 miles, 30 in. line from Suwanee County, Fla., to Hillsborough County, Fla. Before FERC. Completion: November 1994.

16.2 miles, 22 in. fine from Polk County, Fla., to Hillsborough County, Fla. Before FERC. Completion: November 1994.

2.9 miles, 20 in. fine in Port Everglades, Fla. Before FERC. Completion: November 1994.

415.9 miles, 36 in. line from Washington Parish, La. to Suwanee County, Fla. Before FERC. Completion: November 1994.

114.9 miles, 30 in. line from Orange County, Fla. to Palm Beach County, Fla, Before FERC. Completion: November 1994. 39.4 miles, 26 in. line from Calcasieu Parish, La. to St. Landry Parish, La. Before FERC. Completion: November 1994.

30.1 miles, 30 in. line from Tangipahoa Parish, La. to Washington Parish, La. Before FERC. Completion: November 1994.

7.0 miles, 12 in. line in Polk County, Fla. Before FERC. Completion: November 1994. 2.1 miles, 10 in. line in Polk County, Fla. Before FERC. Completion: November 1994. 4.5 miles, 8 in. line in Polk County, Fla. Before FERC. Completion: November 1994. 2.3 miles, 6 in. line in Osceola County, Fla. to Orange County, Fla. Before FERC. Completion: November 1994.

1.9 miles, 6 in. line in Polk County, Fla. Before FERC. Completion: November 1994.

KN ENERGY Inc. 21 miles gas line from Aledo, Okla. to Thomas, Okla.

KOCH REFINING Co. *150 miles, 12 in. products and gas liquids pipeline from Corpus Christi, Tex. to Brownsville, Tex. Completion: 4th Qtr. 1993.

LIBERTY PIPELINE Co. *30 miles, 30 in. line offshore and 8 miles, 30 in. onshore gas line from a receipt point near South Amboy, N.J. to delivery point near Long Island. Before FERC.

MACKENZIE PORCUPINE PIPELINE Co. *750 miles natural gas pipeline planned from McKenzie Delta area in Canada to Kenai, Alas. Completion: Late 1997.

MAGNOLIA PIPELINE Co. (Basin Pipeline Corp. and a unit of Transco Energy Co.) 55 miles intrastate line, 40 miles of laterals from Alabama's Black Warrior basin to Transco's interstate fine in Central Ala. $55 Million.

MAPCO. *31 miles, 8 in. NGL line to connect Mesa-Satanta plant in Hugoton field in Kansas to existing system. Engr. stage. Completion: June 1993.

MICHIGAN GAS STORAGE Co. 22 miles, 36 in. line planned from Muskegon River Comp. Stat. to Herrick Rd. valve site. Completion: 1993.

MISSOURI PIPELINE Co. 22 miles of 1216 in. line from Curryville, Mo., to St. Charles and West Alton, Mo. $15 MM.

Converting 70 miles of existing crude line to gas line in Pike, Lincoln, and St. Charles Counties, Mo.

MOJAVE PIPELINE Co. *300 miles gas pipeline expansion from Topock, Ariz. to Sacramento and the East Bay area of Calif. Contr: Wolder Engr. & Const. $500 MM.

NOARK PIPELINE SYSTEM. 258 miles gas line across Arkansas under construction. $73MM.

NORTHWEST PIPELINE Corp. 39 miles, 30 in., 6 miles, 20 in., and 15 miles, 24 in. line expansion project in Wash. Contr: Gregory & Cook.

ONYX GATHERING Co. *13 miles, 8-12 in. natural gas lines to connect three electrical power plants.

PACIFIC GAS AND ELECTRIC. 294 miles, 42 in. and 110 miles, 36 in. from Malin, Ore., to Fresno County, Calif. $849 MM. Project manager: Bechtel. Completion: November 1993.

PACIFIC GAS TRANSMISSION. 401 miles, 42 in. from Kingsgate, B.C., to Malin, Ore. $841 MM. Project manager: Bechtel. Completion: November 1993.

*65 miles, 42 in. gas line expansion from Crescent, Ore. to Redmond, Ore. Contr: Willbros Energy. Completion: August 1993.

SEAGULL ENERGY Corp. 73 miles, four pipelines from Deer Park, Tex., to Mont Belvieu, Tex.

SHELL PIPELINE Co. 7.3 miles, 121/4 in. line in the Gulf of Mexico from Bullwinkle platform to Boxer platform.

SUNCOAST PIPELINE Co. (Joint venture of United Gas Pipe Line Co., ANR Pipeline Co., and Florida Power Corp.) 856 miles, 30 in. gas line from Walnut Hill, Fla. to Tampa area to Fort Lauderdale. $1,000 MM.. Completion: Winter 1994-95.

TENNECO GAS. *6.5 miles, 36 in. line in New York. Completion: November 1993.

*3.5 miles, 36 in. line in Mass. Completion: November 1993.

*1.5 miles, 36 in. line in Mass. Completion: November 1993.

*8.9 miles, 24 in. line in Mass. Completion: November 1993.

TEXAS EASTERN TRANSMISSION (joint venture with ANR Pipeline) 204 miles, 30 in. line from existing and proposed gas processing plants in Mobile county, Ala., Northwest to Texas Eastern's main line in Kosciusko, Miss. $153.3 MM. Before FERC.

(Texas Eastern only) 55 mile, 24 in. offshore line from Mobile County, Ala. and future offshore production facilities in the Norphlet trend southwest to a proposed Viosca Knoll extension of the company's Main Pass pipeline system. $72.5 MM.

*8 miles of loop and replacement line in Ohio and Penn.

TRANSCANADA PIPELINE *(Joint venture with Coastal Corp.)200 miles natural gas line from the Iroquois system at Canajoharie, N.Y. through the southern corner of Vermont to near Boston. Planned. $320 MM.

TRANSCONTINENTAL GAS PIPELINE Co. 23.94 miles, 36 in. loops in Monroe and Luzerne Counties, Pa. Contr: Murphy Bros.

48 miles, 12-30 in. from Edison to Riverdale, N.J. Contr: Napp-Grecco Corp.

5 miles, 36 in. in Morris and Essex Counties, N.J. Contr: Otis Eastern Services Inc.

9.4 miles, 10 in. line on High Island. Tex.

12.2 miles, 16 in. line on Mustang Island, Tex.

47 miles, 30 in. line from pipelines in N.J. across New York Bay to Long Island and into the New York City area terminating near JFK Airport. $115 MM.

TRANSOK, Inc. *34 miles, 1 0 in. line near Mertzon (Irion County), Tex. to San Angelo (Tom Green County), Tex. under construction. Contr: Tennesse Pipeline Constr. Completion: June 1993.

TRANSTEX GATHERING SYSTEM 40 miles, 12 in. from High island block A69 to block A109.

UNITED GAS PIPE LINE Co. 13.1 miles, 24 in. phase IV replacement line in Baton Rouge - New Orleans, La. Completion: November 1993.

WILLIAMS NATURAL GAS Co. '30 miles, 6 in. line from Harper, Kan. to Wichita, Kan. Under review.

ALGERIA

SONATRACH. 90 miles, 8-14 in. gas line from Rhourde Chouff and Rhourde Hamra gas field development in progress. Contr: Snamprogefti. Completion: 1994.

400 miles, 42 in. gas line from Hassi R'Mel to Skikda under construction. Contr: Spie-Capag. Completion: 1993.

313 miles gas line to connect with Morocco and Seville, Spain. Completion: 1995.

67 miles, 8-12-24 in. products line under construction. Hamra Natural Gas Process plant. Contr: Snamprogefti. Completion: 1994.

*268 miles, LPG line from Alrar-Rhourde-Houss to Hassi R'Mel. (phase I of a 614 miles of line). Completion: 1996.

SONELGAZ. 300 mile gas line from Hassi R'Mel gas field in Algeria to the Moroccan border. Proposed. Completion: 1995.

ARGENTINA

GOBIERNO PROVINCIA DE CORDOBA. *2.3 miles, 8 in.; 22.9 miles, 6 in.; and 51.6 miles, 3 in. gas line planned from Alma Fuerte to Villa Gral. Belgrano. Contr: Construcciones Protexa. Completion: December 1993.

YFP. (joint venture with Chile's ENAP) $200 MM trans-Andean oil pipeline project. Completion: Mid-1994

830 miles, 14 in. and 10 miles, 4 in. LPG line under construction from Lugen de Guyo, Medoza to La Metenza, Buenos Aires. Contr: McKee Del Plata SA. Completion: October 1993.

AUSTRALIA

GAS & FUEL CORP OF VICTORIA. 62 miles, 6 in. natural gas line from Allansford to Portland City gate under construction. Contr: Minson Constructions. Completion: June 1993.

10 miles, 8 in. natural gas in Portland City under construction. Contr: Comdain Constructions. Completion: June 1993.

*5 miles, 8 in. natural gas line under construction from Dromana to Rosebud. Completion: April 1994.

*17 miles, 6 in. natural gas line approved from Paarate to Cobden. Completion: May 1994.

MAGELLAN PETROLEUM Corp. 375 mile gas line from the Amadeus-Darwin pipeline to the Nabalco bauxite mine and alumina refinery at Gove. Contr: Nabalco pty. Ltd.

BELGIUM

DISTRIGAZ. 63 miles, 16 in. gas line from Dalhem to Bastogne. Completion: December 1993.

4 miles, 10 in. gas line from Sint-Gillis-Waas to Sint-Niklaas planned. Completion: December 1993.

4 miles, 10 in. gas line in Gent planned. Completion: December 1993.

*19 miles, 12-20 in. gas line from Lichtervelde to Nieuwpoort. Completion: 1993.

*6 miles, 22-30 in. gas line from Loenhout to Rijkevorsel. Completion: 1993.

BOLIVIA

YACIMIENTOS PETROLIFEROS FISCALES BOLIVIANOS. Natural gas line from Santa Cruz de la Sierra to Porto Suarez, connecting at Mato Gross do Sul, Brazil.

BRAZIL

PETROLEOS BRASILEIRO. *250 miles, B-10 in. products line under construction in Madre de Deus/Jequie/Itabuna.

*165 miles, 8-10 in. products line under construction in Araucaria/Itajai/Florianopolis.

*24 miles, 14-16 in. products line under construction in Duque de Caxias/llha D'agua.

1,900 miles natural gas line from Santa Cruz, Bolivia to Sao Paulo, Brazil dividing into trunk line near Campinas south to Porto Alegre and spur to existing Rio de Janeiro-Sao Paulo line. Completion: 1995.

CANADA

ALBERTA GAS TRANSMISSION Div. *65 miles, 4-12 in. line planned/building in various locations in Alta. Completion: April 1993,

*103 miles, 20-48 in. line under construction in various locations in Alta. Completion: April 1993.

*51 miles, 4-12 in. line planned in various locations in Alta. Completion: November 1993.

*28 miles, 36-42 in. line planned in various locations in Alta. Completion: November 1993.

AMOCO CANADA. *20 miles, 12 in. products line from Edmonton to Fort Saskatchewan. Seeking approval. Completion: December 1993.

BOW RIVER PIPELINE Ltd. 51 miles heavy oil piline to connect with delivery point near Coutts, Alta.

CANADIAN WESTERN NATURAL GAS. *27 miles, 20 in. gas line from Beiseker to East Calgary planned. Completion: 1993.

FOOTHILLS PIPELINES (YUKON) Ltd. 1,429 miles of gas line from the Arctic Coast near inuvik, North West Territory to Caroline in Central Alberta to connect with existing North American pipeline systems. $4.4 billion. Before NEB. Completion: 1996.

PACIFIC COAST ENERGY Corp. (joint venture of Westcoast Energy and Chieftain Development) 118 miles, 101/,. in. Mainland portion of the Vancouver Island pipeline project. Contr: Majestic Contr. Ltd.

PETROLEUM RESOURCES Ltd. 21 miles, sour gas pipeline near Calgary. $14 million. Approval received.

POLAR GAS Ltd. 1,450 miles, 36 in. from Canadian Mackenzie Delta Pipeline Project to Caroline, Alberta planned. Contr: Transcanada Pipelines Ltd./Tenneco Inc./Panarctic Oils Ltd. Completion: 2000-2005.

POUCE COUPE PIPE LNE Ltd. 16 miles of crude line connecting facilities built by Norcen Energy and Canadian Hunter in Northeast B.C. with Peace Pipe system in Northwest Alta.

TRANSCANADA PIPELINES. 122 miles, 48 in. line in Sask. Contr: Majestic Contractors. Completion: June 1993.

64 miles, 48 in., 3 miles, 48 in., and 9 miles, 42 in. in Sask. and Man. Contr: Banister/Marine. Completion: June 1993.

63 miles, 42 in. line in N.W. Ont. Contr: Spie Const. Completion: June 1993.

36 miles, 42 in. line in N. Ont. Contr: Premier Murphy. Completion: June 1993.

87 miles, 42 in. line in North Bay Shortcut, Ont. Contr: Banister/Marine. Completion: June 30, 1993.

*35 miles, 42 in. in Kenora, Ont. area. Contr: O.J. Pipelines.

TRANSGAS.*33.6 miles, 12 in. gas line from Whitewood, Sask. to Moosomin, Sask. Final design stage. Engr: UMA Engr. Ltd. Completion: July 1993.

*43.5 miles, 8 in. gas line from Wapella, Sask. to Carlyle, Sask. Preliminary design stage. Completion: October 1993.

UNION GAS LTD. *10.4 miles, 48 in. gas line from St. Mary's to Beachville, Ont. planned. Completion: October 1993.

*10.9 miles, 48 in. gas line planned from Bright to Cambridge, Ont. Completion: October 1993.

*6.6 miles, 30 in. and 3.4 miles, 36 in. gas line from Bickford to Dawn, Ont. planned. Completion: October 1993.

CHINA

CHINA NATIONAL OIL Corp. 180 mile, 16.77 in. crude line from Zhongyuan oil field to Luoyang, Henan, refinery.

40 miles, 12-20 in. crude and products line planned from Kwang-in to Tau-Yuan. Completion: June 1997.

190 miles, 8-24 in. gas line under construction from Yungan to Tunghsiao. Completion: June 1995.

*482 miles, 28 in. trunkline from Yacheun 13-1 field to gas receiving station at Hong Kong.

*62 miles, 14 in. gas line to shore base at Sanya on Hainan.

CHINA, TAIWAN

CHINESE PETROLEUM Corp. 40 miles, 12-20 in. crude and product line planned in northern oil terminal.

COLOMBIA

ECOPETROL. 17 miles, &in. product line from Guacari to Yumbo.

*1.6 miles, 24 in. crude line at Pozos Colorados (offshore), planned. Contr: Construcciones Protexa. Completion: February 1994.

*72 miles, 12 in. products line planned from Bahja Malaga to Buga (Part 11). Contr: Construcciones Protexa. Completion: March 1994.

PROMIGAS S.A. 373 miles, 20 in. and 2,459 miles, 24 in. gas line from Pajaro to Bogota under study.

7 miles, 4 in. gas line from main gas pipeline to Montelibano planned.

9.3 miles, 3 in. gas line from main gas pipeline to Corozal planned.

12.4 miles, 4 in. gas line from main gas pipeline to Arjona planned.

8.7 miles, 4 in. gas line from Barranquilla to Puerto Colombia planned.

5.4 miles, 3 in. gas line from main gas pipeline to Galapa planned.

COMMONWEALTH OF INDEPENDENT STATES

CASPIAN PIPELINE CONSORTIUM. *500 miles, 42 in. crude line from Grozny to Novorossysk, Russia in preliminary engineering stage. Completion: Late 1995.

CZECHOSLOVAKIA

MERO-IKL Ltd. *(Joint venture of Kaucuk Kralupy and Chemopetrol Litvinov) 211 miles, crude pipeline from ingoistadt, Germany to Kralupy, Czec. Completion: 1995.

DENMARK

DANSK OLIE OG NATURGAS. 5 miles, 12 in. gas line from Kalvebod to HCV power plant. Under design. Completion: 1993 15 miles, 12 in. gas line from Milov to Svnnemollen under study. Completion: 1993.

ECUADOR

MAXUS ENERGY. *128 miles, 16 in. line from Lago Agrio through Shushutindi in southern part of Block 16. Completion: 1st Qtr. 1995.

*91 miles, 4 in. product line for fueling Block 16. Completion: 1st Qtr. 1995.

EGYPT

EGYPTIAN GENERAL PETROLEUM Corp. 120 miles, 16 in. gas linefrom Shoukare to Suez under construction. Contr: Petrojet. Completion: December 1993.

FINLAND

NESTE OY. 26 mile extension of Nesty Oy's southern Finland gas line into greater Helsinki. Contr: E. M. Pekkinen Oy. Welding and fitting: Zarubezhjneftegasstroi (C.I.S). $10 MM.

FRANCE

GAZ DU SUD-QUEST. 44 miles, 26 in. gas line from Lacq to Port de Larrau in the engineering stage. Completion: 1993.

SPIE CAPAG. 300 miles, 12 in. product line in the engineering stage. Contr: John Brown. Completion: 1994.

SPMR. 93 miles, 42 in. product line in the engineering stage from La Mede to Buget. Contr: John Brown. Completion: 1993.

GERMANY

BEB. 59 miles, 48 in. gas line (in consortium with Bohlen & Doyen) from Achim to Veizen under construction. Completion: 1993.

46 miles, gas line from Achim to Salzwedel under construction. Contr: Suedrohrbau. Completion: 1991-93.

GASVERSORGUNG SUDDEUTSCHLAND GmbH. 18.6 miles, 20 in. gas line from Pfullendorf to Nenzingen planned. Completion: October 1993.

NORDRHEINISCHE ERDGASTRANSPORT. *19.1 miles, 36 in. gas loop-line under construction from Huls to Glehn. Contr: Pipeline Engr. GmbH. Completion: September 1993.

RHEIN-MAIN-ROHRLEITUNG. *5 miles, 20 in. products line planned/under construction from Koln to Wesseling. Contr: Cryogas Technik. Completion: March 1994.

RUHRGAS AG. 95 miles gas line from Werne to Wetter under construction. Contr: Pipeline Engineering GmbH. Completion: End 1993.

13.8 miles, 24 in. gas line planned from Vinnhorst to Ahiten. Contr: Pipeline Engineering GmbH. Completion: End 1993.

3.7 miles, 12 in. gas line planned from Bonn to Euskirchen. Contr: Pipeline Engineering GmbH. Completion: 1993/94.

102.5 miles, 48 in. gas line planned from Achim to Salzwedel. Completion: End 1993. (joint venture with BEB Erdgas und Erdot GmbH).

99 miles, 32 in. gas line planned from Breitbrunn to Anawalting. Completion: End 1995. (joint venture with Bayerngas GmbH. 7.9 miles, 12 in. gas line from Rich to Stockstadt planned. Contr: Pipeline Engineering GmbH. Completion: 1993.

*7.5 miles, 20 in. gas line planned near Dernbach. Contr: Pipeline Engineering GmbH. Completion: End 1993.

*7.7 miles, 12 in. gas line near Messenkamp planned. Contr: Pipeline Engineering GmbH. Completion: End 1994.

*16 miles, 16 in. gas line from Laimerstadt to Denkendorf planned. Completion: End 1994.

*40 miles, 40 in. gas line from Achim to Wardenburg planned. Completion: End 1994. (Joint venture with BEB Erdgas and Erdol).

*124 miles, 44 in. gas line from Salzwedel to Bernau planned. Contr: Pipeline Engineering GmbH. Completion: End 1994. (Joint venture with Verbundnetz Gas).

WINTERSHALL. feasibility study for a proposed product line from Wilhelmshaven to Saxony.

397 miles, 32-40 in. Midal gas line between Emden and Ludwigshafen. (Joint venture with Midal GmbH) Completion: 1993.

GREECE

DEPA (PUBLIC GAS Corp.) 62 miles, 36 in. and 257 miles, 30 in. gas line from Koula (Greek-Bulgarian border) to Athens. Completion: March 1993.

HUNGARY

HUNGARIAN OIL AND GAS Co. Ltd. (MOL Ltd.) *4-3 miles, 30 in. gas line from Gyor to Austrian border in the engineering stage. Completion: 1995.

*38 miles, 16 in. gas line under construction from Szank to Kalocasa. Completion: 1994.

INDIA

OIL INDIA Ltd. (Indian Oil Corp.) 840 miles, 22 in. petroleum products line from Kandla, Gujarat, to Bhantinda, Punjab. $240 MM. Consultant: Bechtel. Completion: December 1994.

INDONESIA

650 miles, 10-16 in. products line in the engineering stage in the Trans Java network. Completion: 1993.

IRAN

IGAT 2. 880 miles, 48-56 in. from Kangan gas field on the Persian Gulf to the Soviet Union. Contr: Saipem (will lay 20% of remaining pipeline).

NATIONAL IRANIAN OIL Co. 1,139.6 miles, 12 in. product line from Arak to Melayer and Mamadan.

ITALY

*8 miles, 16 in. fuel oil line under construction from power station Brindishi Nord to power station Brindishi Sud. Contr: Techint. Completion: June 1993.

ENICHEM SPA. 139 miles, 8-10 in. product line under construction from Montedison Petrochemical Complex, Ferrara to Enichem Petrochemical Complex, Ravenna.

JAPAN

2,050 miles, plans for a trans-Asian gas pipeline network from Russia and Japan to Indonesia and Australia.

KENYA

KENYA PIPELINES Co. Ltd. 355 miles, 6-8 in. products line from Nairobi to Kisumu/Eldoret, western Kenya (extension of existing Mombasa to Nairobi pipeline) under construction. Contr: NKK Corp/Lavalin. Completion: 1993.

KUWAIT

Note: Due to the Iraqi invasion/occupation of Kuwait, there has been a lot of damage to the existing pipeline system. Repairing the existing pipelines. Therefore, no plans or projects to construct new cross country pipelines have been made.

LIBYA

416 miles, gas line from Al Brika to Khoms.

MEXICO

PEMEX. 37 miles, 24 in. crude line from Venta de Carpio to Tula under construction.

24 miles, 24 in. gas line from San Pablo to Cuemanco under construction.

77.7 miles, 16 in. gas line from Palmillas to Toluca under construction.

24.2 miles, 24 in. gas line from San Pablo to Cuemanco under construction.

149 miles, 16 in. line from Salamanca to Tula.

155.3 miles, 12 in. product line under construction from Minatitlan to Salina Cruz.

*48 miles, 16 in. products line under construction from Salamanca to Guadalajara. Contr: Construcciones Protexa. Completion: April 1993.

*52 miles, 16 in. products line in Libramiento, Guadalajara planned. Contr: Construcciones. Completion: July 1993.

MOROCCO

900 miles of gas line through Morocco to Tangier to a link across the Strait of Gilbralter to Spain. Proposed: Completion: 1995.

THE NETHERLANDS

NYNEDERLANDSE GASUNIE. 7.5 miles, 36 in. natural gas line from Lochem to Lintvelde in the design stage. Completion: October 1993.

11.4 miles, 48 in natural gas line from Hommethof to Schinnen in the design stage. Completion: October 1993.

13.7 miles, 36 in. natural gas line from Amoco P15 to Maasviakte P18. Completion: October 1993.

4 miles, 42 in. natural gas line from Noordbrock to Midwolda in the design stage. Completion: October 1993.

12.4 miles, 36 in. natural gas line from Nispen to Ossendrecht in design stage. Completion: October 1993.

7.7 miles, 12 in. natural gas line from Oldboorne to Opsterland. Completion: October 1994.

*12.4 miles, 18 in. natural gas line from Zegge to Moerdyh in fuctional design stage. Completion: October 1994.

*37.3 miles, 48 in. natural gas line from Zweekhorst to Ravenstein under study. Completion: October 1994.

UNOCAL TRANSPORTATION. *26 miles, 10 in. gas line from Horizon Platform to Heider Platform in engineering stage. Contr: John Brown/Zeetech Engr. Completion: October 1993.

NIGERIA

NIGERIAN NATIONAL PETROLEUM Corp. 34 miles, 16 in. Mogas/Gas oil product pipeline from proposed Bonny crude oil terminal to Port Harcourt refinery. Completion: June 1993.

34 miles, 16 in. high pour fuel oil pipeline from proposed Bonny crude oil terminal to Port Harcourt refinery. Completion: June 1993.

292 miles, 12 in. products line from Port Harcourt to Benin City under construction. Completion: February 1994.

SHELL PETROLEUM DEVELOPMENT. 43 miles, 20-24 in. crude line from Opukushi to Forcados terminal (Trans Ramos Pipeline) under construction. Completion: March 1994.

3.5 miles, 12 in. crude line from Okpokonou flowstation to southern Forcados Pipeline at Ogara Manifold planned. Completion: December 1995.

6 miles, 16 in. crude line from Kanbo flowstation to Trans Ramos Pipeline at Kanbo Manifold planned. Completion: March 1994.

SPIE CAPAG. 300 miles, 12 in. product line in the engineering stage from Port Harcourt to Ore. Contr: OTP. Completion: 1994.

NORWAY

STATOIL. (Phase II) 186 miles, 36 in. to connect the Troll processing plant at Kolisnes to Sleipner and Heimdal. Completion: 1996-97.

(Phase III) *25 miles, 40-42 in. gas line from Dornumersiel to Emden for Europipe Development Project. (Onshore pipeline). Engr/PE/CS: Suedrohrbau GmbH. Completion: January 1995,

OMAN

PETROLEUM DEVELOPMENT OMAN. 110 mile four pipeline gas system. Contr: Saipem/Consolidated Contr. Co.

PAKISTAN

CRESCENT PETROLEUM Co. Feasibility study of 994 miles natural gas line from Doha, Qatar to Karachi.

PARCO. (Pak Arab Refinery Co. Ltd.) 217 miles, 16 in. product line extension into Lahore via Faisalabad in the engineering stage. Completion: 1995.

SUI SOUTHERN GAS Co. Ltd. 38 miles, 20 in. gas line from Shikarpur to Larkana, Sindh planned. Completion: June 1994.

75 miles, 24 in. gas line from Kandanwari to Karachi, Sindh planned. Completion: July 1993.

180 miles, 20 in. gas line from Kandanwari to Karachi, Sindh planned. Completion: July 1994.

PERU

PETROLEOS DEL PERU. 364 miles, 26 in.; 300 miles, 10 in.; 64 miles, 8 in. gas lines from Camisea-Cuzco to Callao-Lima. Bidding. Completion: Mid 1993.

52 miles, 6 in. gas and product line from Aguaytia to Pucallpa-Campo Verde. Completion: 1993.

52 miles, 4 in. product line from Aguaytia to Pucallpa-Campo Verde. Completion: 1993.

30 miles, 3 in. product line from Aguaytia to Pucallpa-Campo Verde. Completion: 1993.

PORTUGAL

280 mile line from Setubal south of Lisbon to Braga near the spanish border. Completion: 1993.

SAUDI ARABIA

SAUDI ARAMCO. 167 miles, 4-12 in. crude line under construction in the central region of Saudi Arabia. Contr: Suedrohrbau. Completion: September 1994.

*210 miles, 24 in. crude flowline project from Hawtah oil field to pump station #3. Contr: Suedrohrbau. Completion: September 1994.

SPAIN

C.L.H. (formerly listed as Campsa) 90 miles, 10 in products lne from La Coruna to Vigo under construction. Contr: Tecnicas Reunidas/Heymo. Completion: 1994.

EMPRESA NACIONAL DE GAS SA. 66 miles, 4-14 in. gas line from Oviedo to Tuy in the engineering stage. Distribution lines for Ferrol, Coruna and Santiago de Compostela. Contr: INITEC.

112 miles, 20 in. gas line from Oviedo to Tuy in the engineering stage. Contr: INITEC. 40 miles, 26 in. gas line from Ferrol to Villalba (Lugo) in the engineering stage. Contr: INITEC.

ENAGAS. *256 miles, gas line from Valencia to Alicante. Contr: Technicas Reunidas. Completion: 1994.

REPSOL PETROLEO SA. 218 miles, 22 in. crude line, and 10 in. gas and products line from Cartagena to Puertollano in the detail design stage. Engr/Const: INITEC. Completion: 1st Qtr. 1996.

SURINAME

STATE OIL Co. of SURINAME. 34.4 miles, 14 in. crude line form Catherina Sophia field to Tout Lui Faut terminal. Contr: Staatsolie.

SWITZERLAND

GASVERBUND OSTCHEWUIZ AG. 29 miles, 20 in. gas line from Ohringen (Winterthur) to Bischofszell. Completion: 1995.

2 miles, 10 in. gas line from Mettlen to Weinfelden. Completion: 1995.

TANZANIA

TAZAMA PIPELINES LTD. *908 miles, 8 in. and 400 miles, 12 in. crude line from Melela to Ndola. Completion: April 1994.

THAILAND

PETROLEUM AUTHORITY OF THAILAND. (PTT).

102 miles, 32 in. and 100 miles, 24 in. gas line, Bongkot-Erawan-Khanom, Thailand project. Engr/Contr: Bechtel. Completion: Late 1993.

100.6 miles, 24 in. natural gas line from Erawan to Khanom district to Nakhon Si Thammarat province. Completion: 1994.

106.3 miles, 32 in. natural gas line from PTT's B structure gas field to Unocal Thailand Ltd's Erawan field. Completion: 1993.

146.3 miles, 20 in. oil product line from Sri Racha, Chonburi province to Saraburi province under study. Completion: 1993.

158.8 miles, 10-18-24 in. white products line from Sri Racha, Chonburi province to Saraburi province. Completion: 1993.

TUNISIA

SOCIETE TUNISIENNE de L'ELECTRICITE. 82 miles, 20 in. and 66 miles, 24 in. gas line from M'Saken to Gabes projected. Completion: 1994.

SCOGAT. 228 miles, 48 in. gas line under construction. Algeria-Italy Transmediterranean gas pipeline expansion - Tunisia section. Contr: Snamprogetti. Completion: 1994.

UNITED KINGDOM

BORD GAIS EIREANN. 45 miles, 30-36 in. gas line in Southwest Scotland in the engineering stage. Engr: John Brown. Completion: September 1993.

BP EXPLORATION. 36 in. pipeline to serve Forties field in the U.K. North Sea. Contractor: ETPM Services (U.K.) Ltd.

15 mile, 12 in. natural gas liquids pipeline linking Total Oil Marine plc's St. Fergus, Scotland, gas terminal to BP's Cruden Bay terminal.

BRITISH GAS. *8 miles, 36 in. gas line from Horndon to Tilbury. Completion: October 1993.

*23 miles, 36 in. gas line from N. Morecambe Gas field to Barrow under construction. Contr: McDermott/ETPM. Completion: October 1993.

*29 miles, 42 in. gas line from Silk Willoughby to Peterborough. Completion: October 1993.

*32 miles, 42 in. gas line from Skitter to Hatton. Completion: October 1993.

*12 miles, 36 in. gas line from Huntingdon to Little Barford. Completion: October 1993.

CONOCO U.K. Ltd. *7 miles, 16 in. infield pipeline to move Caister gas to Murdock platform.

*112 miles, 26 in. export platform from Murdock to Theddlethorpe.

VENEZUELA

CORPOVEN. 105 miles, 36 in crude line and a 20 in. product line planned.

YUGOSLAVIA

MAKPETROL. 62 milesgas line from Kriva Palanka, U.S.S.R. near the Bulgarian border to the Macedonian republic capital of Skopje, Yugoslavia. Completion: March 1994.

ZIMBABWE

COMPANAI DO PIPELINE MOCAMBIQUE. 180 miles, 10 in. products line rehabilitation from Beira, Mozambique to Feruka, Zimbabwe. Contr: John Brown.

PETROZIM LINE (PVT) Ltd. (a joint venture of Zimbabwe National Oil Co. and Lonhro plc) 126 miles product line from Feruka to Harare. $66.7 MM. Completion: July 1993.