ExxonMobil awards FPSO contract for Longtail

ExxonMobil Guyana has awarded SBM Offshore contracts to build and install an FPSO for the Longtail development in the Stabroek block.

ExxonMobil Guyana Ltd. (EMGL) has let contracts to SBM Offshore for the Longtail development project in Stabroek block, about 200 km offshore Guyana.

Under these contracts, SBM Offshore will construct and install a floating production, storage, and offloading vessel (FPSO). SBM Offshore expects to operate the FPSO for an initial period of 10 years. The award follows completion of front-end engineering and design studies and the final investment decision on the project by EMGL and its block co-venturers.

The FPSO design is based on SBM Offshore’s Fast4Ward program, incorporating the company’s tenth new-build, multi-purpose floater hull. The FPSO will be designed to produce and process 1,200 MMcfd of gas and 250,000 b/d of condensate. The FPSO will be spread moored in a water depth of about 1,750 m and will be able to store about 2 million bbl of condensate.

Longtail is the eight development within Stabroek block.

ExxonMobil Guyana Ltd. operates the Stabroek block with a 45% interest. Hess Guyana Exploration Ltd. holds 30%, and CNOOC Petroleum Guyana Ltd. holds 25%.

Sign up for our eNewsletters
Get the latest news and updates