Advanced modeling, real-time model updating improve extended-reach drilling success

By applying advanced predrill modeling combined with real-time model updates, ChevronTexaco Corp., San Ramon, Calif., successfully drilled three extended-reach wells to 19,000-ft horizontal displacement in the Petronius field of Gulf of Mexico's Viosca Knoll Block 786 (Fig. 1).

Th 116658
In order to access this content, you must be logged-in and have an active subscription to the OGJ Premium Archive

Subscribe

More in Drilling & Production