Simulation model determines optimal tank farm design

Foster Wheeler USA recently completed a detailed tankage and hydraulic study for Kuwait National Petroleum Co. which assessed the existing tank farms at three refineries.
Feb. 6, 2004

Click on the pdf link below to view entire article.


Foster Wheeler USA recently completed a detailed tankage and hydraulic study for Kuwait National Petroleum Co. which assessed the existing tank farms at three refineries.

Sign up for our eNewsletters
Get the latest news and updates