Cost-effective design reduces C2 and C3 at LNG receiving terminals

An LNG receiving terminal with a C2+ or C3+ separation facility can receive LNG feeds with varying compositions, meet stringent calorific value export gas specifications, and decrease capital and operting costs.
May 16, 2003

Click on the pdf link below to view entire article.


An LNG receiving terminal with a C2+ or C3+ separation facility can receive LNG feeds with varying compositions, meet stringent calorific value export gas specifications, and decrease capital and operting costs.

Sign up for our eNewsletters
Get the latest news and updates