Cost-effective design reduces C2 and C3 at LNG receiving terminals
Click on the pdf link below to view entire article.
An LNG receiving terminal with a C2+ or C3+ separation facility can receive LNG feeds with varying compositions, meet stringent calorific value export gas specifications, and decrease capital and operting costs.