Enhanced NGL recovery process selected for Neptune gas plant expansion

A study has been conducted for the design and costruction of a second 300 MMcfd NGL recovery train at the Neptune plant in St. Mary Parish, Louisiana.
July 14, 2003

Click on the pdf link below to view entire article.

A study has been conducted for the design and costruction of a second 300 MMcfd NGL recovery train at the Neptune plant in St. Mary Parish, Louisiana.

Sign up for our eNewsletters
Get the latest news and updates