Petróleo Brasileiro SA (Petrobras)  has let contract to Yinson Bergenia Production BV and Yinson Bergenia Serviços  de Operação LTDA, both from Yinson Production PTE Ltd. Group, for chartering  and provision of services of the Maria Quitéria FPSO for the Parque das Baleias  integrated project, to be installed in Jubarte field in the north Campos basin.  The letter of intent was signed in November 2021 (OGJ  Online, Nov. 15, 2021).
The project expects to interconnect  17 wells (nine oil producers, eight water injectors) to the FPSO. The vessel will have  the capacity to process 100,000 bbl of oil and 5 million cu m/d of gas and is  expected to start production in fourth-quarter 2024. The contracts will last 22  years and 6 months from the unit's final acceptance.
Parque das Baleias is formed by Jubarte,  Baleia Anã, Cachalote, Caxaréu, Pirambú, and Mangangá fields. In 2019,  Petrobras and the National Agency of Petroleum, Natural Gas and Biofuels (ANP) agreed  to extend the concession term until 2056 for the new unified Jubarte field. Currently,  four platforms are in operation: P-57, P-58, Cidade de Anchieta FPSO, and  Capixaba FPSO, the latter operating only until 2022.