Aker BP entered into a letter of intent with Tendeka to supply sand-face completion equipment to its Norwegian assets.
Over the next 3 years, the existing frame agreement will see Tendeka deliver its sand screens and FloSure Autonomous Inflow Control Devices (AICDs) to Aker BP’s fields on the Norwegian Continental Shelf. Aker BP is operator of Valhall, Ula, Ivar Aasen, Alvheim, and Skarv field hubs.
The field adjustable FloSure AICDs preferentially chokes unwanted produced fluids whilst promoting production of oil from the entire length of the well, leading to greater recovery, lower water cuts, and less gas production, the service provider said.
In 2019, Tendeka secured the sand and inflow control contract for Equinor-operated Troll field on the Norwegian Continental Shelf. The 4-year exclusive contract will see the company deliver and install up to 100,000 m/year of sand screens and FloSure AICDs for sand-face completion.