One fully operational, the new plant will be able to produce up to 61 million gal/year of renewable fuels, with flexible output including renewable diesel and sustainable aviation fuel.
The plan is for the facility to be engineered to operate independently of the national electrical grid and powered by a 550-MW solar array connected with battery energy storage systems.
This detailed map highlights active, under construction and proposed energy infrastructure along the Gulf Coast, including pipelines, offshore platforms, LNG plants, and CCS projects, with key locations and operator details.