ALBERTA EXPANSION-CONCLUSION TRANSIENT SIMULATIONS HELP DECIDE EXPANSION DESIGN

Stanley R. Kitt Foothills Pipe Lines Ltd. Calgary Foothills Pipe Lines Ltd., Calgary, evaluated two approaches to solving pipeline-capacity delivery problems around the Empress, Alta., extraction plants (Part 1, OGJ, June 24, p. 38). This capacity constraint resulted from the requirement for gas stripping by low-pressure Empress extraction plants which severely limited the operating pressure level of the high-pressure pipeline there. The engineering evaluation employed off-line hydraulic

In order to access this content, you must be logged-in and have an active subscription to the OGJ Premium Archive

Subscribe

More in Capacities