| | | | | | Global oil demand is expected to increase in 2025 and the outlook carries into 2026, where IEA has raised its demand growth forecast by 90,000 b/d to 860,000 b/d year-on-year. |
|
|
|
| |
|
|
|
| | | | Sponsored | | The Model VF-150FS feeder was designed to accurately meter materials such as Guar, Polyacrylamide and FR powders in mobile fracing systems. Includes foot mounted design with hydraulic or inverter duty motor supported directly from the feeder trough for greater installation versatility and easy disassembly for cleaning. |
|
|
|
| |
| | |
|
|
| | | | The project is expected to add 15,000 boe/d gross peak annualized average production from the Atlantis platform, which has a gross production capacity of up to 200,000 b/d of oil. |
|
|
|
| |
|
|
|
| | | | Despite Shell’s exit from the first phase, it may consider involvement in expansion phases. Regardless, development plans for Phase 1 remain unchanged with plans for two FLNG units with combined capacity of 12 million tpy. |
|
|
| The find represents the first oil and gas discovery from Kingriali formation in Nashpa block, the company said. |
|
|
|
| |
|
|
|
| | | | Sponsored | | As process conditions grow more extreme, the demands on pumping and containment systems intensify. Applying expertise in material science, hydraulic efficiency, and full-cycle service support is critical to sustaining reliable performance. Explore how KSB engineers help companies do this while reducing lifecycle costs and strengthening the operational certainty that today’s facilities require. |
|
|
|
| |
| | |
|
|
| | | DNO will drill in the region following a spending hiatus. Despite halting new drilling in 2023, the operator is still pumping 80,000 bo/d from the area. |
|
|
|
| |
|
|
|
| | | | In this episode, OGJ takes an updated look at the growing oversupply in global crude markets. |
|
|
|
| |
|
|
|
| | | | | | | | An ANN model offers the most accurate and reliable prediction of bubble-point pressure for Rmelan crude oils. For practical field applications, an empirical correlation can serve for preliminary estimates but will not provide the most accurate estimates for reservoir studies, production forecasting, and reserves calculation. |
|
|
| | |
| |
| | |
|
|
| | |
|
| | |
|