| | | | | | The arbitration tribunal found Venture Global failed to declare the Calcasieu Pass LNG plant's commercial operation date in a timely manner. bp is seeking over $1 billion in damages, a hearing for which is expected next year. |
|
|
|
| |
|
|
|
| | | | Sponsored | | The Model VF-150FS feeder was designed to accurately meter materials such as Guar, Polyacrylamide and FR powders in mobile fracing systems. Includes foot mounted design with hydraulic or inverter duty motor supported directly from the feeder trough for greater installation versatility and easy disassembly for cleaning. |
|
|
|
| |
| | |
|
|
| | | | With a total capacity of 2.5 bcfd, the Mustang Express Pipeline will include three primary segments linking natural gas-producing regions to LNG export plant infrastructure along the Texas Gulf Coast. |
|
|
|
| |
|
|
|
| | | | Drilling operations for the well, which lies about 78 km offshore in the north-central part of Block 5 offshore Suriname, are expected to take about 90 days. |
|
|
|
| |
|
|
|
| | | | Sponsored | | Plastatech® develops our PVC geomembranes with maximum flexibility for ease of handling and installation. Designed to resist temperatures and UV exposure, our products offer high tensile and puncture strength and long-term performance, ideal for reserve pits, ponds, pad liners, and secondary containment. |
|
|
|
| |
| | |
|
|
| | | | The rig count in Canada is up 3 rigs to 193 rigs working for the week, attributable to an increase in gas-directed rigs. In the US, a 2-rig drop brought the rig count to 547 for the week. |
|
|
|
| |
|
|
|
| | | Through the $702-million deal with Sumitomo Chemical, Aramco is now Petro Rabigh’s largest shareholder with an equity stake of about 60%. |
|
|
| | Murlach adds a peak net production of about 15,000 boe/d to the bp-operated Eastern Trough Area Project (ETAP) in the central North Sea. |
|
|
|
| |
|
|
|
| | | | Sponsored | | Master Bond EP35SP is a two part epoxy system for bonding and sealing applications, providing resistance to many chemicals such as oils, acids, bases, water, fuels, and especially petrochemicals. It features both a high glass transition temperature (Tg) and a broad service temperature range. Its Tg measures 215-220°C and its serviceability extends from -62°C to +288°C (-80°F to 550°F). |
|
|
|
| |
| | |
|
|
| | |
|
| | |
|