| | | | | | Swett took over the term of Mark Christie, who served as FERC chairman for most of the first 6 months of the year before being replaced by Democrat David Rosner. LeCerte replaces Democrat Willie Phillips, who served as chairman during the Biden administration. |
|
|
|
| |
|
|
|
| | | | Sponsored | | The Model VF-150FS feeder was designed to accurately meter materials such as Guar, Polyacrylamide and FR powders in mobile fracing systems. Includes foot mounted design with hydraulic or inverter duty motor supported directly from the feeder trough for greater installation versatility and easy disassembly for cleaning. |
|
|
|
| |
| | |
|
|
| | | | At 420.3 million bbl, US crude oil inventories are about 4% below the 5-year average for this time of year, the EIA report indicated. |
|
|
|
| |
|
|
|
| | | | Sponsored | | Plastatech® develops our PVC geomembranes with maximum flexibility for ease of handling and installation. Designed to resist temperatures and UV exposure, our products offer high tensile and puncture strength and long-term performance, ideal for reserve pits, ponds, pad liners, and secondary containment. |
|
|
|
| |
| | |
|
|
| | | | Mott will take over the chief financial role from Brent Wahl, who will resign later this month from NextDecade to join a digital infrastructure company. |
|
|
|
| |
|
|
|
| | | Eni North Africa resumed oil and gas exploration in Block 16/4 offshore Libya after a hiatus of more than 5 years. Exploration well C1-16/4 was secured and suspended at the start of the COVID-19 pandemic. |
|
|
|
| |
|
|
|
| | | | Sponsored | | Master Bond EP35SP is a two part epoxy system for bonding and sealing applications, providing resistance to many chemicals such as oils, acids, bases, water, fuels, and especially petrochemicals. It features both a high glass transition temperature (Tg) and a broad service temperature range. Its Tg measures 215-220°C and its serviceability extends from -62°C to +288°C (-80°F to 550°F). |
|
|
|
| |
| | |
|
|
| | | Drilling of the Kavango West 1X exploration well had advanced ahead of schedule in the shallower section of the well, which caused a deferral of operations for several weeks at the current casing depth while waiting on casing strings for the final section of the well. |
|
|
|
| |
|
|
|
| | |
|
| | |
|