SOUR-GAS PIPELINE--1 RISK-ANALYSIS PROCEDURES ENSURE SYSTEM SAFETY

Mahboobul Mannan, Dwight B. Pfenning, C. Dale Zinn Jones & Neuse Inc. Austin, Tex. Conducting risk analysis and safety-engineering studies before construction of a sour-gas pipeline system will build redundancies into the system and ensure safe operation and maintenance. A recent analysis of a sour gas pipeline built in Texas provides an example of procedures for safety engineering and risk assessment.

In order to access this content, you must be logged-in and have an active subscription to the OGJ Premium Archive

Subscribe

More in Production Operations