<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
<channel>
<title><![CDATA[RSS for Pigging]]></title>
<description><![CDATA[Pigging news and technical articles from Oil & Gas Journal. Search Pigging latest and archived news and articles]]></description>
<link><![CDATA[http://www.ogj.com/topics/]]></link>
<atom:link xmlns:atom="http://www.w3.org/2005/Atom" type="application/rss+xml" rel="self" href="http://www.ogj.com/topics/urss?pageid=782325"/>
<item>
<title><![CDATA[SUBSEA PRECOMMISSIONING—1: Nord Stream natural gas pipeline highlights need to integrate precommissioning]]></title>
<link><![CDATA[http://www.ogj.com/articles/print/volume-111/issue-5/special-report-offshore-petroleum/nord-stream-natural-gas-pipeline-highlights.html]]></link>
<guid>http://www.ogj.com/articles/print/volume-111/issue-5/special-report-offshore-petroleum/nord-stream-natural-gas-pipeline-highlights.html</guid>
<pubDate><![CDATA[Mon, 06 May 2013 01:00:00 EDT]]></pubDate>
<description><![CDATA[As subsea natural gas pipelines get longer and more remote, precommissioning requires increased integration into the overall project plan.]]></description>
</item>
<item>
<title><![CDATA[HEAVY OIL REFINING—2 (Conclusion): Analysis, appropriate steps can mitigate effects of coking fines]]></title>
<link><![CDATA[http://www.ogj.com/articles/print/volume-111/issue-02/processing/analysis-appropriate-steps-can-mitigate.html]]></link>
<guid>http://www.ogj.com/articles/print/volume-111/issue-02/processing/analysis-appropriate-steps-can-mitigate.html</guid>
<pubDate><![CDATA[Mon, 04 Feb 2013 01:00:00 EST]]></pubDate>
<description><![CDATA[This second, concluding article discusses the impact of fines in delayed-coker feedstocks and the steps that can improve reliability and profitability of the coking operation.]]></description>
</item>
<item>
<title><![CDATA[Focused-beam reflectance method aids hydrate blockage prediction]]></title>
<link><![CDATA[http://www.ogj.com/articles/print/volume-111/issue-1/transportation/focused-beam-reflectance-method-aids.html]]></link>
<guid>http://www.ogj.com/articles/print/volume-111/issue-1/transportation/focused-beam-reflectance-method-aids.html</guid>
<pubDate><![CDATA[Mon, 07 Jan 2013 01:00:00 EST]]></pubDate>
<description><![CDATA[Examining the variance of hydrate particle size with focused-beam reflectance measurements (FBRM) yields a clearer understanding of the microscopic mechanisms guiding hydrate formation and plugging, with the square-weighted chord length method emerging as capable of predicting hydrate plugging ...]]></description>
</item>
<item>
<title><![CDATA[Study improves control of slack line flow]]></title>
<link><![CDATA[http://www.ogj.com/articles/print/vol-110/issue-12/transportation/study-improves-control-of-slack-line-flow.html]]></link>
<guid>http://www.ogj.com/articles/print/vol-110/issue-12/transportation/study-improves-control-of-slack-line-flow.html</guid>
<pubDate><![CDATA[Mon, 03 Dec 2012 01:00:00 EST]]></pubDate>
<description><![CDATA[New research has improved control of slack line flow in steep slope liquids pipelines, whether during commissioning, steady operations, or in the wake of an accident.]]></description>
</item>
<item>
<title><![CDATA[The Tanzanian Ports Authority offloaded the first tanker to deliver through a new offshore single-point mooring installed by Leighton Offshore]]></title>
<link><![CDATA[http://www.ogj.com/articles/2012/11/tanzania-imports-first-diesel-through-single-point-mooring.html]]></link>
<guid>http://www.ogj.com/articles/2012/11/tanzania-imports-first-diesel-through-single-point-mooring.html</guid>
<pubDate><![CDATA[Wed, 21 Nov 2012 12:43:00 EST]]></pubDate>
<description><![CDATA[The Tanzanian Ports Authority offloaded the first tanker to deliver through a new offshore single-point mooring (SPM) installed by Leighton Offshore. The vessel offloaded diesel through the SPM in the southeastern portion of the Port of Dar Es Salaam.]]></description>
</item>
<item>
<title><![CDATA[OGJ Newsletter]]></title>
<link><![CDATA[http://www.ogj.com/articles/print/vol-110/issue-10/regular-features/ogj-newsletter.html]]></link>
<guid>http://www.ogj.com/articles/print/vol-110/issue-10/regular-features/ogj-newsletter.html</guid>
<pubDate><![CDATA[Mon, 01 Oct 2012 01:00:00 EDT]]></pubDate>
<description><![CDATA[International news for oil and gas professionals]]></description>
</item>
<item>
<title><![CDATA[DNO restarts West Bukha flow offshore Oman]]></title>
<link><![CDATA[http://www.ogj.com/articles/2012/09/dno-restarts-west-bukha-flow-offshore-oman.html]]></link>
<guid>http://www.ogj.com/articles/2012/09/dno-restarts-west-bukha-flow-offshore-oman.html</guid>
<pubDate><![CDATA[Fri, 07 Sep 2012 11:31:00 EDT]]></pubDate>
<description><![CDATA[DNO International ASA has restarted production at West Bukha oil field on Block 8 offshore Oman after repairing a blocked pipeline connecting the field with Bukha field.]]></description>
</item>
<item>
<title><![CDATA[GSPL India lets engineering contract for 2,000-km natural gas pipeline]]></title>
<link><![CDATA[http://www.ogj.com/articles/2012/08/gspl-india-lets-engineering-contract-for-2000km-natural-gas-pipeline.html]]></link>
<guid>http://www.ogj.com/articles/2012/08/gspl-india-lets-engineering-contract-for-2000km-natural-gas-pipeline.html</guid>
<pubDate><![CDATA[Mon, 06 Aug 2012 16:37:00 EDT]]></pubDate>
<description><![CDATA[GSPL India Transco Ltd. (GITL) has awarded an engineering, procurement, and project management contract to Engineers India Ltd (EIL) for the 2,000-km Mallavaram-Bhopal- Bhilwara-Vijaipur natural gas pipeline (MBBVPL) project.]]></description>
</item>
<item>
<title><![CDATA[DNO to replace flow line at West Bukha off Oman]]></title>
<link><![CDATA[http://www.ogj.com/articles/2012/07/dno-to-replace-flow-line-at-bukha-off-oman.html]]></link>
<guid>http://www.ogj.com/articles/2012/07/dno-to-replace-flow-line-at-bukha-off-oman.html</guid>
<pubDate><![CDATA[Wed, 18 Jul 2012 10:11:00 EDT]]></pubDate>
<description><![CDATA[DNO International ASA will replace a 4.3-km section of the 12-in. pipeline between the West Bukha and Bukha platforms offshore Oman after efforts to clear a blockage failed.]]></description>
</item>
<item>
<title><![CDATA[Pipe diameter does not affect black powder distribution, erosion]]></title>
<link><![CDATA[http://www.ogj.com/articles/print/vol-110/issue-07/transportation/pipe-diameter-does-not-affect.html]]></link>
<guid>http://www.ogj.com/articles/print/vol-110/issue-07/transportation/pipe-diameter-does-not-affect.html</guid>
<pubDate><![CDATA[Mon, 02 Jul 2012 01:00:00 EDT]]></pubDate>
<description><![CDATA[Pipe diameter seems to have no influence on black powder particles' velocity distribution in natural gas transmission pipelines operating at 10 m/sec and 20 m/sec, and there will be little, if any, particle-size segregation.]]></description>
</item>
</channel>
</rss>
