<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
<channel>
<title><![CDATA[RSS for Relief Well Being]]></title>
<description><![CDATA[Relief Well Being news and technical articles from Oil & Gas Journal. Search Relief Well Being latest and archived news and articles]]></description>
<link><![CDATA[http://www.ogj.com/topics/]]></link>
<atom:link xmlns:atom="http://www.w3.org/2005/Atom" type="application/rss+xml" rel="self" href="http://www.ogj.com/topics/urss?pageid=782055"/>
<item>
<title><![CDATA[BP to cut Macondo drill pipe; swap BOP]]></title>
<link><![CDATA[http://www.ogj.com/articles/print/volume-108/issue-33/general-interest/bp-to-cut-macondo.html]]></link>
<guid>http://www.ogj.com/articles/print/volume-108/issue-33/general-interest/bp-to-cut-macondo.html</guid>
<pubDate><![CDATA[Mon, 06 Sep 2010 01:00:00 EDT]]></pubDate>
<description><![CDATA[Choppy seas delayed BP PLC's plans to retrieve the Transocean Ltd.'s Deepwater Horizon semisubmersible blowout preventer (BOP) with two pieces of pipe inside it and to install another BOP.]]></description>
</item>
<item>
<title><![CDATA[BP hopes to remove capping stack on Sept. 2]]></title>
<link><![CDATA[http://www.ogj.com/articles/2010/09/bp-hopes-to-remove.html]]></link>
<guid>http://www.ogj.com/articles/2010/09/bp-hopes-to-remove.html</guid>
<pubDate><![CDATA[Wed, 01 Sep 2010 13:00:30 EDT]]></pubDate>
<description><![CDATA[BP PLC tentatively planned to remove a capping stack from the top of the Transocean Ltd.’s Deepwater Horizon semisubmersible blowout preventer on Sept. 2, pending the anticipated arrival of calmer seas in the Gulf of Mexico, a federal spokesman said.]]></description>
</item>
<item>
<title><![CDATA[Hydrates slow removal of pipe from Macondo well]]></title>
<link><![CDATA[http://www.ogj.com/articles/print/volume-108/issue-32/general-interest/hydrates-slow-removal.html]]></link>
<guid>http://www.ogj.com/articles/print/volume-108/issue-32/general-interest/hydrates-slow-removal.html</guid>
<pubDate><![CDATA[Mon, 30 Aug 2010 01:00:00 EDT]]></pubDate>
<description><![CDATA[BP PLC flushed hydrates from inside Transocean Ltd.'s Deepwater Horizon semisubmersible blowout preventer and a capping stack on the blown-out Macondo well in the Gulf of Mexico.]]></description>
</item>
<item>
<title><![CDATA[BP to cut Macondo drill pipe; swap BOP]]></title>
<link><![CDATA[http://www.ogj.com/articles/2010/08/bp-to-cut-macondo.html]]></link>
<guid>http://www.ogj.com/articles/2010/08/bp-to-cut-macondo.html</guid>
<pubDate><![CDATA[Fri, 27 Aug 2010 13:15:00 EDT]]></pubDate>
<description><![CDATA[BP PLC was unable to remove three pieces of pipe from the blown-out Macondo well in the Gulf of Mexico, and it now plans to retrieve the Transocean Ltd.’s Deepwater Horizon semisubmersible blowout preventer (BOP) with two pieces of pipe inside it.]]></description>
</item>
<item>
<title><![CDATA[Macondo pressure test due before relief well resumes]]></title>
<link><![CDATA[http://www.ogj.com/articles/print/volume-108/issue-30/general-interest/macondo-pressure-test.html]]></link>
<guid>http://www.ogj.com/articles/print/volume-108/issue-30/general-interest/macondo-pressure-test.html</guid>
<pubDate><![CDATA[Mon, 16 Aug 2010 01:00:00 EDT]]></pubDate>
<description><![CDATA[BP PLC planned another pressure test last week on the Macondo well in the Gulf of Mexico to gain more information about the condition of the annulus before penetration by a relief well.]]></description>
</item>
<item>
<title><![CDATA[Macondo relief well near target; static kill called effective]]></title>
<link><![CDATA[http://www.ogj.com/articles/2010/08/macondo-relief-well.html]]></link>
<guid>http://www.ogj.com/articles/2010/08/macondo-relief-well.html</guid>
<pubDate><![CDATA[Mon, 09 Aug 2010 12:06:00 EDT]]></pubDate>
<description><![CDATA[BP PLC, operator of the deepwater Macondo well in the Gulf of Mexico, said the first relief well was at 17,909 ft measured depth on Aug. 9.]]></description>
</item>
<item>
<title><![CDATA['Static kill' on Macondo well likely delayed to Aug. 3]]></title>
<link><![CDATA[http://www.ogj.com/articles/2010/07/-static-kill-on-macondo.html]]></link>
<guid>http://www.ogj.com/articles/2010/07/-static-kill-on-macondo.html</guid>
<pubDate><![CDATA[Fri, 30 Jul 2010 13:15:30 EDT]]></pubDate>
<description><![CDATA[BP PLC is cleaning some debris from the bottom of the first relief well being drilled to intercept the Macondo well, and the “static kill” probably will be delayed until Aug. 3, National Incident Commander and retired US Coast Guard Adm. Thad Allen said.]]></description>
</item>
<item>
<title><![CDATA[BP's first relief well 'perfectly positioned' from Macondo]]></title>
<link><![CDATA[http://www.ogj.com/articles/print/volume-108/issue-27/general-interest/bp-s-first-relief.html]]></link>
<guid>http://www.ogj.com/articles/print/volume-108/issue-27/general-interest/bp-s-first-relief.html</guid>
<pubDate><![CDATA[Mon, 26 Jul 2010 01:00:00 EDT]]></pubDate>
<description><![CDATA[An integrity test on the deepwater Macondo well in the Gulf of Mexico continued for several days as operator BP PLC and federal officials evaluated whether pressure readings might indicate reservoir depletion.]]></description>
</item>
<item>
<title><![CDATA[BP's first relief well 'perfectly positioned' from Macondo]]></title>
<link><![CDATA[http://www.ogj.com/articles/2010/07/bp-s-first-relief.html]]></link>
<guid>http://www.ogj.com/articles/2010/07/bp-s-first-relief.html</guid>
<pubDate><![CDATA[Tue, 20 Jul 2010 12:11:00 EDT]]></pubDate>
<description><![CDATA[BP PLC reported a pressure reading of 6,811 psi inside the top of the Macondo well as of July 19, while the first relief well, being drilled by the Development Driller III, has reached a casing point at 17,862 ft total depth.]]></description>
</item>
<item>
<title><![CDATA[Scientists, BP delay well integrity test for 24 hr]]></title>
<link><![CDATA[http://www.ogj.com/articles/print/volume-108/issue-26/general-interest/scientists--bp-delay.html]]></link>
<guid>http://www.ogj.com/articles/print/volume-108/issue-26/general-interest/scientists--bp-delay.html</guid>
<pubDate><![CDATA[Mon, 19 Jul 2010 01:00:00 EDT]]></pubDate>
<description><![CDATA[BP PLC and federal officials delayed an integrity test on the runaway Macondo well in the Gulf of Mexico for 24 hr, saying they needed time for analysis before trying to shut in the well on Mississippi Canyon Block 252.]]></description>
</item>
</channel>
</rss>
