Manifold news and technical articles from Oil & Gas Journal. Search Manifold latest and archived news and articles
Northeast Frigg field in the North Sea. Elf developed the field with a six wellhead subsea manifold and an articulated control tower placed 150 m away from the manifold . It shut down the field in May 1993 (OGJ, Mar. 20, p. 31). Elf plans to deballast
well project 170 miles southeast of New Orleans in Viosca Knoll Block 872. It will tie back to Shell's SE Tahoe subsea manifold in Viosca Knoll 784, which carries production 12 miles to Shell's Bud Lite platform. Steve Sears, manager of subsea development
Don Scott Enbridge Pipelines Inc. Edmonton A manifold array along a segment of Enbridge Pipelines' system is one of areas modeled in the company's CPM system. (Photograph from
Shell Deepwater Development Systems Inc. Houston Equations 221,894 bytes] Engineers planning to install a pipeline-end manifold (PLEM) as part of a deepwater flow line system must closely integrate design and installation procedures to ensure the equipment
field in more than 1,100 ft of water will be developed through the use of seven subsea wells tied back to a central gathering manifold . A pipeline will move the gas to an onshore facility. Enterprise Energy Ireland Ltd. opened the field in 1996 on Block 18
Amerada Hess's Ivanhoe and Rob Roy fields and Mobil North Sea's Beryl field in the U.K. North Sea. Planned are a new manifold and tie-in pipeline at St. Fergus gas plant and a 100 million ($160 million) expansion of Shell-Esso's Mossmorran
trend area from its Perdido development . The scope of the contract with FMC includes supply of eight subsea trees, a subsea manifold , topside and subsea controls, and associated equipment. Earlier this month, Shell announced a final investment decision
include construction of a compression station with 600 MMscfd of capacity, a new direct gathering manifold station, extension of two remote manifold stations, and tie-in of 32 new gas wells. Completion is scheduled by the third quarter of 2015
include construction of a compression station with 600 MMscfd of capacity, a new direct gathering manifold station, extension of two remote manifold stations, and tie-in of 32 new gas wells. Completion is scheduled by the third quarter of 2015
acceptance required three tree systems, manifold , flowlines, and a gas lift system ..... wells around a 12-slot production manifold . Two 11-in. production flowlines and a 6-in. test line link the manifold to a floating production, storage