High Pressure-High Temperature news and technical articles from Oil & Gas Journal. Search High Pressure-High Temperature latest and archived news and articles
Kennelly, BP PLC vice-president of technology for global projects, said BP is focused on developing high - pressure , high - temperature reservoirs. He said the effort, Project 20K, will involve "a new generation of equipment." Kennelly
Kennelly, BP PLC vice-president of technology for global projects, said BP is focused on developing high - pressure , high - temperature reservoirs. He said the effort, Project 20K , will involve “a new generation of equipment.” Kennelly
which would be half of the potential production from the area, Total said. Elgin and Franklin are high - pressure , high - temperature gas and condensate fields in the North Sea's Central Graben area. Total E&P UK owns 46.17% and
available to any fields which met the designated criteria. They, like the allowances introduced in 2009 for high pressure - high temperature (HPHT) and heavy oil projects, are a way of addressing through the tax regime the high upfront capital
finds offshore Sarawak, one of which is the company's deepest vertical well and its first completed high - pressure high - temperature well. Petronas Carigali drilled Tukau Timur Deep-1 to a record 4,830 m on the SK307 block and discovered
resources." BP and Maersk will collaborate on concepts for deepwater drilling rigs that can operate in high - pressure , high - temperature reservoirs up to 20,000 psi and 350° F. BP said current equipment has a technical limit of 15,000
resources.” BP and Maersk will collaborate on concepts for deepwater drilling rigs that can operate in high - pressure , high - temperature reservoirs up to 20,000 psi and 350° F. BP said current equipment has a technical limit of 15,000
point where pressure design limits prevented further drilling to the main objective. Jaguar-1 is a high - pressure , high - temperature well spudded in February 2012 using the Atwood Beacon jack up. While the primary Late Cretaceous objective
point where pressure design limits prevented further drilling to the main objective. Jaguar-1 is a high - pressure , high - temperature well spudded in February using the Atwood Beacon jack up. While the primary Late Cretaceous objective
Republic 40% and GDF Suez 20%. Statoil, Total discover gas-condensate near Ekofisk Statoil ASA said a high - pressure high - temperature gas-condensate discovery on its King Lear prospect in the southern part of the Norwegian North Sea has