Home>Topics>Electric Submersible Pump
  1. All
  2. Magazine Articles
  3. Online Articles
  4. Video

Electric Submersible Pump

Electric Submersible Pump news and technical articles from Oil & Gas Journal. Search Electric Submersible Pump latest and archived news and articles

  1. Atrush field eastern extension gauged in Iraq Kurdistan

    Online Articles

    Tue, 27 Aug 2013

    1 was a short test over an 18-m interval in the uppermost porosity section of the Butmah formation. On an electric submersible pump the well produced 1,500 b/d of water with 1-6% viscous oil cut. The test indicates that the tested interval

  2. PetroMagdalena tests Llanos basin oil discovery

    Online Articles

    Tue, 28 Feb 2012

    1ST well which produced 530 b/d of 23.9° gravity oil in 5 hr with 30% basic sediment and water on an electric submersible pump . The well encountered 12 ft of net pay in Upper Guadalupe with 24% porosity and 50% oil saturation and 13

  3. Ecopetrol has fourth Cano Sur heavy oil discovery

    Online Articles

    Mon, 12 Sep 2011

    Colombia. A deviated wellbore allowed the well to contact thicker net pay, Ecopetrol said. The company used an electric submersible pump for the test. TD is 4,594 ft. It is the fourth discovery in 2011 on the block 100% owned by Ecopetrol after

  4. Exploration/Development Briefs

    Magazine Articles

    Mon, 24 Sep 2012

    participating interest in the Los Ocarros block. Las Maracas-4 is contributing 1,500 b/d of oil on an electric submersible pump , and its oil rate is expected to increase in a week as the company eliminates site congestion caused by arrival

  5. Amerisur tests strong Putumayo development well

    Online Articles

    Tue, 12 Jun 2012

    will install a permanent completion string and commence commercial production. Given the well’s high rate, Amerisur is evaluating completion options to maximize efficiency, including the installation of an electric submersible pump .

  6. UK: Kraken appraisal has oil in Heimdal III sandstone

    Online Articles

    Thu, 11 Aug 2011

    Nautical Petroleum said. The sidetrack is to take 40 days and be completed with a gravel pack and tested on an electric submersible pump . The sidetrack aims to prove a commercial flow rate on contingent resources of 83 million bbl of oil net to

  7. OGJ Newsletter

    Magazine Articles

    Mon, 16 Jul 2012

    Llanos 34 block is testing 1,220 b/d of 15° gravity oil with 18% BS&W from the Guadalupe formation on an electric submersible pump . More tests are needed to determine expected and stabilized production rates. GeoPark operates the block with

  8. Tecpetrol, PetroNova make Llanos heavy oil find

    Online Articles

    Wed, 25 Jul 2012

    20% working interest. Total depth is 3,265 ft. The well could yield higher volumes if equipped with an electric submersible pump , PetroNova said. It is to be completed in the top of the basal Carbonera sand unit and an extended production

  9. GeoPark has Guadalupe oil find on Llanos 34 block

    Online Articles

    Mon, 17 Jun 2013

    45% working interest. The well produced 2,239 b/d of 15.5° gravity oil with 0.6% water cut on an electric submersible pump with 250 psi wellhead pressure on a 14.3-mm choke from the Guadalupe formation at 2,955 m. Total depth

  10. Miller restarting Redoubt Shoal wells at higher oil rates

    Online Articles

    Mon, 15 Jul 2013

    weeks on production from the initial 24-hr rate of 1,281 bbl of oil and 19% water cut with no adjustment of electric submersible pump speed, the company noted. The first 3 weeks of production data and bottomhole flowing pressure for RU-2A

Stay Connected