Home>Topics>Electric Submersible Pump
  1. All
  2. Video
  3. Magazine Articles
  4. Online Articles

Electric Submersible Pump

Electric Submersible Pump news and technical articles from Oil & Gas Journal. Search Electric Submersible Pump latest and archived news and articles

  1. Texas-West: Horizontal Clearfork shale results promising

    Online Articles

    Mon, 4 Nov 2013

    8 million, with 30 frac stages using a slickwater stimulation technique and is currently producing on an electric submersible pump . “Further testing will be required to validate reserve estimates, but the results so far are encouraging

  2. Ecopetrol tests Meta Province heavy oil discovery

    Online Articles

    Tue, 2 Apr 2013

    block 90 miles south-southeast of Bogota, produced 630 b/d of 17° gravity oil with a 39% water cut on an electric submersible pump . Ecopetrol, which holds a 100% interest in the block, plans to continue its exploratory efforts there in

  3. GeoPark has Guadalupe oil find on Llanos 34 block

    Online Articles

    Mon, 17 Jun 2013

    45% working interest. The well produced 2,239 b/d of 15.5° gravity oil with 0.6% water cut on an electric submersible pump with 250 psi wellhead pressure on a 14.3-mm choke from the Guadalupe formation at 2,955 m. Total depth

  4. Miller restarting Redoubt Shoal wells at higher oil rates

    Online Articles

    Mon, 15 Jul 2013

    weeks on production from the initial 24-hr rate of 1,281 bbl of oil and 19% water cut with no adjustment of electric submersible pump speed, the company noted. The first 3 weeks of production data and bottomhole flowing pressure for RU-2A

  5. Colombia: GeoPark adds oil wells on Llanos blocks

    Online Articles

    Wed, 27 Mar 2013

    gravity oil with less than 1% water cut with 70 psi wellhead pressure on a 19-mm choke on test with an electric submersible pump from the Guadalupe formation. More tests are needed to determine stabilized flow rates and reservoir extent

  6. OGJ Newsletter

    Magazine Articles

    Mon, 8 Apr 2013

    block 90 miles south-southeast of Bogota, produced 630 b/d of 17° gravity oil with a 39% water cut on an electric submersible pump . Ecopetrol, which holds a 100% interest in the block, plans to continue its exploratory efforts there

  7. Exploration/Development Briefs

    Magazine Articles

    Mon, 8 Apr 2013

    gravity oil with less than 1% water cut with 70 psi wellhead pressure on a 19-mm choke on test with an electric submersible pump from the Guadalupe formation. More tests are needed to determine stabilized flow rates and reservoir extent

  8. OGJ Newsletter

    Magazine Articles

    Mon, 19 Aug 2013

    oil upon recompletion in the Mirador formation. The majority of the production test was conducted using an electric submersible pump and an open choke with 14% drawdown. The well also produced a 30% water cut. For the last 6.5 hr that

  9. OGJ Newsletter

    Magazine Articles

    Mon, 24 Jun 2013

    working interest. The well produced 2,239 b/d of 15.5° gravity oil with 0.6% water cut on an electric submersible pump with 250 psi wellhead pressure on a 14.3-mm choke from the Guadalupe formation at 2,955 m. Total depth

  10. Firms eye Guatemala oil potential at Atzam, Tortugas fields

    Online Articles

    Tue, 12 Feb 2013

    gravity oil from the Upper C18-Lower C-17 reservoirs for the 2 weeks ended Feb. 13 and plans to run an electric submersible pump in 2-3 weeks. However, Citation said, minimal fluids were recovered from the C19-Lower C18 reservoirs

Stay Connected