Home>Topics>Electric Submersible Pump
  1. All
  2. Video
  3. Magazine Articles
  4. Online Articles

Electric Submersible Pump

Electric Submersible Pump news and technical articles from Oil & Gas Journal. Search Electric Submersible Pump latest and archived news and articles

  1. Ecopetrol tests Meta Province heavy oil discovery

    Online Articles

    Tue, 2 Apr 2013

    block 90 miles south-southeast of Bogota, produced 630 b/d of 17° gravity oil with a 39% water cut on an electric submersible pump . Ecopetrol, which holds a 100% interest in the block, plans to continue its exploratory efforts there in

  2. GeoPark has Guadalupe oil find on Llanos 34 block

    Online Articles

    Mon, 17 Jun 2013

    45% working interest. The well produced 2,239 b/d of 15.5° gravity oil with 0.6% water cut on an electric submersible pump with 250 psi wellhead pressure on a 14.3-mm choke from the Guadalupe formation at 2,955 m. Total depth

  3. Miller restarting Redoubt Shoal wells at higher oil rates

    Online Articles

    Mon, 15 Jul 2013

    weeks on production from the initial 24-hr rate of 1,281 bbl of oil and 19% water cut with no adjustment of electric submersible pump speed, the company noted. The first 3 weeks of production data and bottomhole flowing pressure for RU-2A

  4. Colombia: GeoPark adds oil wells on Llanos blocks

    Online Articles

    Wed, 27 Mar 2013

    gravity oil with less than 1% water cut with 70 psi wellhead pressure on a 19-mm choke on test with an electric submersible pump from the Guadalupe formation. More tests are needed to determine stabilized flow rates and reservoir extent

  5. OGJ Newsletter

    Magazine Articles

    Mon, 8 Apr 2013

    block 90 miles south-southeast of Bogota, produced 630 b/d of 17° gravity oil with a 39% water cut on an electric submersible pump . Ecopetrol, which holds a 100% interest in the block, plans to continue its exploratory efforts there

  6. Exploration/Development Briefs

    Magazine Articles

    Mon, 8 Apr 2013

    gravity oil with less than 1% water cut with 70 psi wellhead pressure on a 19-mm choke on test with an electric submersible pump from the Guadalupe formation. More tests are needed to determine stabilized flow rates and reservoir extent

  7. OGJ Newsletter

    Magazine Articles

    Mon, 19 Aug 2013

    oil upon recompletion in the Mirador formation. The majority of the production test was conducted using an electric submersible pump and an open choke with 14% drawdown. The well also produced a 30% water cut. For the last 6.5 hr that

  8. OGJ Newsletter

    Magazine Articles

    Mon, 24 Jun 2013

    working interest. The well produced 2,239 b/d of 15.5° gravity oil with 0.6% water cut on an electric submersible pump with 250 psi wellhead pressure on a 14.3-mm choke from the Guadalupe formation at 2,955 m. Total depth

  9. Colombia: Oil output building at Las Maracas field

    Online Articles

    Tue, 18 Sep 2012

    participating interest in the Los Ocarros block. Las Maracas-4 is contributing 1,500 b/d of oil on an electric submersible pump , and its oil rate is expected to increase in a week as the company eliminates site congestion caused by arrival

  10. Petrominerales has two-zone Ucayali light oil find

    Online Articles

    Wed, 24 Oct 2012

    without water. A 10-ft Chonta perforated interval yielded 2,235 bbl of 53° gravity oil in 37.5 hr on an electric submersible pump with solution gas too small to measure. Drawdown at the test’s end was 50%. More drilling, testing

Stay Connected