1455 West Loop South
Houston, Texas 77027
(713) 621-9720
Copyright © 2010: PennWell Corporation
All Rights Reserved.
Houston, Texas 77027
(713) 621-9720
Copyright © 2010: PennWell Corporation
All Rights Reserved.
Electric Submersible Pump news and technical articles from Oil & Gas Journal. Search Electric Submersible Pump latest and archived news and articles
R. has been reversed with the first Soviet investment in a western oil field supply business. Almetyevsk Electric Submersible Pump Plant (Alnas), based in the Romashkino oil basin, has formed a 50-50 joint venture with Ramco Oil Services
Automation in Salym field of western Siberia has reduced operator travel and hazard exposure, reduced interruption in electric submersible pump operations, and provided more stable operations and faster restarts.
Extensive qualification and testing proved out the electric submersible pump (ESP) installed downhole in the JUB-6 well in Jubarte field off Brazil.
An electric submersible pump (ESP) test, although shorter than hoped for, indicated that artificial lift with ESPs had potential for replacing gas-lift operations, offshore Mexico. Petr?leos Mexicanos (Pemex) recently preformed this test of a high-volume (10,000 b/d) ESP in the Akal reservoir of ...
test rates are not necessarily indicative of long-term production rates. P1 plans to install a high volume electric submersible pump before releasing the drilling rig to spud Samaria Norte-1, the second of two commitment exploratory wells
1ST well which produced 530 b/d of 23.9° gravity oil in 5 hr with 30% basic sediment and water on an electric submersible pump . The well encountered 12 ft of net pay in Upper Guadalupe with 24% porosity and 50% oil saturation and 13
1ST well which produced 530 b/d of 23.9° gravity oil in 5 hr with 30% basic sediment and water on an electric submersible pump . The well encountered 12 ft of net pay in Upper Guadalupe with 24% porosity and 50% oil saturation and 13
ratio of 170 scf/stb. The well was produced through a separator under artificial lift by means of a downhole electric submersible pump . The producing wellhead temperature was 62° C., sharply higher than that achieved during the test of well
Nautical Petroleum said. The sidetrack is to take 40 days and be completed with a gravel pack and tested on an electric submersible pump . The sidetrack aims to prove a commercial flow rate on contingent resources of 83 million bbl of oil net to
Colombia. A deviated wellbore allowed the well to contact thicker net pay, Ecopetrol said. The company used an electric submersible pump for the test. TD is 4,594 ft. It is the fourth discovery in 2011 on the block 100% owned by Ecopetrol after