1455 West Loop South
Houston, Texas 77027
(713) 621-9720
Copyright © 2010: PennWell Corporation
All Rights Reserved.
Houston, Texas 77027
(713) 621-9720
Copyright © 2010: PennWell Corporation
All Rights Reserved.
Drillstem news and technical articles from Oil & Gas Journal. Search Drillstem latest and archived news and articles
584 b/d of oil from three zones at the deepened Simrit-2 well in the Kurdistan Region of Iraq with nine more zones to be drillstem tested. Afren PLC, which has a 20% interest in the Ain Sifni PSC, said the well has been drilled to 3,800 m and encountered
HRT Participacoes em Petroleo SA, Rio de Janeiro, said a subsidiary has drillstem tested a well in the Solimoes basin at a flow rate the company said is one of the best in onshore Brazil. The 1-HRT-9-AM
Vietnam has flowed oil at high rates on a drillstem test. The TGT-5X well, drilled to ..... Hoang Long Co. PTT E&P said a second drillstem test, in progress at the time of the ..... initial flow rate of 7,300 b/d. Drillstem test flows of other appraisal wells on
Ltd. and its partners will carry out a drillstem test on the Upper Jurassic Fulmar sand ..... consortium has found oil in multiple zones and drillstem testing will move through 101 ft of perforations ..... company said. The partners will also drillstem test the Paleocene Forties interval after
reported gas and condensate flowed during a drillstem test on the Te Giac Den 1X sidetrack ..... completion of the first of two scheduled drillstem tests, Soco International said June ..... well is being prepared for the second drillstem test above a volcanic layer, which is
HOUSTON, May 7 – Primeline Energy Holdings Inc. plans to drillstem test potential reservoir zones at the Lishui 35-3-1 exploration ..... sidewall coring before setting the 9-5/8-in. casing. Drillstem testing will begin 7-8 days after casing is set. Lishui
HOUSTON, Dec. 2 -- Hess Corp.’s Libyan subsidiary has drillstem -tested gas and condensate at a discovery well it drilled ..... and 533 b/d of condensate on a 52/64-in. choke on a drillstem test. After completing tests, the Stena Forth sixth-generation
s Parnaiba onshore basin supported a 20-m gas flare on drillstem test. The flow came at the 1-OGX-22-MA well at the ..... section with good gas shows, at a depth of 1,520 m, a drillstem test resulted in 1,950 psi wellhead pressure with the 20
A drillstem test of 8 m of new pay in the Carboniferous Jurua formation in the 1-HRT-4-AM well in the Solimoes basin in Brazil indicated
HRT Oil & Gas drillstem tested subcommercial amounts of 41° gravity oil at the 1-HRT-6-AM well on Block SOL-T-170 in the Solimoes basin in