Home>Topics>Christmas Tree
  1. All
  2. Magazine Articles
  3. Online Articles

Christmas Tree

Christmas Tree news and technical articles from Oil & Gas Journal. Search Christmas Tree latest and archived news and articles

  1. Shell’s experience with a Norwegian semisubmersible

    Magazine Articles

    Mon, 11 Aug 2008

    and within budget with difficult rig limitations. For instance, the work required custom-built skids to move the christmas tree and flow base on the rig. SWIT The Ocean Vanguard reequipped from drilling to seabed-based water injection and

  2. ESTIMATING DRILLING COSTS-1: Joint association survey, mechanical risk index methods common in GOM

    Magazine Articles

    Mon, 6 Aug 2007

    the cost through completion and installation of the Christmas tree . Completion costs will typically include the cost ..... metric. A subsea well is one in which the wellhead, Christmas tree , and production-control equipment are located on

  3. GULF UPDATE—1: Gulf of Mexico P&A costs begin to recover from 2005 hurricanes

    Magazine Articles

    Mon, 3 Dec 2007

    MMS provides specific regulations for each operation. • Shut in. A shut-in well is a flowing well that has its christmas tree , master valves, wing valves, and subsea safety value closed. A well is usually shut in because of temporary technical

  4. TECHNOLOGY Wellhead and tree standards updated

    Magazine Articles

    Mon, 11 Mar 1996

    scope and coverage of wellhead and christmas tree equipment. The 17th Edition ..... requirements for wellhead and christmas tree equipment. The design, materials ..... standardization of wellhead and christmas tree equipment. Unfortunately, these

  5. 'Delivering The Limit' Work-Flow Process Advances Industry's Push For Continuous Performance Improvement In Well Operations

    Magazine Articles

    Mon, 6 Mar 2000

    achieve this, for example, in christmas tree installation; and challenging ..... performed after installation of the christmas tree . Capture real-time operational ..... different times needed to achieve christmas tree installation across the NBU platforms

  6. CNOOC outlines procedures for ERD program

    Magazine Articles

    Mon, 8 Aug 2005

    and moved the cap of the subsea christmas tree . It was necessary to cut and retrieve the ..... they ran and tested the subsea christmas tree ; reran the riser and BOP stack, and finally tested the ..... They installed the cap of the christmas tree and started up the ESP unit to

  7. STANDARDIZED WELLHEADS PROVEN ECONOMICAL FOR SUBSEA OPERATIONS

    Magazine Articles

    Mon, 2 May 1994

    purchase and installation of the christmas tree and the flow lines until installation ..... plugs in the tubing hanger and Christmas tree reentry mandrel for both production ..... flexible flow line end-fittings and Christmas tree flow loops The tops of tubing

  8. Water depth production record set off Brazil

    Magazine Articles

    Mon, 29 Sep 1997

    taken included modifying the wet christmas tree , flexible lines, and control ..... semisubmersible rigs would run the wet christmas tree . This rule is based on environmental ..... could be very critical if the wet christmas tree had to be run during harsh weather

  9. Erosion monitoring manages sand production

    Magazine Articles

    Mon, 28 Sep 1998

    line system mounted on a subsea christmas tree will verify and quantify the sand ..... the subsea control module on the christmas tree . Here the signals are compressed ..... module (SCM) on the respective christmas tree . The data are subsequently divided

  10. Incoming IOGCC chairman will focus on technology

    Magazine Articles

    Mon, 23 May 2005

    move gas well in the Lower 48 states. Unfortunately, as each of these bills goes through, it turns into a kind of Christmas tree with an ornament here and an ornament there for special interests.” Energy-producing states can do several things

Stay Connected