More Drilling Operations News

BHI: US drilling rig count unchanged for second straight week

Sep 26, 2014

For a second consecutive week the US drilling rig count was unchanged at 1,931 rigs working during the week ended Sept. 26, Baker Hughes Inc. reported.

BHI: US drilling rig count holds steady at 1,931

Sep 19, 2014

The US drilling rig count was unchanged at 1,931 rigs working during the week ended Sept. 19, Baker Hughes Inc. reported.

Senate adopts bill making BLM drilling permit pilot program permanent

Sep 17, 2014

The US Senate approved Tom Udall (D-NM) and John Barrasso’s (R-Wyo.) bill permanently extending a US Bureau of Land Management drilling permit processing improvement pilot program that was established under the 2005 Energy Policy Act. It was scheduled to expire in 2015.

Statoil to suspend second semi off Norway

Sep 17, 2014

Statoil ASA will lay up a second semisubmersible drilling rig that it says exceeds the needs of its current program offshore Norway.

Punitive regs would harm Pennsylvania, PIOGA president says

Sep 15, 2014

A severance tax and other election-year proposals potentially could dismantle Pennsylvania's unprecedented natural gas production growth, the Pennsylvania Independent Oil & Gas Association's president warned.

BHI: US rig count continues upward trend, reaches 1,931 units

Sep 12, 2014

The US drilling rig count increased 6 units to reach 1,931 rigs working during the week ended Sept. 12, Baker Hughes Inc. reported.

WHL could take on stand-alone gas development in Otway basin

Sep 9, 2014

WHL Energy Ltd., Perth, has raised the possibility of a stand-alone gas development in its Otway basin acreage offshore Victoria.

Drilling begins on Manora oil development offshore Thailand

Sep 5, 2014

A joint venture led by Mubadala Petroleum, Abu Dhabi, has spudded the first of 15 planned development wells in the Manora oil development in the northern Gulf of Thailand.

BHI: US rig count posts double-digit gain for second straight week

Sep 5, 2014

The US drilling rig count gained 11 units to reach 1,925 rigs working during the week ended Sept. 5, Baker Hughes Inc. reported.

Consortium starts drilling UK Horse Hill oil well

Sep 3, 2014

Horse Hill Developments Ltd., a London joint venture, spudded the Horse Hill-1 oil well after a series of weather delays for Surrey field, which is part of petroleum exploration and development license 137. Several consortium partners confirmed drilling has started.

Gazprom Neft starts exploratory drilling in Iraq's Kurdistan region

Sep 1, 2014

JSC Gazprom Neft has commenced with exploratory drilling on the Shakal block in the southwest part of Iraq's Kurdistan region.

BLM announces California oil, gas strategy as CCST issues report

Aug 29, 2014

The US Bureau of Land Management’s California state office announced a comprehensive strategy for its oil and gas program in the state after receiving an independent review of well stimulation technologies it asked the California Council on Science and Technology (CCST) to conduct in September 2013.

BHI: US rig count recoups last week’s losses, jumps to 1,914

Aug 29, 2014

The US drilling rig count jumped 18 units to reach 1,914 rigs working, gaining back the 17 units it lost last week plus one, during the week ended Aug. 29, Baker Hughes Inc. reported.

Fitch: Drilling downturn might prompt some consolidation

Aug 28, 2014

A cyclical downturn in offshore drilling might provide an opportunity for driller contractors having financial flexibility to buy their peers at favorable prices, Fitch Ratings of Chicago said in a recent research note, adding that master limited partnerships (MLPs) in particular can provide financial flexibility.

Statoil: Aasta Hansteen gas development on schedule for 2017

Aug 26, 2014

The Aasta Hansteen gas development in the northern Norwegian Sea is on schedule for production start-up in third quarter 2017, reported operator Statoil ASA.

Market Connection

process units at aruba

FOR SALE:Process Units at Aruba

Coker Unit For Sale: Unused equipment from cancelled Coker Project for Sale, stored US Gulf Coast. Accessible to water transport. Rating: Feed rate...
Coker Unit For Sale: Unused equipment from cancelled Coker Project for Sale, stored US Gulf Coast. Accessible to water transport. Rating: Feed rate 45,000 BPD, Production: 2,500 short tons per day. Two drums 29’diameter each, chrome steel, stainless lined. Fractionator is 16’ dia x 110’ partially stainless lined. Additional Oil Refinery Process Units Available: Crude Units, Hydrotreaters, Sulfur Recovery Units, Visbreaker Hydrogen plants and twonew  coke drums, unused, stored west coast. Contact: carlvalentino21@gmail.com , 832.723.7545

Coker Unit For Sale

Coker Unit For Sale: Unused equipment from cancelled Coker Project for Sale, stored US Gulf Coast. Accessible to water transport. Rating: Feed rate...
sulphur recovery unit

FOR SALE: Sulphur Recovery Unit

For Sale: Sulphur Recovery Unit F/E 3,074 sf ea. 2,130 psi shell, 347ss 1,955 psi tubes, 321 ss, UNUSED $300,000 each, SRU 48TPD w/Tail Gas Treater...
mac-weld machinery

MAC-WELD Machining Ltd.

MAC-WELD Machining Ltd. Thermowells, Instrument Valves, Level Chambers, Orifice Plates, Bleed/Flush Rings. Over 35 years of instrumentation hardwa...
Proco

Proco Products: Your Expansion Joint Source for Mud Tanks, Frac Tanks, Shale Shakers

Proco Products, Inc. is a global leader in the design and supply of piping/ducting system expansion joints and rubber check valves. We offer the mo...

Oil & Gas Conferences

There is no current content available.
Stay Connected