Map from South Bow Corp.
Keystone pipeline system map
April 16, 2025
South Bow has restarted the Keystone pipeline after receiving regulatory approval from the Pipeline and Hazardous Materials Safety Administration.

Latest Pipelines

More from Pipelines

April 9, 2025
South Bow has isolated and contained an oil release on the Keystone Pipeline in North Dakota.
April 8, 2025
For the first time, natural gas produced in Argentina has been exported to the Brazilian market via Bolivia.
April 3, 2025
Final investment decision was taken to proceed with the bi-directional pipeline designed to transport up to 1.75 bcfd of natural gas through about 160 miles of 36-in. OD pipeline...
April 1, 2025
Williams has commissioned two fully contracted expansion projects related to its Transco natural gas pipeline, namely the Southeast Energy Connector in Alabama, and the Texas ...
March 28, 2025
On Mar. 13, 2025, a rupture occurred along a section of Ecuador’s state-owned Sistema de Oleoducto Transecuatoriano near El Vergel, releasing an estimated 25,116 bbl of crude ...