RELATED FUELS-WORLDWIDE CONSTRUCTION

Oct. 28, 1991
*Designates projects listed for the first time in the Journal. *AIR PRODUCT & CHEMICALS. Cincinnati, Ohio. 2.3 MMscfd hydrogen plant in the engineering stage. Contr: Howe-Baker. Completion: 1992. AMCOAL (MW Kellogg and Bechtel development). Quemahoning Indus. Park, Johnstown, Somerset County, Pa' Coal gasification plant processing 485 t/d high sulfur coal. When completed the plant will generate 60 mgw electricity. Completion: 1991. *ASHLAND PETROLEUM Co. Catlettsburg, Ky. 10 MMscfd

*Designates projects listed for the first time in the Journal.

UNITED STATES

*AIR PRODUCT & CHEMICALS. Cincinnati, Ohio. 2.3 MMscfd hydrogen plant in the engineering stage. Contr: Howe-Baker. Completion: 1992.

AMCOAL (MW Kellogg and Bechtel development). Quemahoning Indus. Park, Johnstown, Somerset County, Pa' Coal gasification plant processing 485 t/d high sulfur coal. When completed the plant will generate 60 mgw electricity. Completion: 1991.

*ASHLAND PETROLEUM Co. Catlettsburg, Ky. 10 MMscfd hydrogen plant in the engineering stage. Contr: HoweBaker. Completion: 1993.

CHAMBERS COGENERATION LP. Carney's Point, N.J. two 140,000 kw pulverized coal fired steam generators. Contr: Foster Wheeler. Completion: Summer 1993.

CHEVRON USA Inc. Richmond, Calif. 99 mw waste gas fueled cogeneration plant. Engr: Bechtel. Completion: Dec. 1992.

DEPARTMENT OF ENERGY. Pittsburgh, Pa. *Coal liquefaction complex in the engineering stage. Engr/Contr: Kellogg. Completion: 1993.

*DESTEC ENERGY Inc. Green Bay, Wisc. 260,000 kw gas fired cogeneration plant. $200 MM. Completion: 1995.

ENCOAL. Gilette, Wyo. 1,000 t/d coal gasification plant under construction. Contr: Kellogg. Lic: SGI Inter. Completion: 1992.

*ERGON REFINING, Inc. Vicksburg, Miss. 5.5 MMscfd hydrogen plant in the engineering stage. Contr: Howe-Baker. Completion: 1992.

EXXON Co. U.S.A. Benicia, Calif. 49,000 kw cogeneration plant.

INDIANA FARM BUREAU. Mt. Vernon, Ind. 9,000 b/d diesel desulfurizer expansion in the engineering stage. Contr: Howe-Baker Engr. Inc. Completion: 1993.

OHIO ONTARIO CLEAN FUELS Inc. Warren, Ohio 12,280 b/d coal to liquid fuel (using catalytic process to liquefy crushed and ground coal). Design: HRI. Engr: Stone & Webster. $225 MM. Completion: 1995.

OLD DOMINION ELECTRIC COOPERATIVE. Richmond, Va. 393,000 kw pulverized coal fired power plant. Contr: Westinghouse/Combustion Engineering/H.B. Zachry/Black & Veatch. Completion: 1993.

SALT CITY ENERGY VENTURE. Solvay, N.Y. Conversion of a direct coal fired power plant. 80,000 kw of electricity and 40,000 lb/hr of process steam. Engr: Duke/Fluor Corp. $78 MM.

SOUTH CAROLINA ELECTRIC & GAS Co. Orangeburg, S.C. 385 mw coal fired power plant under construction. Contr: Fluor Daniel. Completion: 1996.

TENNESSEE EASTMAN. Kingsport, Tenn. Coal gasification expansion under construction. Contr: Bechtel. Completion: 1991.

10 MMscfd acid gas removal & cryogenic separation expansion in the engineering stage. Process Design: Linde. Completion: 1991.

TEXACO R&M. Anacortes, Wash. (partnership with Mission Energy) 80 mw Cogeneration plant. Completion: Nov. 1991.

CANADA

BP CANADA & PETRO-CANADA. Wolf Lake, Alta. 15,000 b/d bitumen expansion from tar sands. Completion: 1991.

*DU PONT CANADA Inc. Brockville, Ont. gas fired congeneration plant. $37 MM.

ESSO RESOURCES CANADA Ltd. (OSLO project). Fort McMurray, Alta. (Consortium members: Esso (25%); Canadian Occidental Petroleum Ltd. (20%); Gulf Canada Resources Ltd. (20%); Petro-Canada (15%); PanCanadian Petroleum Ltd. (10%); and Alberta Oil Sands

Equity (10%)). 77,000 b/d from oil sands. Basic engineering and site preparation studies proceeding. $3.5 billion. Completion: 1996.

HUSKY OIL OPERATIONS Ltd. Lloydminster, Sask. 46,000 b/d heavy oil upgrader under construction. $1.2 billion. Hydrocracker (HRI); delayed coker and hydrogen plant (FW/SNC); primary upgrader plant (PCL/Braun/Simons); sulfur recovery (Monenco); crude plant and secondary upgrader (Bantrel). Completion: 1992.

SUNCOR. Fort McMurray.

75,000 b/d expansion (125,000 b/d total cap.) from oil sands. $2 billion. Seeking investors.

18,000 b/d crude expansion from oil sands (71,000 b/d total capacity). $50 MM. Completion: 1991.

CHINA

BEIJING COKING & CHEMICAL WORKS. Biejing. 66 MMcfd coal gasification plant under construction.

JINCHANG GAS CY. Jinchang, Ganshu. 4.6 MMcfd coal gasification plant under construction.

QINHUANGDAO COAL. Qhd.

10.6 MMcfd coal gasification plant under construction.

SHOUDU IRON & STEEL Co. Beijing. 1.1 mt/d coal gasification plant under construction.

SHOUGANG. Beijing. 1,000 mt/d coal gasification plant in engineering stage. Contr: CTIP. Completion: 1991.

YANRI CWM Co. Shandong. 250,000 mt/y coal water mixture in the engineering stage. Contr: JGC Corp. Completion: 1992.

INDONESIA

AIR PRODUCTS & CHEMICAL. W. Java. .36 MMscfd hydrogen plant in the engineering stage. Contr: Howe-Baker Engr. Inc. Completion: 1992.

ITALY

ENICHEM/ANIC SpA. Porto Torres. 500,000 mt/y high concentration coal slurry reocarb unit under construction. Engr/Contr: Snamprogetti. Completion: 1992.

MALAYSIA

AIR PRODUCTS & CHEMICALS. Kuantan. 2.57MM scfd hydrogen plant in the engineering stage. Contr: Howe-Baker. Completion: 1992.

NETHERLANDS

DEMKOLEC. Buggenum.

250 mgw power-from-coal-gas demo project in the engineering stage. Design: Comprimo. Engr: Lummus Crest. Completion: 1993.

SPAIN

REPSOL PETROLEO SA. Puertollano & Tarragona. three 38,000 kw cogeneration units. Completion: 1992.

Cartagena. two 38,000 kw cogeneration units. Completion: 1993.

Somorrostro. two 38,000 kw cogeneration units. Completion: 1992.

UNITED KINGDOM

BRITISH GAS plc. Westfield, Scotland. New coal briquetting plant under construction. Contr: Babcock.

VENEZUELA

QUIMICA OXAL, CA. Caracas. 6.7 MMcf/d syngas and 2.3 MMcf/d hydrogen plant in the engineering stage. Contr: HoweBaker. Completion: 1992.

TECNOCONSULT SA. Cardon $130 million replacement cogeneration power plant operated by Maraven SA. Engr: Raytheon.