ConocoPhillips lets contract for Greater Ekofisk platform
By OGJ editors
HOUSTON, Nov. 8 -- ConocoPhillips has awarded the front-end engineering and design for its Greater Ekofisk area development's 2/4 Z wellhead platform in the Norwegian North Sea to two John Wood Group PLC companies, Mustang Engineering and JP Kenny.
Mustang will design the 7,400-tonne jacket and topsides for the 40-slot wellhead platform, which will be installed in 70-75 m of water.
JP Kenny will provide design services for subsea flow lines and pipelines across the Greater Ekofisk area, "building upon a prior contract to provide services associated with the subsea water injection," John Wood Group reported.
The FEED project is expected to be complete by yearend 2009.