Production starts up of third development phase in Qatar's Al Khalij field

Sept. 20, 2004
Total SA reported the start up of the third phase of development of Al Khalij oil field off Qatar.

By OGJ editors
HOUSTON, Sept. 20 -- Total SA reported the start up of the third phase of development of Al Khalij oil field off Qatar. Also, Total has brought on stream a water separation and treatment platform.

Production from the field will be increased to 20,000 b/d of oil with the finalization of the drilling phase in January 2005. New peak production from Al Khalij will reach 50,000 b/d of oil.

Additional output will be provided by ten new production and injection wells with the separation, treatment, and reinjection of water, which will be handled by a new unmanned, remotely operated platform.

Total holds 100% interest in Al Khalij field.