Simulation model determines optimal tank farm design

Feb. 6, 2004
Foster Wheeler USA recently completed a detailed tankage and hydraulic study for Kuwait National Petroleum Co. which assessed the existing tank farms at three refineries.

Click on the pdf link below to view entire article.


Foster Wheeler USA recently completed a detailed tankage and hydraulic study for Kuwait National Petroleum Co. which assessed the existing tank farms at three refineries.