LEAN ENERGY MANAGEMENT-5: Enterprise-wide systems integration needed in ultradeepwater operations

Nov. 17, 2003
Use of project life-cycle processes, systems engineering analyses, and feature-based design are all required for LEM to be successful.

Click on the pdf link below to view entire article.


Use of project life-cycle processes, systems engineering analyses, and feature-based design are all required for LEM to be successful.