KOS’ extensive experience in fabricating large, complex topsides enabled the company to meet the challenges associated with the multi-discipline Perdido Project. KOS’ topsides scope required the installation of 82,000 linear ft of piping, and over 800,000 linear ft of electrical cable. In addition, KOS fabricated 1,500 tons of skidshoes to support the structure during the construction, loadout and transportation phases. The 10,000 ton structure was completed in 24 months.