GAS PROCESSING

Oct. 17, 1994
*Designates projects listed for the first time. AMERADA HESS. Tiogaa, N.D. expansion of treating facility under construction. AMOCO PRODUCTION. Hugoton field, Kan. (joint venture with Trident NGL) 500 MMcfd cryogenic gas processing plant with helium revocery and nitrogen rejection unit. Completion: Late 1996. ARCO ALASKA, Inc. Prudhoe Bay, Alas. 2.4 bscfd gas handling facilities reinjection expansion under construction and final fabrication stage. $1.2 billion. PD/Engr/DD/PE: Parsons.

*Designates projects listed for the first time.

UNITED STATES

AMERADA HESS. Tiogaa, N.D. expansion of treating facility under construction.

AMOCO PRODUCTION. Hugoton field, Kan. (joint venture with Trident NGL) 500 MMcfd cryogenic gas processing plant with helium revocery and nitrogen rejection unit. Completion: Late 1996.

ARCO ALASKA, Inc. Prudhoe Bay, Alas. 2.4 bscfd gas handling facilities reinjection expansion under construction and final fabrication stage. $1.2 billion. PD/Engr/DD/PE: Parsons. Contr: Fluor Daniel. Completion: 4th Qtr. 1994.

COASTAL. Granger, Wyo. *Stabilizer, Dehydration, expander and fractionation under construction. PD/Front end design: ABB Randall Corp. Completion: 4th Qtr. 1994.

CONOCO. Rangely, Colo. *10 MMcfd cryogenic C3 expansion under construction. Completion: October 1994.

ENRON. Sutton County, Tex. *New 50 MMcfd NGL recovery plant under construction. PD: Ortloff Engineers Ltd. Completion: 1995.

ENTERPRISE PRODUCTS. Mont Belviu, Tex. 60,000 b/d NGL fractionation expansion in engr. stage. PD: Pritchard. Completion: 1995.

GOLDSTON OIL Corp. Gilmer, Tex. *New 50 MMcfd gas treating and TEG dehy. plant in engr. stage, PD: Ortloff Engineers Ltd. Completion: 1995.

KENNECOTT. Garfield, Utah. *13,000 t/d oxygen separation unit under construction. New. Engr/DD/PE/CS: ABB Randall Corp. Completion: 1 11 Qtr. 1995.

LOUISIANA LAND & EXPLORATION Co. Fremont County, Wyo. 50 MMcfd Lost Cabin gas plant. Turnkey Engr/PE/CS: Raytheon Engineers & Constructors. Completion: Spring 1995.

MOBIL E & P U.S. Inc. Mary Ann, Coden, Ala. 80 MMcfd treating plant expansion under construction. Contr: Randall. Completion: 1994

PACIFIC OFFSHORE PIPELINE CO. Santa Barbara county, Calif. *30,000 MMcfd expansion planned.

SNYDER OIL Co. Platteville, Colo. *New 50 MMcfd NGL recovery plant under construction. PD: Ortloff Engineers Ltd. Completion: 1995.

TRIDENT NGL. Mont Belvieu, Tex. 20,000 b/d NGL capacity expansion at Gulf Coast Fractionator under construction. Engr/DD/PE/CS: Pritchard. Completion: 1994.

UNION PACIFIC RESOURCES. Ozone, Tex. *New 100 MMcfd NGL recovery plant under construction. PD: Ortloff Engineers Ltd. Completion: 1995.

*New 120 MMcfd NGL recovery plant in engr. stage. PD: Ortloff Engineers Ltd. Completion: 1995.

WILLIAMS FIELD SERVICES GROUP. Texas Panhandle. 30 MMcfd capacity natural gas turboexpander plant near Canadian. Completion: October 1994.

Hemphill County, Tex. *New 30 MMcfd NGL recovery plant under construction. PD: Ortloff Engineers, Ltd. Completion: 1994.

Ignacio, Colo. gas plant modification in engr. stage. Engr/DD/PD/CS/PE: Fish Engineering & Construction. Completion: 1994.

YUKON PACIFIC. Anderson Bay, Alas. 2,000 MMscfd LNG plant in the engr. stage. Engr: Bechtel. Completion: 3 d Qtr. 1997.

ABU DHABI

ABU DHABI NATIONAL OIL Co. 1,335 MMscfd new gas processing plant under construction. $380 MM. CS: Consolidated Contractors. Completion: 4th Qtr. 1995.

Buhasa. gas injection plant in engr. stage. Contr: Babcock King Wilkinson Ltd. Completion: 1995.

Habshan. 1,300 MMcfd expansion under construction. $2,000 MM. Engr/CS: Bechtel. Completion: 4th Qtr. 1995.

ALGERIA

SONATRACH. Al-Rar Ouest. 714 t/d LPG recovery, 1,176 t/d condensate. $150 MM. CS: Mitsubishi Heavy Industries Ltd. Completion: 2 Id Qtr. 1996.

Bethioua near Arzew. 1 bcfd revamp LNG2 natural gas liquefaction complex in the engr. stage. Engr/Contr/Lic: Kellogg. Completion: 1995.

2 million mt/y gas processing plant. Contr: Ishikawajima-Harima Heavy Industries Co. Ltd/Itochu Corp. Completion: Late 1996.

Hamra. 15 MM scum/d gas gathering and conditioning plant under construction. Design/PE/Contr: Snamprogetti. Completion: 1994.

Hassi Messaoud. 4,865 t/d LPG recovery plant in engr. stage. PD/Engr/DD/PE/CS: JGC Corp. Completion: 1997.

Oued Noumer. 1,475 t/d LPG recovery in engr. stage. Contr: CTIP. Completion: 1995.

Rhourde Chouff. 7 MM cum/d gas gathering and conditioning under construction. Engr/Design: Snamprogetti. Completion: 1994.

AUSTRALIA

ESSO AUSTRALIA. Longford, Vic. 350 mt/d LPG recovery under construction. $25 MM. PD/Engr/DD/PE: Davy John Brown. Completion: 3" Qtr. 1995.

SANTOS Ltd. S.W. Queensland. 100 MMscfd compression, dehydration, CO2 removal plant in engr. stage. $100 MM. PD: Davy John Brown. Completion: 4th Qtr. 1995.

WESTFARMERS LPG Pty. Ltd. Kwinana. *Dehydration, cryogenic extraction, practionation, product treating, refrigeration product storage expansion under construction. PD/Engr/PE: ABB Randall Corp. Completion: 1 11 Qtr. 1996.

BANGLADESH

BAKHRABAD GAS SYSTEMS Ltd. Feni gas field. 40 MMscfd solid desicant gas dehydration plant planned.

BRAZIL

PETROBRAS. Rio Grande Do Norte. 38.8 MMcfd gas processing plant planned. 152, 1 00 gpd LPG, 26,900 gpd C5. In-house. Completion: January 1995.

Cabiunas. *104.3 MMcfd gas processing plant in process design. Lic: Petrobras. Completion: 1995.

Sao Francisco. *34.8 MMcfd gas processing plant planned. Lic: Petrobras. Completion: 1996.

CANADA

AMOCO CANADA. Empress, Alta. 800 MMcfd natural gas liquids processing plant. $C3 MM. Completion: May 1995.

PANCANADIAN PETROLEUM Ltd. Empress, Alta. 800 MMcfd natural gas liquids processing plant. (joint venture with Alberta Energy Co.) $C3 MM. Completion: May 1995.

TOTAL PETROLEUM CANADA Ltd. Spirit River, Alta. Lo-cat hydrogen sulfide oxidation process unit. Contr: Colt Engineering.

WESTCOAST ENERGY INC. Chetwynd, B.C. 300 MMscfd expansion of sulfinol gas treating unit in engr. stage. $230 MM. PD/Engr/DD/PE: Delta Catalytic Engr. and Construction. Completion: November 1994.

CHINA

Shenzhen City, Guangdong. $150 MM processing complex. Capacities will be 86,200 mt/y LPG, 70,000 mt/y polypropylene, 100,000 mt/y gasoline.

ARCO CHINA, Inc. 400 MMscfd offshore gas processing plant to process Yacheng 13-1 production for Hong Kong and Hainan Island and a 60 MMscfd gas plant and condensate facilities onshore at Hainan Island. Design: Brown & Root. Completion: 1995.

CHINA NATIONAL TECHNICAL IMPORTS Corp. Puyang. 75 MMcfd NGL recovery plant in the engr. stage. Engr: CTIP.

SHANGHAI PETROLEUM. Pingu Onshore Gas Plant. *Fractionation, turboexpander and LPG in engr. stage. New plant. PD: ABB Randall Corp. Completion: 4th Qtr. 1994.

COMMONWEALTH OF INDEPENDENT STATES

formerly U.S.S.R.)

GAS PROM. Novy Urenval, 250 MMcd gas processing plant in the engr. stage. DD/Proc/Engr/Contr: John Brown.

SOVIET MINISTRY OF OIL REFINING AND PETROCHEMICAL INDUSTRY. Surgut and Tobolsk. Gas processing plants. $10 billion. Feasibility study: Combustion Engineering: McDermott International, Mitsubishi, Mitsui. Completion: Late 1990's.

TENGIZCHEVROIL. Tengiz, Kazakhstan. 125 MMscfd C3 refrigeration (JT) process. (KTZ-2 project) 70,000 b/d total products capacity. Under construction. Completion: 1994.

125 MMscfd C3 refrigeration (JT) process. (KTZ-3 project) 70,000 b/d total products capacity. Under construction.

DENMARK

DANISH OIL NATURAL GAS. Stenlille. dehydration unit and preheater unit with 127 MMscfd each in the engr. stage. Design/Engr/Contr: John Brown.

NORSK SHELL. Sola. Expansion of TIP Kero Merox.

EGYPT

EGYPTIAN GENERAL PETROLEUM Co. Amerya. 300 MMscfd gas to produce 280 MMscfd gas, 350 Vd LPG, and 83 t/d condensate. Completion: March 1995.

GERMANY

BEB ERDGAS u. ERDOL GmbH. Soltau, Sohlingen. 16.9 MMscfd LTS unit and cold fractionator unit in the engr. stage. Engr: DSD Dillinger Stahlbau.

Friedrichseck. 4-LTS units each at 35.3 MMscfd in the engr. stage. Engr: DSD Dillinger Stahlbau.

Manslagt Platform. 35.3 MMscfd dehydration unit in the engr. stage. Design/Engr/Contr: DSD Dillinger Stahlbau.

DEA MINERALOL AG. Hemsbunde, Bodersen. 16.9 MMscfd LTS unit in the engr. stage. Design/Engr/Contr: DSD Dillinger Stahlbau.

HULS AG. Marl. 1.6 MMscf/hr hydrogen plant. $21 MM. Contr: Uhde.

STATOIL. Etzel. 2-dehydration units at 508 MMscfd each in the engr. stage. Design/Engr/Contr: DSD Dillinger Stahlbau.

WINTERSHALL KASSEL. Olbernhau. 2-dehydration units at 296 MMscfd each in the engr. stage. Design/Engr/Contr: DSD Dillinger Stahlbau.

INDIA

GAS AUTHORITY OF INDIA Ltd. Auraiya, Uttar Pradesh. $1.38 billion separation plant planned.

Bijaipur, Madhya Pradesh. gas processing plant to recover 8,000 b/d LPG,

Guna, Madhya Pradesh. $490 MM gas processing plant planned.

Lakwa. 85,000 mt/y LPG plant proposed. Completion: April 1996.

Usar, Maharashtra. 140,000 mt/y LPG plant. Completion: Mid-1996.

Gandhar, Gujarat. (Joint venture with Indian Petrochemical Corp.) 390,000 t/y LPG plant planned. Completion: 1998.

MADRAS REFINERIES Ltd. Thanjavur district. 10,000 b/d gas processing plant to handle crude and associated gas from Cauvery basin fields.

INDONESIA

EXXON PRODUCTION. Natuna Is. LNG plant in the engr. stage. Engr: Bechtel. Completion: 41 Qtr. 1995.

ARCO. Offshore. *114 MMcfd carbon dioxide removal under construction. Lic: UCC. Engr: KTI. Completion: 1994.

ITALY

SARLUX SPA. Sarroch. *New 550 MW IGCC plant under construction. PD: Foster Wheeler Italiana. Completion: January 1995.

JAPAN

TEIKOKU SEKIYU. Nagaoka. 42 MMcfd natural gas treatment (CO2 removal) Contr: Mitsubishi Heavy Industries Ltd. Completion: 4th Qtr. 1994.

KOREA

KOREA GAS Corp. Inchon, South Korea. 3 MM t/y LNG receiving terminal in the engr. stage. Lic: Kellogg. Engr: Kellogg/Hyundai. Contr: Hyundai. Completion: 1996.

KUWAIT

KUWAIT NATIONAL PETROLEUM Co. Mine Al-Ahmadi. acid gas removal with throughput of 200 MMcfd gas and 40,000 b/d condensate. Planned. Completion: Mid 1997.

LIBYA

NATIONAL OIL Corp. Sebha. 500 b/d LPG recovery. Engr. stage. Contr: CTIP. Completion: 1996.

WAHA OIL. 35 MMscfd compression, refrigeration and distillation plant. Design phase. $10 MM. Contr: Monenco Agra, Completion: 1995.

MALAYSIA

PETRONAS. Bintulu. 100 MMcfd gas processing plant. $750 MM. (joint venture with Royal Dutch/Shell). Under construction. Yield 12,000 b/d. Completion: 1996.

Kertih. 1,000 MMcfd plant in engr. stage. Contr: John Brown. Completion: 1994.

MEXICO

PEMEX. Neuvo Pemex, Tab. 500 MMcfd cryogenic plant under construction.

*104,000 b/d fractionation of liquids in engr. stage.

NIGERIA

CHEVRON. Escravos. 165 MMscfd gas gathering and compression in engr. stage. $422 MM. PD/DD/Engr: Bechtel. Completion: 3,d Qtr. 1996.

NIGERIA LNG Ltd Benny Island. 4 MM t/y LNG. Completion: Early 1995.

River State. LNG plant planned. Lic: Technip/Snamprogetti. Engr: Kellogg.

NIGERIAN NATIONAL PETROLEUM Corp. 165 MMcfd turboexpander plant. 6,700 b/d LPG, 1,700 b/d C5, plus. Planned. $450 MM.

PAKISTAN

OIL & GAS DEVELOPMENT Corp. Lashari field. 30 MMscfd gas dehydration unit. TEG process.

Pirkoh field. 100 MMscfd gas dehydration unit. TEG process.

Sukkur. 235 MMscfd natural gas dehydration and CO2 removal in engr. stage. Contr: CTIP. Completion: 1995.

SUI SOUTHERN GAS CO. LTD. Sui fields. Balochistan. 2-120 MMscfd gas purification and dehydration plants planned. (MEA & TEG absorption). $62 MM. Completion: 1994-1995.

District Hyderabad. Badin Gas fields. 275 mt/d LPG recovery plant. Cryogenic expansion planned. $33 MM. Completion: December 1994.

PHILLIPS PETROLEUM. LNG plant in the engr. stage. Engr: Bechtel. Completion: 4th Qtr. 1995. PERU

PETROLEOS DEL PERU. Camisea-Cuzco. 1,200 MMcfd plant. 24,100 b/d LPG, 14,400 b/d gasoline, 10,100 b/d naphtha and 5,100 b/d kerosene plant. $1,300 MM. Completion: 1995.

QATAR

NATIONAL OIL DISTRIBUTION. Umm-Said. 10,000 b/d fractionation of heavy condensate (from North Gas field) in engr. stage.

QATAR LIQUIFIED GAS Co. Ras Laffan. 970 MMscfd gas processing plant and 1,500,000 t/y condensate recovery. Engr. stage. $110 MM. PD/Engr/DD/PE/CS: Toyo Engineering.

SPAIN

ELCOGAS. Puertollano. 160 MMcfd gas desulfurization plant. Engr. stage. PD/Engr/DD/PE/CS: Krupp Koppers. Completion: 1996.

TUNISIA

BRITISH GAS TUNISIA. Hannibal. 350 MMscfd gas in the engr. stage. PD/Engr: Bechtel. Completion: 2nd Qtr. 1995.

70.0 MMcfd nitrogen rejection in engr. stage. $2.0 MM. Design/Engr: Costain Oil, Gas & Process Ltd.

Sfax. *70 MMcfd new nitrogen rejection plant under construction. $2 MM. Design/Engr: Costain Oil, Gas & Process Ltd. Completion: 1994.

UNITED KINGDOM

BRITISH GAS. *New jacket and template plant under construction. $50 MM. Engr/DD/PE/CS: John Brown Engr. & Const.

CHEVRON U.K. near North Sea. *750 MMcfd plant planned. (joint venture with Conoco U.K.) $330 MM. Engr/PE/CS: Fluor Daniel Inc. Completion: end 1998.

ENRON GAS PROCESSING (U.K.) Ltd. Seal Sands on Teesside. 400 MMcfd gas processing plant in engr. stage. $70 MM. Engr/PE/CS: Costain Engr. Completion: October 1995.

HAMILTON OIL Co. Ltd. N. Wales. 250 MMscfd gas processing plant in engr. stage. PE/Engr: Parsons Co. Completion: 4th Qtr. 1995.

MOBIL NORTH SEA Ltd. St. Fergus, Scotland. Phase 11 of a 1.15 bcfd gas processing plant under construction. PD/Engr/DD/PE/CS: Parsons. Completion: 4th Qtr. 1994.

VENEZUELA

CORPOVEN SA. Anzoategui. 400 MMcfd expansion for gas processing capacity.

Santa Barbara, Monagas. 400 MMcfd cryogenic gas separation plant. Contr: Technip/Inelectra/Dit-Harris. Completion: 1st Qtr. 1996.

Jose, Anzoategul. 35,000 b/d NGL fractionation train. Contr: Technip/inelectra/Dit-Harris. Completion: 151 Qtr. 1996.

VIET NAM

PETROVIETNAM. Vung Tao. (joint venture with Petroleum Authority of Thailand Mitsui & Co. - 70% owned) 10.5 bcf/year new gas processing plant. $140 MM.

YEMEN

YEMEN HUNT OIL CO. 400 MMcfd gas processing plant under construction.

400 MMcfd expansion of gas processing plant in the engr. stage.

300 MMcfd gas processing plant in the engr. stage.