One wellhead platform was added during the project. CNOOC said five wells are producing 53 MMcfd; design peak production of 54 MMcfd is expected this year.
The field lies in 70 m of water in the Yinggehai basin in the Beibu Gulf. CNOOC is operator and holds 100% interest (OGJ Online, May 27, 2015).