Enbridge to build, operate oil pipeline lateral for Stampede development
Enbridge Inc., Calgary, reported it will build, own, and operate a crude oil pipeline in the Gulf of Mexico to connect the planned Stampede development, operated by Hess Corp., to an existing third-party pipeline system. The lateral pipeline is expected to cost $130 million and be operational in 2018, Enbridge said.